WASTE TO ENERGY PLANT, GHAZIPUR

• Ghazipur Waste To Energy (WTE) project is


Public Private Partnership(PPP) project of Delhi
Government for Scientific management of MSW.
• EDMC will provide 2000 tons of MSW per day
for processing
• IL&FS Environment has set up a Waste to
Energy plant at the Ghazipur dumpsite, which
receives more than 2000 tons per day of Delhi's
municipal solid waste. It provides a scientific
solution to address some of the environmental,
health and safety hazards posed by the 29-
hectare dumping ground containing 12 million
tons of accumulated garbage.
• The plant has a built capability to process 2000
tons per day and generate 12 MW of Green
Power to address East Delhi’s growing waste.
Environment Management System
Management of Solid Residues:
• Bottom ash
o Making hollow block for construction work.
o Raw material for cement production.
o Can be mixed with RMC.
o Can be used as filling material.
• Fly ash & APC residue
o Depending upon the characteristics, can be used for
cement blocks and asphaltic mixtures.
o To be disposed at secured landfills after testing its
leachability.