MARCH 2 – MARCH

8, 2018
Weather chart
03/02/18 to 03/08/18
Weekly safety man-hour report
Safety statistics report
ACCOMPLISHMEN
T PHOTOS
INSTALLATION OF
PRE-CAST
PLASTERING OF EXTERIOT
WALL (LEFT SIDE)
ON-GOING CHB LAYING @ 8 TH

FLOOR
CONCRETE POURING OF
TH
12 FLOOR
LOOK AHEAD
Installation of
SCHEDULE AAC blocks at
th th
4 and 5 floor
Plastering of exterior wall (left
side)
Chb laying and plastering at
perimeter of 8f and 9f
Concreting of 13 floor –
th