Quality & Supplier Management
Outline
History
Early Involvement
Proposal
ASMB
RFP
Source Selection
SDD
Production
Functional and
Acquisition Critical Design Physical
Planning Review Configuration Audits Low Rate Full Rate
Production Production
Role of Quality Engineers – Pre Award and Design Role of Quality Engineers - Production
Qualify supplier for specific work scope Participate in on-site joint reviews of sub-tier suppliers
Monitor supplier processes for compliance Conduct on-site inspection of process compliance during each
Establish and monitor corrective actions when site visit
necessary Establish and monitor corrective actions when necessary
Team with first tier supplier on supply chain monitoring Conduct three-way (Government, Prime, Supplier) buy-off of
Establish baseline for production qualification products
As necessary, develop or disqualify supplier prior to Resolution of material & process discrepancies (MRB)
production readiness review
End Item Data Packet definition to ensure traceability to
requirements
Proposal Phase
Participate in Alpha Negotiations
QA Submits a Basis of Estimate
Participate in Supplier Proposal Evaluation
Approver of Contract Deliverables Definition
Participate in the Final Proposal Review
Analysis (FMEA)
Supplier A 1 Date Y G
Develop/Review Work
Supplier B 2 Y G
Instructions
3 R G
3 Y G
Define/Develop/Document 2
3
Y
Y
G
Critical Processes 3 R G
Total Possible
Supplier Self-
Assessment
NGMS Audit
NGMS Audit
Points
Points
Points
Points
Prime 19160 Form 260 Green Yellow Red
5.0
6.0
Quality Management System
Management Responsibility
Resource Management
13
10
6
2
6
2
0
1
0
54
63
30
43
43
23
60
68
32
71.7%
63.2%
71.9%
7.0
Product Realization 10 1 0 41 32 44 72.7%
7.3
Design and Development 6 6 3 54 33 60 55.0%
7.4
Purchasing 11 3 3 56 42 68 61.8%
7.5
Production & Service Provision 15 1 2 60 50 72 69.4%
7.6
Control of Monitoring Measuring 8 1 1 40 27 40 67.5%
8.0
Measurement, analysis and improvement 16 1 2 71 52 76 68.4%
8.3
Control of Nonconforming Product 3 2 3 29 16 32 50.0%
8.4
Analysis of Data 3 0 0 12 9 12 75.0%
8.5
Improvement 7 2 3 44 28 48 58.3%
N/A
Foreign Object Elimination 0 0 0 0 0 N/A
ESD Program 17 0 1 72 66 72 91.7%
N/A
Software 0 0 0 0 0 N/A
Total Points
554 398 612
Notes:
Suppliers Quality Management System has been properly documented in accordance with ISO 9001:2000
standards. Necessary Processes have been identified which pertain to their application throughout the
organization. Assessment results indicate several major and minor deficiencies in understanding and
meeting requirements, obtaining results of process improvement and effectiveness, and continual
improvement of process based on objective measurement.
NGMS Approval
Surveillance Plan
Defines the Surveillance Program
Enforces the Mission Assurance Requirements
Surveillance Includes Mandatory Inspection Points
Production Processes
Focus on Process Improvement
Lean/Six Sigma
Quarterly Scorecard Input
Corrective Action
F = Frequent S = Seldom
Calibration System S S
Tool Control S S
Data Management S F
Configuration Management F F
Product Identification S S
Training Records S F
Procurement System F S
Supplier Management F F
MRB S F
Product Acceptance
Verification That All Items Are Being Delivered
Hardware, Software, Documentation, Test
Results, Spares, Data and Records
Verification That All Items Meet Contractual
Requirements
Item Built IAW the Documented System
All Requirements Are Verified
Records Are Available
As-Built Configuration Is Controlled