Kota t h e r m a l power s t a t i o n
ELECTRICAL ENGINEERING
GOVERNMENT ENGINEERING COLLEGE ,AJMER
Guided By :- Presented By :-
Mr. K.G SHARMA ABHISHEK MATHUR
Associate professor VII th semester
Electrical Branch
KOTA THERMAL POWER STATION
REASON FOR CHOOSING KOTA FOR THERMAL
PLANT SETUP
INTRODUCTION
KSTPS is first coal based power plant in Rajasthan.
It is located ideally on the left bank of CHAMBAL
River at the upstream of KOTA BARRAGE.
STAGES
Unit 3 – 210 MW
Unit 5 – 210 MW Unit 6 – 195 MW
Unit 4 – 210 MW
• GENERAL LAYOUT
• COAL HANDLING PLANT
• PROCESS OF STEAM GENERATION
• TURBINE
• GENERATOR
• SWITCHYARD
PLANT OVERVIEW
COAL HANDLING PLANT
OVERVIEW OF COAL HANDLING PLANT
Row coal from Bharat
To KSTPS from gurla via Wagon trippler
coal ltd. Dhanbad &
a single railway track
bilaspur(MP)
CONVEYING SYSTEM
K.S.T.P.S
TURBINE
STEAM TURBINE
BOILER & SUPERHEATER
STEAM AT
545 C STEAM AT
535 C
H P TURBINE
REHEATER
M P TURBINE
STEAM AT
STEAM AT 545 C
535 C
L P TURBINE
TURBO GENERATOR
Designed for continuous operation at the rated output.
Directly coupled with steam turbine, rotated at high speed
of 3000 RPM.