You are on page 1of 17

Weekly

Report

Anggota Kelompok :
1. Desmita Mariyani BR. Manullang
2. Nurhabibah
3. Rahmadi Wahyudi

Sonolog, Stasiun Pengumpul 4, Safety Meeting


FINAL DRAFT

Outline

1 Sonolog

2 Stasiun Pengumpul 4

3 Safety Meeting
Section 1

Sonolog
Bunyu Offshore Rig, East Kalimantan
FINAL DRAFT

Sonolog

Berfungsi untuk mengetahui ketinggian fluid level dari suatu sumur. Prinsip
kerjanya yaituTransparency
dengan memberikan getaran ke dasar sumur yang berasal dari gas N2
lalu kemudian hasil getaran tersebut di record sehingga menghasilkan pola grafik
untuk menentukan ketinggian dari fluid (Wealth
level Report
tersebut.
1,706 LHKPN
of State Official)
71.62
Fairness Accountability ASEAN SCORE CARD 2014
Compulsory report related to the
Board of Directors, Board of
Alat yang digunakan sebagai berikut :
Assessment by the Indonesian Institute
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
public companies in ASEAN, based on
95.2% of the 1,792 total
instruction from Board of
Independency Responsibility compulsory reports target in
Commissioners
2014 (63.2% in 2013)

Gas gun Echometer Total Well


Managemen
FINAL DRAFT

Berikut data sumur yang kami lakukan tes :

Transparency

1,706 LHKPN
71.62
(Wealth Report of State Official)
Fairness Accountability ASEAN SCORE CARD 2014
Compulsory report related to the
Board of Directors, Board of
Assessment by the Indonesian Institute
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
public companies in ASEAN, based on
95.2% of the 1,792 total
instruction from Board of
Independency Responsibility compulsory reports target in
JTA - 225 JTA - 105 2014 (63.2% in 2013) JTA - 76
Commissioners

• Liquid Level Depth 229,12 m • Liquid Level Depth 29,27 m • Liquid Level Depth 140,21 m
• Pump Intake Depth 409,47 m • Pump Intake Depth 106,07m • Pump Intake Depth 231 m
• Formation Depth 437 m • Formation Depth 431,50 m • Formation Depth 418 m
• Ketinggan Fluida 207,88 m • Ketinggan Fluida 402,23 m • Ketinggian Fluida 277,79 m
FINAL DRAFT

Berikut data sumur yang kami lakukan tes :

Transparency

1,706 LHKPN
71.62
(Wealth Report of State Official)
Fairness Accountability ASEAN SCORE CARD 2014
Compulsory report related to the
Board of Directors, Board of
Assessment by the Indonesian Institute
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
public companies in ASEAN, based on
95.2% of the 1,792 total
instruction from Board of
Independency Responsibility compulsory reports target in
JTA - 124 JTA - 112 2014 (63.2% in 2013) PAM - 708
Commissioners

• Liquid Level Depth 8,94 m • Liquid Level Depth 51,0 m • Liquid Level Depth 24,89 m
• Pump Intake Depth 401,43 m • Pump Intake Depth 541.17 m • Pump Intake Depth 120,50 m
• Formation Depth 761,50 m • Formation Depth 639 m • Formation Depth 169,89 m
• Ketinggan Fluida 752,56 m • Ketinggan Fluida 588 m • Ketinggian Fluida 145 m
FINAL DRAFT

Berikut data sumur yang kami lakukan tes :

Transparency

1,706 LHKPN
71.62
(Wealth Report of State Official)
Fairness Accountability ASEAN SCORE CARD 2014
Compulsory report related to the
Board of Directors, Board of
Assessment by the Indonesian Institute
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
public companies in ASEAN, based on
95.2% of the 1,792 total
instruction from Board of
Independency Responsibility compulsory reports target in
PAM - 759 JTA - 46 2014 (63.2% in 2013) MGT - 04
Commissioners

• Liquid Level Depth 167,90 m • Liquid Level Depth 90,96 m • Liquid Level Depth 669,20m
• Pump Intake Depth 232,33 m • Pump Intake Depth 387,65 m • Pump Intake Depth - m
• Formation Depth 301,20 m • Formation Depth 430 m • Formation Depth 739,75 m
• Ketinggan Fluida 133,3 m • Ketinggan Fluida 339,04 m • Ketinggian Fluida 70,55 m
Section 2

Stasiun Pengumpul 4
Pertamina Head Office, Jakarta
FINAL DRAFT

Stasiun Pengumpul 4

SP (Stasiun Pengumpul) 4 merupakan salah satu stasiun pengumpul yang ada


dilapangan Pamusian.
Transparency Di SP ini dialiri dari 10 sumur yang ada dilapangan Pamusian dan
menerima hasil produksi dari sumur-sumur yang menggunakan tangki sendiri dan
yang tertampung sementara ditruck penampungan. 1,706 LHKPN
(Wealth Report of State Official)
71.62
Fairness Accountability ASEAN SCORE CARD 2014

Pengetesan hasil produksi di Compulsory


SP 4 ini Board
dilakukan
report related to the
Board of Directors, of dengan waktu tes 4
jam/sumur. Kegunaannya untuk mengetahui banyaknya laju produksi
for Corporatesetiap hari nya.
Assessment by the Indonesian Institute
Commissioners and managerial
Directorship, comparing
level
Setelah tes selesai dilakukan, maka akan didapat hasil produksi GCGper day dari
implementation sumur
in Pertamina
public companies in ASEAN, based on
with

yangIndependency
telah di tes. Contoh hasil test
Responsibility
produksi sebagai berikut : instruction from Board of
95.2% of the 1,792 total
compulsory reports target in
Commissioners
2014 (63.2% in 2013)

Pada sumur A dengan menggunakan tinggi tank 400 centimeter lalu kemudian
didapatkan hasil pengukuran tinggi fluida dari atas tank adalah 313 centimeter, maka :

 Qgross = (400-313) x 0,44 x 4 jam = 153,12


Bpd

Maka hasil tes laju produksi (Qgross) pada 400 cm


313 cm

sumur A adalah 153,12 Bpd


FINAL DRAFT

Alur Produksi di SP 4

Transparency

1,706 LHKPN
71.62
(Wealth Report of State Official)
Fairness Accountability ASEAN SCORE CARD 2014
Compulsory report related to the
Board of Directors, Board of
Assessment by the Indonesian Institute
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
Jika public companies in ASEAN, based on
95.2% of the 1,792 total
dilakukanIndependency instruction from Board of
Responsibility compulsory reports target in
Commissioners
2014 (63.2% in 2013)
tes
produksi,
maka
alurnya
akan seperti
ini
FINAL DRAFT

Alur Produksi di SP 4

Transparency

1,706 LHKPN
71.62
(Wealth Report of State Official)
Fairness Accountability ASEAN SCORE CARD 2014
Compulsory report related to the
Board of Directors, Board of
Assessment by the Indonesian Institute
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
Hasil produksi di Tank A public companies in ASEAN, based on
95.2% of the 1,792 total
dialirkan ke SPU jika instruction from Board of
Independency Responsibility compulsory reports target in
Commissioners
kekurangan atau2014sudah(63.2% in 2013)

mau penuh
Section 3

Safety Meeting Refinery Unit VI Balongan

Keselamatan & Keamanan Laboratorium


FINAL DRAFT

Pentingnya Keselamatan & Keamanan Laboratorium

Ekperimen dapat menjadi suatu kegiatan menyenangkan dan dapat juga


membahayakan, karena :
Transparency
 Melibatkan bahan-bahan kimia yang berbahaya.
 Menggunakan benda tajam. 1,706 LHKPN
(Wealth Report of State Official)
71.62
 Menggunakan alat elektrik.
Fairness Accountability ASEAN SCORE CARD 2014

 Menggunakan api/ pemanasan. Compulsory report related to the


Board of Directors, Board of
Assessment by the Indonesian Institute
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
public companies in ASEAN, based on
95.2% of the 1,792 total
instruction from Board of
Independency Responsibility compulsory reports target in
Commissioners
2014 (63.2% in 2013)

Sebab terjadinya kecelakaan

 Kurangnya pemahaman tentang sifat dan karakter bahan-bahan kimia.


 Kurang tersedianya fasilitas keamanan dan perlengkapan perlindungan yang
memadai.
 Tidak menggunakan perlengkapan perlindung yang seharusnya.
 Kurang bersikap hati-hati selama praktikum.
FINAL DRAFT

Siapa yang bertanggungjawab?

 Lembaga dan staf laboratorium bertanggungjawab atas kelayakan, kelengkapan,


Transparency
dan pemeliharaan fasilitas serta keamanan.
 Setiap orang yang berada di laboratorium 1,706 harus
LHKPN bekerja secara hati-hati,
71.62
taat
aturan, dan disiplin.
(Wealth Report of State Official)
Fairness Accountability ASEAN SCORE CARD 2014
Compulsory report related to the
Board of Directors, Board of
Assessment by the Indonesian Institute
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
public companies in ASEAN, based on
95.2% of the 1,792 total
instruction from Board of
Independency Responsibility compulsory reports target in
Commissioners
2014 (63.2% in 2013)

Aturan Umum Laboratorium

 Penataan ruang yang baik.


 Gunakan perlengkapan yang sesuai.
 Sebelum bekerja, kenali kemungkinan bahaya yang mungkin terjadi.
 Berikan tanda peringatan pada setiap perlengkapan.
 Setiap percikan atau kebocoran yang ditemukan harus segera dibersihkan.
FINAL DRAFT

Jika terjadi kecelakaan….?

 Setiap orang harus tanggap menghadapi kecelakaan.


 Kenali kondisi, mulai dari:
Transparency

o Gambaran kecelakaan.
o Sebab kecelakaan.
1,706 LHKPN
71.62
(Wealth Report of State Official)
ASEAN SCORE CARD 2014
o Kemungkinan tindakan,
Fairness
tentukan
Accountability
prioritas menyelamatkan
Compulsory report related to the
korban atau
menangani penyebab kecelakaanBoard sesuai kondisi
of Directors, Board of (ambil tindakan yang kecil
Assessment by the Indonesian Institute
resikonya).
Commissioners and managerial
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
public companies in ASEAN, based on
95.2% of the 1,792 total
instruction from Board of
Independency Responsibility compulsory reports target in
Commissioners
2014 (63.2% in 2013)

Perlengkapan Keselamatan

1. Perlindungan untuk kondisi yang tidak biasa.


2. Perlindungan untuk kondisi yang sudah diprediksi bahayanya.
FINAL DRAFT

Pertolongan Pertama

• Pertolongan pertama pada kecelakaan dilaboratorium dimaksudkan untuk


memberikan perawatan darurat sebelum ditindaklanjuti oleh dokter.
Transparency

• Tujuan dari P3K adalah untuk: 1,706 LHKPN


I. Menyelmatkan korban.
71.62
(Wealth Report of State Official)
Fairness Accountability ASEAN SCORE CARD 2014
II. Meringankan penderitaan korban, dan mencegah
Compulsory cedera yang lebih parah.
report related to the
III. Mempertahankan daya tahan korban sampai pertolongan
Board of Directors, Board of
Commissioners and managerial
medisby datang.
Assessment the Indonesian Institute
for Corporate Directorship, comparing
level
GCG implementation in Pertamina with
public companies in ASEAN, based on
95.2% of the 1,792 total
instruction from Board of
Independency Responsibility compulsory reports target in
Commissioners
2014 (63.2% in 2013)
Cedera Mata
(Example)

Penanganan Umum

1. Luka di mata, segera bawa ke dokter dengan mata dibalut kasa steril.
2. Luka di kelopak mata, tutup bagian luka dengan kasa steril yang dibasahi air (jaga agar selalu
basah) dan bawa ke dokter.
THANK YOU
FOR YOUR
ATTENTION

You might also like