CONSTRUCTION STANDARD
PROTOCOLS

• SAFE WORKING ENVIRONMENT


• QUALITY OF WORK
• ON-TIME PROJECT DELIVERY
SAFE WORKING ENVIRONMENT

• ENSURE SAFETY SIGNAGES AT SITE


• WEAR BASIC PPE UNIFORM (HARD HAT, SAFETY VEST,
SAFETY SHOES/BOOTS)
• LOCK OUT TAG OUT (When working with electricity or
near buried electrical utilities)
SAFETY FIRST
ARE WE FOLLOWING STANDARD
SAFETY PROTOCOLS?
QUALITY OF WORK

• FOLLOW PROJECT STANDARDS ON QUALITY


(Construction Standards Reference: Petron Bluebook)
• ENSURE STRICT ADHERENCE WITH QUALITY CONTROL
TO AVOID BACK JOBS
• ASK WHEN IN DOUBT
GOOD QUALITY = GOOD CONTRACTOR
PREVIOUS PROJECTS

SJ FAB, MARIVELES

SOLEDAD ENRIQUEZ
TIMELY PROJECT DELIVERY

• PROPER PROJECT COORDINATION


• SIMULTANEOUS WORK OF CIVIL AND MECHANICAL
WORKS
• NO LAG TIME AT SITE
• BE PRO-ACTIVE
OTHER PROJECT CONCERNS
1. SITE PROGRESS PHOTOS FOR IMPROVEMENT
-Always make sure all personnel wears proper PPE when taking progress
photos
-Area to be captured shall be cleared from Debris

-Always capture before and after Photo especially when there is DP


Replacement/Installation
2. UGT LAYING STANDARD DEPTH
-For 2k DWFGT, Standard Depth of Excavation should be not less than 3.0 m
-For 2k/2k Split Type DWFGT, Excavation should be not less than 3.2
-For 4k, 6k and 6k Split Type DWFGT, Excavation should not be less than 4.0 m