The document discusses implementation concerns for a construction project. It outlines three main priorities: maintaining a safe working environment, ensuring quality of work, and delivering the project on time. Specific protocols are provided for safety, including use of proper protective equipment and lock out/tag out procedures. Quality standards from the Petron Bluebook must be followed to avoid rework. Proper coordination, simultaneous work, and proactivity are emphasized for timely completion. Additional concerns noted include safety protocols for progress photos and underground gas line laying depth standards.
Original Description:
Construction Implementation concerns is Gasoline Stations
The document discusses implementation concerns for a construction project. It outlines three main priorities: maintaining a safe working environment, ensuring quality of work, and delivering the project on time. Specific protocols are provided for safety, including use of proper protective equipment and lock out/tag out procedures. Quality standards from the Petron Bluebook must be followed to avoid rework. Proper coordination, simultaneous work, and proactivity are emphasized for timely completion. Additional concerns noted include safety protocols for progress photos and underground gas line laying depth standards.
The document discusses implementation concerns for a construction project. It outlines three main priorities: maintaining a safe working environment, ensuring quality of work, and delivering the project on time. Specific protocols are provided for safety, including use of proper protective equipment and lock out/tag out procedures. Quality standards from the Petron Bluebook must be followed to avoid rework. Proper coordination, simultaneous work, and proactivity are emphasized for timely completion. Additional concerns noted include safety protocols for progress photos and underground gas line laying depth standards.
• QUALITY OF WORK • ON-TIME PROJECT DELIVERY SAFE WORKING ENVIRONMENT
• ENSURE SAFETY SIGNAGES AT SITE
• WEAR BASIC PPE UNIFORM (HARD HAT, SAFETY VEST, SAFETY SHOES/BOOTS) • LOCK OUT TAG OUT (When working with electricity or near buried electrical utilities) SAFETY FIRST ARE WE FOLLOWING STANDARD SAFETY PROTOCOLS? QUALITY OF WORK
• FOLLOW PROJECT STANDARDS ON QUALITY
(Construction Standards Reference: Petron Bluebook) • ENSURE STRICT ADHERENCE WITH QUALITY CONTROL TO AVOID BACK JOBS • ASK WHEN IN DOUBT GOOD QUALITY = GOOD CONTRACTOR PREVIOUS PROJECTS
SJ FAB, MARIVELES
SOLEDAD ENRIQUEZ TIMELY PROJECT DELIVERY
• PROPER PROJECT COORDINATION
• SIMULTANEOUS WORK OF CIVIL AND MECHANICAL WORKS • NO LAG TIME AT SITE • BE PRO-ACTIVE OTHER PROJECT CONCERNS 1. SITE PROGRESS PHOTOS FOR IMPROVEMENT -Always make sure all personnel wears proper PPE when taking progress photos -Area to be captured shall be cleared from Debris
-Always capture before and after Photo especially when there is DP
Replacement/Installation 2. UGT LAYING STANDARD DEPTH -For 2k DWFGT, Standard Depth of Excavation should be not less than 3.0 m -For 2k/2k Split Type DWFGT, Excavation should be not less than 3.2 -For 4k, 6k and 6k Split Type DWFGT, Excavation should not be less than 4.0 m