Professional Documents
Culture Documents
PRESENTED BY
GOLDEN FUTURE MYANMAR POWER
April 4th 2019
GFMP
1. Introduction
2. Scope of Work
10.Method
10.Method of Statement for Lighting Fixture Installation
11.Method
11.Method of Statement for Fabrication of Support
GFMP
1. INTRODUCTION
This Method of Statement is issued as a confidential document and at all times
remains the property of GFMP. This MOS is a live document and will be
updated from time to time to incorporate changing site circumstance and
client’s recommendations. Copies of this plan will be provi ded to
subcontractors and other parties working under GFMP.
2. SCOPE OF WORK
Supply, Delivery and Installation of Electrical System.
Producer
Producer
Producer