Sampling, Testing Inspection For Structural Works: CE157 Group 5
Sampling, Testing Inspection For Structural Works: CE157 Group 5
INSPECTION FOR
STRUCTURAL WORKS
CE157
GROUP 5
Asi, Jenny A.
Belarmino, Aica Mae S.
Galera, Anne Rose O.
Santillan, Adran Brylle S.
Supan, Josh Bryan P.
CONSTRUCTION
QUALITY CONTROL ▪ Input Materials and
Equipment
(CQC) Components
▪ In-process Activities
▪ Testing ▪ Stage Completion
▪ Inspections ▪ Interfacing
▪ Final Completion
INSPECTIONS
Structural Works
1. Current condition REASONS FOR
2. Specify the type CONDUCTING
3. Repair or replacement STRUCTURAL
4. Influence of deterioration
INSPECTIONS
5. Cost effective
6. Performance
INSPECTION PHASES OF
CONCRETE STRUCTURE
PRELIMINARY INSPECTION
PRELIMINARY INSPECTION
Gather Relevant Information
Identify Problems
Determine Possible Causes
Classification of Identified Problems
Record Problems and Related Data
Preliminary Inspection Report
Recommended Rehabilitation Method
DETAILED
Closer examination INSPECTION
Reasons for Detailed
Serious deterioration Inspection