SAMPLING, TESTING

INSPECTION FOR
STRUCTURAL WORKS
CE157
GROUP 5
Asi, Jenny A.
Belarmino, Aica Mae S.
Galera, Anne Rose O.
Santillan, Adran Brylle S.
Supan, Josh Bryan P.
CONSTRUCTION
QUALITY CONTROL ▪ Input Materials and
Equipment
(CQC) Components
▪ In-process Activities
▪ Testing ▪ Stage Completion
▪ Inspections ▪ Interfacing
▪ Final Completion
INSPECTIONS
Structural Works
1. Current condition REASONS FOR
2. Specify the type CONDUCTING
3. Repair or replacement STRUCTURAL
4. Influence of deterioration
INSPECTIONS
5. Cost effective
6. Performance
INSPECTION PHASES OF
CONCRETE STRUCTURE
PRELIMINARY INSPECTION
PRELIMINARY INSPECTION
Gather Relevant Information
Identify Problems
Determine Possible Causes
Classification of Identified Problems
Record Problems and Related Data
Preliminary Inspection Report
Recommended Rehabilitation Method
DETAILED
Closer examination INSPECTION
Reasons for Detailed
Serious deterioration Inspection

Significant increase on loads

Condition of the structure


DETAILED
INSPECTION
PROCESS
TESTING
Structural Works
RECORDS SAMPLE REGISTER
▪ Site Order Book ▪ Sample Number
▪ Material Register ▪ Source
▪ Daily Progress Report ▪ Location
▪ Concrete pour Register ▪ Description
▪ Test Record ▪ Depth
▪ Design & Drawing Record ▪ Date Taken
▪ Non conforming item record ▪ Where tested
▪ Cube test record ▪ Remarks/references
TEST LABORATORY MATERIAL RECEIPTS
AND EQUIPMENT MATERIAL TESTING
▪ Intimate the details ▪ Enter receipts
▪ Maintain and calibrate ▪ Approved laboratories
▪ Submit test results
▪ Take test samples
▪ Perform material tests
▪ Submit test reports
TESTING OF WORKS REJECTED MATERIALS
IN PROGRESS
▪ Perform tests ▪ Entries
▪ Submit test reports ▪ Tag and record
▪ Maintain test log ▪ Intimate Quality Control