V.Nishith (17285A0111)
G.Anil kumar (16281A0157)
R.Nikhil (16281A0121)
T.Krishna Teja (16281A0157)
GUIDED BY
Manoj sir
(Assistant professor)
CONTENTS
• INTRODUCTION
• LOCATION OF THE PROJECT
• SPECIFICATIONS
• FIELD STUDY
• SITE CLEARENCE AND EXCAVATION
• CONSTRUCTION PROCEDURE
• EQUIPMENTS USED
• QUALITY CONTROL
INTRODUCTION
A concrete pavement is a rigid pavement structure
which in general consists of three layers; subgrade,
base course and the concrete slab. A concrete
pavement distributes heavy axle loads over a large
area by beam action which means that concrete
pavements are less sensitive to the subgrade support
and do not require the thick sub-base layers like
asphalt concrete pavements.
LOCATION OF THE PROJECT
FORMATION
TOTAL THICKNESS 1
SUB GRADE-0.5M(GRAVEL)
SUB BASE-0.15M
SURFACE COARSE-(1:4:8)-0.1M
WEARING COARSE M40-0.25M
DRAIN WIDTH-1.5 GRADE M15
FIELD STUDY
SITE CLEARENCE AND EXCAVATION
• SURFACE COURSE OF
1:4:8 THICKNESS OF THESE
LAYERS WILL BE DECIDED
MAINLY BASED ON THE
TRAFFIC INTENSITY ON
THE PROPOSED ROAD.
THESE WILL ACT AS
STRENGTH COURSE.
WEARING COURSE(BC):
• EXCAVATOR
• END DUMPERS
• DOZER
• GRADER
• VIBRATORY ROLLER OF CAPACITY 80-100KN
• SURVEY KIT.
EXCAVATOR
VIBRATORY ROLLER
DOZER
GRADER
END DUMPERS
SURVEY KIT
QUALITY CONTROL
• MOISTURE CONTENT SHALL BE CHECKED BEFORE COMPACTION FOR PRECEDING
THE WORK. THE SAME SHOULD BE –2 TO +1 OF OMC.
• THE COMPACTED SURFACE SHALL BE CHECKED FOR FIELD DENSITY AT THE
FREQUENCY OF 1 TEST PER 500SQ.M. 0
• THE DEGREE OF COMPACTION SHALL NOT BE LESS THAN 97%.
• THE SURFACE SHALL BE CHECKED FOR LEVELS AT 5M/10M INTERVALS
LONGITUDINALLY AND TRANSVERSELY AND THE SAME SHALL BE WITHIN +20/-
25MM
• THE GRADATION OF THE MATERIAL SHALL BE CONTROLLED AT CRUSHER BY
MAKING NECESSARY ADJUSTMENTS.