PRESENTATION
ON
TURNKEY CONSTRUCTION
By
PRANAV SHARMA
Mtech (SE)
1921315
TURNKEY PROJECT
Turn-key is defined as initiating and delivering a PROJECT that is ready for
occupation. The turn-key process includes the following steps
Understanding the clients Requirements
Preparation of Concept Drawings
Providing Budgetary Quote
Providing Final Quote with Detailed Scope of work
Contract Signing
Data collection and Obtaining necessary NOC’s
Design and Drawings
Appointment of Consultant for Submission and Supervision
Obtaining Preliminary and Final Approval / Building Permit from relevant Authorities
Site Mobilization
Handling of Variations, if any
Project Execution
Running Bills
Completion, Final Settlement and Handing Over
COMPARISION
CONTRACTOR
SUB
CONTRACTOR
COMPLETION OF COMPLETION OF
PROJECT PROJECT
WORKING OF A TURN KEY PROJECT
1) MEETING THE CLIENT TO UNDERSTAND
CONSTRUCTION REQUIREMENT.
5) FINAL QUOTE
After the submission of the preliminary budgetary quote, based on the client inputs a
final quote is prepared where in the total cost of the project along with the drawings set is
submitted to the client.
Final quote comprises of following documents.
Quote with Detailed Scope of Work.
Architectural drawing comprising of
a) Setting out plans. c) Elevation e) Perspective View
b) Floor Plan d) Section
WORKING OF A TURN KEY PROJECT
6) SIGNING OF CONTRACT
7. SITE MOBILIZATION
Site mobilization means preparing the site for construction which includes
temporary fencing , setting up of construction site with equipment, electricity,
construction trailer, provision for labor accommodation, site office, signage ,installation of
equipment . etc.,
WORKING OF A TURN KEY PROJECT
Before starting of site mobilization developer
has to apply for mobilization NOC attaching
mobilization drawing showing the following .
• Environmental , safety , health ,welfare and
accident prevention plan & site security
management .
• Proposed site access route to the plot
• Site organization layout including plan of the
site temporary arrangement and facilities
• List of plant and equipment to be used for
construction on site.
WORKING OF A TURN KEY PROJECT
8) THE DESIGN PROCESS
After signing of contract the first and foremost duty of the contractor is to
Appoint a consultant
Obtain necessary NOC’S from the authorities.
Preliminary Approval.
Final submission and Building Permit.
Final submission drawings shall include
a) Architectural drawing.
b) Structural drawing.
c) MEP or MEPIT drawings.
d) Fire system drawings
e) other services if any.
Once the final approval is received. Building permit is received. Construction drawings
are prepared . The next process of construction that is site mobilization starts.
WORKING OF A TURN KEY PROJECT
9) EXECUTION AND MONTHLY BILLING.
Execution of construction project involves coordinating people and resources, as well as
integrating and performing the activities of the construction in accordance with the project
management plan,
Monitoring and controlling is an integral part of construction , project execution shall be
done such that potential problems can be identified in a timely manner and corrective action
can be taken, when necessary, to control the execution of the project. The key benefit is that
project performance is observed and measured regularly to identify variances if any .
WORKING OF A TURN KEY PROJECT
In this chart we are explaining the activities involved in
project execution. The shown activities in the chart plays
an important role in the execution of a project . Any
differences or imbalances in the said activities effects the
progress of the project.
Construction project typically involves many
different trades in order to reach completion .A project is
broken out by each scope of work and typically separated
according to the Construction Specifications like General
Conditions, Site work, Utilities, Concrete, Steel, etc.
Once the areas of the scope of work are defined, then a
corresponding value is assigned to each one so that a
percentage complete can be established for each item as
progress is made on the project.
WORKING OF A TURN KEY PROJECT
Based on the progress of work billing is done for the percentage of work done and the
material involved in the same to get the amount of expense occurred and make
comparison to understand the variance with final quote.
10) HANDLING OF VARIATION , IF ANY
Over the course of any construction project, the work scope may change. Change is
a normal and expected part of the construction process. Changes can be the result of
necessary design modifications, differing site conditions, material availability, contractor-
requested changes, value engineering and impacts from third parties, to name a few.
Beyond executing the change in the field, the change normally needs to be documented to
show what was actually constructed. The end product of this effort is what the industry
terms as-built drawings. When changes are introduced to the project, the viability of the
project has to be re-assessed. It is important not to lose sight of the initial goals and targets
of the projects. When the changes accumulate, the forecasted result may not justify the
original proposed investment in the project
WORKING OF A TURN KEY PROJECT
11) FINAL SETTLEMENT AND HANDING
OVER
This is the final process of construction , once the
construction is completed in all respects . Developer
applies for completion certificate to the authorities .
Then the NOC is received from the authorities. The
developer hands over the keys to the client after the final
settlement
ADVANTAGES OF A TURN KEY PROJECT
• One point contact from start to end.
• Flexibility and convenience of having budgetary quote , final quote and detailed scope
of work and drawings which can be compared in the market without any expenses.
•Better control over the project as the design, estimation and execution is all under one
roof.
•Advantages of Pre Engineered Building and precast to the client.
• Economical and speedy construction .