AGENDA
1. Kick-off Objective
2. Project Team Introductions
3. Project Schedule
4. Project Requirements
5. Other matters
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
KICK-OFF OBJECTIVE
PROJECT TEAM
INTRODUCTIONS
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
PROJECT SCHEDULE
PROJECT REQUIREMENTS
1 GENERAL REQUIREMENTS
PROJECT REQUIREMENTS
GENERAL TECHNICAL REQUIREMENTS
B General Considerations
B.7.1. Bidders must submit a list of engineers and technicians who will be working in the
Central Equipment Room (CER).
B.7.2. All engineers and technicians who will be working in the CER shall wear their
company identification cards and shall wear their respective company uniforms.
B.7.3. Bidders must provide security personnel for their equipment inside the building.
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
PROJECT REQUIREMENTS
D. Installation Materials, Cables and Wiring Code
D.4. The Winning Bidder/System Integrator shall submit samples of all the cables
and connectors offered together with their specifications for the Procuring Entity’s
approval before installation.
PROJECT REQUIREMENTS
K. Manuals
PROJECT REQUIREMENTS
L. As-Built Drawings
PROJECT REQUIREMENTS
M. Commissioning and Acceptance Tests
PROJECT REQUIREMENTS
M. Commissioning and Acceptance Tests
M.3. The Winning Bidder/System Integrator shall submit the proposed test procedures and
formats to the Procuring Entity at least four (4) weeks before the commencement of acceptance
tests. The document will be revised and amended as deemed suitable. The test procedures shall
include parameters for full functionality tests for all equipment items and performance tests for
video and audio systems. The test procedures shall include continuous actual day-to-day
operation of the supplied systems and equipment for at least one calendar month period without
any defect. If there is a defect found, this “continuous actual day-to-day operation” part of the test
procedure shall re-start after the defect is amended.
M.4. After the successful completion of the acceptance tests, The Winning Bidder/System
Integrator shall submit two (2) sets of the test results in properly bound volumes to Procuring
Entity.
M.5. After the successful completion of the acceptance tests, the commissioning engineers shall
continue to standby on site for a continuous period of Twelve (12) months.
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
PROJECT REQUIREMENTS
N. Training
N.1. The Winning Bidder/System Integrator shall undertake to provide a comprehensive training for the
Procuring Entity’s staff who will be involved in the operation of the supplied or installed systems and
equipment. The Procuring Entity shall send nominees from PTV-4 Manila to participate in the training.
Accommodation, meals and all unforeseen expenses of the participants are at the account of the
Winning Bidder/System Integrator.
N.2. The training shall cover all the aspects of daily operation, maintenance procedures and
troubleshooting. The training program shall include on-site training on the actual supplied systems and
equipment. The training programs must result efficient day-to-day operation of the supplied systems and
equipment by solely the Procuring Entity’s staff.
N. 3. For major systems and equipment including the MAM System, Automation System, Monitoring &
Control System, etc., experienced engineers or trainers from the respective manufacturers or suppliers
shall be utilized to conduct the training program. Local training assistants, however, are allowed to assist
the resource persons for the conduct of the training program.
N.4. All trainers including training assistants shall be clear and fluent in spoken and written English.
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
PROJECT REQUIREMENTS
N. Training
N.5. The training programs shall be able to start in progressive steps within one calendar month
after the Winning Bidder/System Integrator commences the work. During the first stage of the
training programs, the Winning Bidder/System Integrator shall include simulation operation on
sufficient quantity of training-aid apparatus units which is equivalent to the supplied systems and
equipment. The Winning Bidder/System Integrator shall be solely responsible for the supply of
the training-aid apparatus.
N.6. It is preferable that the training programs take place in Davao where the Winning
Bidder/System Integrator will setup the training rooms, modules, big screen and power point or
sketch up format presentation, the tenderers may include overseas training programs (equipment
which may need factory training (video server & automation system, etc.). The costs for overseas
training shall be included in the Schedules of Prices with detailed breakdowns enabling broad
flexibility.
The Winning Bidder/System Integrator shall inform PTNI on the schedule of training at the
Mindanao Media Hub AT LEAST TWO (2) WEEKS beforehand.
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
PROJECT REQUIREMENTS
P. After Sales Service
Bidders shall submit full details of the five (5) year period of after sales
service inclusive of detailed preventive maintenance procedures for the
proposed systems and equipment which are to be installed. These
details shall consist of each and every maintenance program required.
The details shall include recommended spare parts and spare equipment
with comprehensive itemized price list, license fees if any, etc. The
bidders shall recommend the expected replacement frequency of such
spare part and spare equipment in conjunction with maintenance service
fees and all other fees and produce one comprehensive maintenance
financial plan.
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
PROJECT REQUIREMENTS
1. Restoration of Building After Masonry Works
All masonry works that will, in any way, alter the building
shall be restored to its original state by the Winning
Bidder/System Integrator on its own account.
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
Duly
accomplished
Work / Entry
Permit
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project
OTHER MATTERS
THANK YOU!
KICK-OFF MEETING
Mindanao Media Hub TBOC, Master Control,
Ingest, MAM & Archive System Project