Geothermal
• MakBan Geothermal Power Plant
• Tiwi Geothermal Power Plant
• Tiwi became the world’s first
water-dominated system to
produce more than 160 MW.
• There have now been 156
wells drilled in the Tiwi
contract area
• Flash Type Steam Recovery

Tiwi Geothermal Power


Plant
MakBan Geothermal
Power Plant
• 113 wells have been drilled to measured depths
ranging from 655m to 3,625m to support the
production and injection capacity requirements.
• Average steam and brine flow rates are 14 and 16
kg/s (114 and 128 klbs/hr), respectively.
• Flash/Binary Type Steam Recovery