Lecture Objectives.
By the end of this lecture , YOU should be able to :
Schlumberger Private
List the 3 main DST components
List the 3 main DST pressures
List the 3 main DST types
Describe the DST concept
Schlumberger Private
openhole
or cased wells, are to:
Schlumberger Private
1. The string channels
the flow to surface.
2. The packer is a rubber
element to isolate the
zone to be tested.
3. The valve provides a
method of controlling
the well near the
reservoir.
Ph: Hydrostatic
pressure
Pf: Formation pressure
Schlumberger Private
Pc: Cushion pressure
Generally, the
relationship among
these pressures is:
Ph > Pf > Pc
Schlumberger Private
The Tester valve controls the formation.
- shut the well downhole to minimize
wellbore storage effect
- isolates annular fluid from cushion while
RIH, preventing U-tubing
-provides a seal for pressure test the string
Schlumberger Private
filling up tubing with cushion.
3. Set packer.
Schlumberger Private
tubing).
Schlumberger Private
Intro to WCP and Compass – slide 9
DST Concept
Well location & configuration
Schlumberger Private
Intro to WCP and Compass – slide 10
DST Concept / PACKERS
Schlumberger Private
casing and creates a seal between the
annulus and tubing.
Schlumberger Private
Intro to WCP and Compass – slide 12
DST Concept / Tester Valves
Schlumberger Private
Applications: Onshore and Jack-up rigs
- PCT (Pressure Controlled Tester)
Operated by annulus (and tubing) pressure.
Application: Offshore, floating facilities.
- IRIS dual-valve tool (IRDV)
(IRIS= Intelligent Remote Implementation System)
Operated & Application as PCT
Schlumberger Private
Intro to WCP and Compass – slide 14
Tubing or drillpipe
Slip joints (2 or more)
Drill collars
DST
Redundant circulating valve
Concept
Drill collars Typical DST or TCP tool
Surface Read out
string
RA marker
Drills collar
Schlumberger Private
Surface readout
Downhole valve
Hydrostatic reference tool
Pressure recorders (2 or
more)
Hydraulic jar
Safety joint
Packer
Slotted tailpipe
Debris sub
Tubing
Firing head
Safety spacer
Intro to WCP and Compass – slide 15
Perforating gun
DST Concept
Basic operation:
• During the initial phase of the test, the
wellbore fluids, and, later, the drilling fluid
(mud) that has invaded the formation in the
vicinity of the wellbore flow to surface. This is
Schlumberger Private
known as the cleanup period. Cleanup is
complete when the well effluent at surface is
reservoir fluid that contains no mud particles or
cuttings at surface.
• Once cleanup is complete, the main flow
period can be maintained for the planned
duration, during which downhole pressure
measurements and surface flow rates are
recorded. At the end of the main flow period,
the tester valve is closed. Formation pressure
builds up against the valve while downhole
pressure measurement continues.
Intro to WCP and Compass – slide 16