Professional Documents
Culture Documents
Cat® 6060/6060FS
One single 280 ltr. container is used as the basic version for central greasing system.
Available for machines CAT6018 - CAT6060.
If there is a second 280 ltr. Container mounted, this one is used weather for standby, or for undercarriage greasing.
Available for machines CAT6030 – CAT6060.
2
500ltr. Tank Service Training
3
1000ltr. Tank Service Training
4
How comes the Grease into the Tank??? Service Training
d! !!
n d e
m me
co
o t re
N
5
Tank with one Pump and 2 Line Control Panel Service Training
Level Indicator
Tank
„min“
Grease Tank
Control Panel
Line A
Line B
Grease Filter
From Service Arm
Filter after
Grease Pump
Servo Oil
Filter
Emergency
Grease Nipple
6
Filters Service Training
Breather Filter
7
Level Switches – capacitive digital switches Service Training
-5B15 -5B13
black white
8
Control Panel Service Training
Unloader Valve
2 Line System
-5Y3
On/Off Solenoid
for Grease Pump
2 Line System
-5Y1
Pressure Sensor
2 Line System
-5B6
Servo Oil
Grease Supply
Grease
Grease from Tank
Grease to Distributors
Grease Pump Return
2 Line System
Tank Return Oil/Grease
Lines 1 / 2 9
Control Panel with second pump Service Training
-5Y1
-5Y5 -5Y3 -5Y4
-5B7 -5B6
-5Y2
-5B4
10
Grease Pump Service Training
Active Oil
Pressure on
Grease Pump
Example:
Servo Pressure: 48 bar
11
Greasing System - Break Time Service Training
Grease
Pressure
Grease
Filter
Grease
Pump
Pressure
active
on Pump
-5B6
-5Y3
Unloader Grease
Valve Pressure
Sensor -5Y1
Pump
On /
Changeover Off
Valve Changeover
Solenoid
-5Y2
Line Line
1 2
Servo
Filter
Grease
Fill Line
with Filter
12
Grease System – Break Time Service Training
Initiator Line 2
Additional:
No Grease Pressure
on Sensor -5B6
13
Greasing System - Greasing Line 1 Service Training
Grease
Pressure
Grease
Filter
Grease
Pump
Pressure
-5Y3 active
on Pump
Unloader -5B6
Valve
Grease -5Y1
Pressure Pump
Sensor On /
Off
Changeover
Valve Changeover
Solenoid
-5Y2
Line Line
1 2
Servo
Filter
Grease
Fill Line
with Filter
14
Service Training
Lube Cycle Line 1
Distributors
Change Over
Valve
Line 1 (B)
Sensor -5B6
Hydraulic
Solenoid
-5Y2 - Change
Auxiliary
Over Solenoid
BCS
Grease
Container
15
Lube Cycle Line 1 Service Training
Additional:
16
Grease System – Line 1 Service Training
Initiator Line 2
Additional:
Line 1
17
Greasing System - Greasing Line 2 Service Training
Grease
Pressure
Grease
Filter
Grease
Pump
Pressure
active
-5Y3 on Pump
Unloader -5B6
Valve
Grease -5Y1
Pressure Pump
Sensor On /
Off
Changeover
Valve
Changeover
Solenoid
-5Y2
Line Line
1 2
Servo
Filter
Grease
Fill Line
with Filter
18
Service Training
Lube cycle line 2
Distributors
Change Over
Line 1 (B)
vented to Tank Valve
Initiator 2
Line 2 (A)
50 bar Servo
Pressure
Sensor -5B6
Hydraulic
-5Y1 - ON/OFF
Lube Pump
Solenoid
-5Y2 - Change
Auxiliary
Over Solenoid
BCS
Grease
Container
19
Lube Cycle Line 2 Service Training
Additional:
20
Grease System – Line 2 Service Training
Initiator Line 2
Additional:
Line 1
Line 2
21
Greasing System - Break Time Service Training
Grease
Pressure
Grease
Filter
Grease
Pump
Pressure
active
on Pump
-5B6
-5Y3
Unloader Grease
Valve Pressure
Sensor -5Y1
Pump
On /
Changeover Off
Valve Changeover
Solenoid
-5Y2
Line Line
1 2
Servo
Filter
Grease
Fill Line
with Filter
22
Time Adjustment and Grease Cycles Service Training
If the operator starts the excavator and uses any attachment function, the greasing system also starts to lubricate the
machine.
At first line 1, then line 2 is lubricated:
Line 1:
The system is waiting for the indication of a fully lubricated line 1:
Feedback from the “line 1 initiator” (-5B2) on the stick.
250 bar pressure signal from the “grease pressure sensor” (-5B6).
Both conditions must be fulfilled before the system stops the lube pump for 4 sec. to allow the pump pressure to decrease.
Then the system switches over from line 1 to line 2, ready to grease line 2.
Line 2:
Then the system is waiting for the indication of a fully lubricated line 2:
Feedback from the “line 2 initiator” (-5B3) on the stick.
250 bar pressure signal from the “grease pressure sensor” (-5B6).
Both conditions must be fulfilled before the system stops the lube pump.
The system switches over from line 2 to line 1. => System is ready to grease line 1 again.
Greasing Time:
Time which is necessary to grease both lines.
This time can only be affected by: Temperature, Grease Pump Speed, Grease Type, Amount of Distributers.
Break Time: (Remaining time until the next lube cycle starts)
Remaining time is the result of Lubrication Time minus Greasing Time.
23
Grease System – Easy to expand with an additional
Distributor Service Training
Single Dosing
Initiator Line 1
Initiator Line 2
Double Dosing
24
Grease Distributor Service Training
2 1
Directional Spool
Plugs
Pumping Piston
25
Grease Distributors - Single Greasing - Line 1 Service Training
2 1
26
Grease Distributors - Single Greasing - Line 2 Service Training
2 1
27
Grease Distributors – Double Greasing - Line 1 Service Training
Valvula Giratoria
2 1
28
Grease Distributors – Double Greasing - Line 2 Service Training
2 1
29
Grease Distributors Service Training
Double Single
Amount Amount
Double Single
Amount Amount
30
Grease Distributors Service Training
Counter Nut
Valve Inlet
31
Grease Distributors Service Training
VSL 2 - Distributor
s
oni
ns
te
Ex
32
VSG 8 Distributor with only 2 Outlets Service Training
e
Valv
k
ec
Ch
n
ctio
e
o nn
h tC
ig
t ra
S
33
What is shown? …. VSL or VSG??? Service Training
34
Distributors Service Training
35
Distributors Service Training
36
Distributors Service Training
37
Distributors and Adjustment Screws Service Training
VSG 8 - Distributor
38
Information Screen Service Training
Start Page
39
Settings Screen Service Training
Start Page
Click on “Settings”
40
Example: Distributors A-Frame Service Training
41
Example: Distributors Swing Bearing / Greasing Pinion Service Training
42
Example: Distributors Boom (FS) Service Training
43
Example: Distributors on Stick Rear Wall (FS) Service Training
Standard
Version
Initiators
Extended
Version
44
Auxiliary Controller Service Training
I/O module
CPU module
45
System Monitoring Service Training
Auxiliary Controller
47
Superstructure Greasing System: Reset Function Service Training
Test Cycles
The conditions of greasing (superstructure and undercarriage) in the normal and in the test mode:
As well in the normal mode as in the test mode the following conditions must be given:
One separate cycle is started and operated by pressing the re-set button for 2 sec.
The test mode is initiated by pressing five times within 5 sec the re-set button. 3 complete grease cycles are run.
The test mode can be stopped by pressing the re-set button for 1 sec during the test mode. The current cycle, however, is finished.
(The number of the cycles to be run during the test mode is pre-set in the Auxiliary controller.)
48
Superstructure Greasing System: Fault Messages Service Training
Fault messages can only be deleted by pressing the reset button (1 sec).
The fault message is suppressed 3 min after starting the engine (i.e. during the first greasing) in order to prevent possible faults
(e.g. a longer greasing because of cold oil or grease)!
After a fault message persisting during 15 min in the superstructure the bucket switches off.
BCS fault messages (without grease pump being switched off) superstructure:
49
More Information? Service Training
Hey Fellows,
50