Introduction
 I’m working as a quality inspector in Terminal
Technologies .
 I have to inspect all child part (inserts) and have to

approve if it ok, Otherwise as per drawing not match


dimension so reject that mart.
 Till now I use for instrument are

1 Digital vernier caliper.


2 Digital micrometer.
3 Vision measuring machine(VMM).
4 Automatic Vision measuring machine(PVMM)
5 Coordinte measuring machine (CMM).
COMPANY PROFILE
 TT is established in 1993, TT is entering the 25th year of providing
interconnection solutions for the Auto, Appliance, Electrical,
Electronics and connected world.

 Billion connections executed every year, TT is in a position to offer a


single stop solution for intricate and complicated connection systems
for the space starved and cost competitive industry.

 With design, tool/mold execution, production centers and full-


fledged testing facilities, TT can execute a range of catalogue parts
and custom-built solutions with ease in a very tight development
cycle.

 TT works with OEMs and Tier 1 manufacturers to convert ideas to


part deployment with cost competitiveness and Short timelines.
Quality Control
This process includes setting standards such as
specifications, measurement deviations, taking action to
fix / minimize the adverse variances and to improve the
standard itself.
Examination quality contractor should be able to
understand the conditions of quality as desired.
There are sum steps done towards quality control as
 INPUTS

Quality management plan.


Quality metrics, quality checklist.
Organizational process asset.
Work performance information.
Approved change request.

 TOOLS & TECHNIQUES.


 Cause and effect diagram.
 Control charts, flowcharting.
 Histogram, paretochart.
 Run chart, scatter diagram.
 Statistical sampling.
 Inspection, defect repair.
 OUTPUTS.
Quality control measurements.
Validated defect repair.
Quality baseline.
Recommendation corrective action.
Recommended preventive action.
Requested changes.
Recommended defect repair.
Pass the material to tool room department .
Final report.