PACKING PLANT

PROPOSED NEW MODIFICATIONS


2020-2021
PRESENT WAGON LOADING CIRCUIT OVERVIEW

P-8 P-6 P-5 P-4 P-3 P-2 P-1

BC 66

2-MAIN BELT

1-MAIN BELT
BC 67

3-MAIN BELT
4-MAIN BELT
BC 73

8-MAIN BELT

6-MAIN BELT
BC 72

5-MAIN BELT
- DISCHARGE PROVISION

4-MAIN BELT
OF MAIN BELTS

3-MAIN BELT
BC 94

BC 96 BC 95 A BC 93 A BC 93

BC 95
WAGON
WAGON WAGON WAGON
LOADER 7&8
LOADER 5&6 LOADER 3&4 LOADER 1&2
TOWARDS ENERGY SAVING,ZERO DEMMURAGE CHARGE etc..
- DISCHARGE PROVISION OF MAIN BELT - DISCHARGE PROVISION OF PROPOSED NEW BELT

PROPOSED P-8 P-6 P-5 P-4 P-3 P-2 P-1


OVERVIEW
BC 66

2-MAIN BELT

1-MAIN BELT
BC 67

NBC-1 NBC-2
BC 73

8-MAIN BELT
BC 72

NOTE:
6-MAIN BELT

5-MAIN BELT

4-MAIN BELT
NBC –PROPSED NEW BELT

3-MAIN BELT
CONVEYOR

BC 94
NB
CBC
-3 96 BC 95 A BC 93 A BC 93
NBC-4
BC 95
WAGON WAGON
WAGON WAGON WAGON
LOADER 8 LOADER 7
LOADER 5&6 LOADER 3&4 LOADER 1&2
KAIZEN-3 –NBC-3

**INSTALLATION OF NEW SMALL BELT CONVEYOR FROM BC 72 TO BC 96 BELT CONVEYOR.

NBC -3:
P-8 P-6
 NBC -3 IS A NEW BELT

8 MAIN BELT

6 MAIN BELT
CONVEYOR FROM BC 72
BC 67 CONNECTING BC 96
BC 72

BENEFITS :

IF 6TH PACKER MAIN BELT IS DUE


FOR MAINTENANCE WE CAN USE
BC 96 PACKER 8 FOR WAGON LOADING
AS NBC -3 CONNECTING BC 96.
BC 95
NBC – 3

WAGON LOADERS
7&8
PROPOSED OPEN WAGON LOADING CIRCUIT
P-8 P-6 P-5 P-4 P-3 P-2

BC 66

3-MAIN BELT

2-MAIN BELT
BC 73

4-MAIN BELT
BC 67
6-MAIN BELT

5-MAIN BELT
OPEN WAGON
LOADING CHUTES
RAILWAY TRACK LINE-2
BC 72

RAILWAY TRACK LINE-3

*HENCE TOTALLY 6 PACKERS CAN BE USED FOR OPEN WAGON LOADING.


*LOADING CAN BE COMPLETED IN THE GIVEN TIME. (WITHOUT DC)