Creek div KPP MASS
Januari 2020
Usulan Design – www.themegallery.com
SEGMENT 1
Lokasi Sliding
COMPANY LOGO
Usulan Design – www.themegallery.com
SEGMENT 1
Usulan b c
Re design d
COMPANY LOGO
Cross Section www.themegallery.com
Redesign segment 1
Eom_1911
a Topo Sesudah a’
longsor (drone)
Re Design
(cut material longsor)
Design Awal
b b’
Eom_1911
Re Design
(cut material longsor)
Design Awal
COMPANY LOGO
Cross Section www.themegallery.com
Redesign
c Eom_1911 c’
Re Design
(cut material longsor)
Design Awal
d d’
Eom_1911
Re Design
(cut material longsor)
Design Awal
COMPANY LOGO
Geolistrik Segment 1 www.themegallery.com
COMPANY LOGO
Geolistrik Segment 1 www.themegallery.com
LINE GEOLISTRIK 1A
60
40
Elevation (m)
20
dense
0
LINE GEOLISTRIK 1B
40
Elevation (m)
20
0
0 50 100 150 200 250 300
Distances (m) LINE GEOLISTRIK 1D
LINE GEOLISTRIK 1C
60
60
Elevation (m)
Elevation (m)
40
40
20
20
0 20 40 60 80 100 120 140 160 0 20 40 60 80 100 120 140 160
Distances (m) Distances (m)
Segment 1:
- Terdapat 3 line tambahan di segment 1
- Di ke 3 line tambahan (1b,1c,1d) didapatkan nilai resistivity yang relatif sedang (>10 ohm.m) kecuali di line 1b,
terdapat dense material yang terdapat di permukaan.
COMPANY LOGO
Usulan Design – www.themegallery.com
SEGMENT 3
Setelah dilakukan
excavation terdapat
material lumpur padat dan
terjadi sliding di lokasi
front
COMPANY LOGO
Usulan Design – www.themegallery.com
SEGMENT 3
Fill 36.000
COMPANY LOGO
Cross Section www.themegallery.com
Redesign – Segment 3
1 1’
Eom_1911
Re Design
Design Awal
2 2’
Eom_1911
Re Design
Design Awal
COMPANY LOGO
Cross Section www.themegallery.com
Redesign – Segment 3
3 3’
Eom_1911
Re Design
Design Awal
4 4’
Eom_1911
Design Awal
Re Design
COMPANY LOGO
Geolistrik Segment 3 www.themegallery.com
Line Geolistrik 3a
40
Elevation (m)
20
0
0 50 100 150 200 250 300 350 400 450
Distances (m)
LINE GEOLISTRIK 3B
30
Elevation (m)
20
10
0
0 20 40 60 80 100 120 140 160
Distances (m)
LINE GEOLISTRIK 3C
40
Elevation (m)
20
LINE GEOLISTRIK 3F
40
Elevation (m)
30 20
Elevation (m)
20
0
10
0 Distances (m)
0 20 40 60 80 100 120 140 160
LINE GEOLISTRIK 3E
Distances (m)
Note : 30
Dari hasil geolistrik dapat disimpulkan bahwa zona material yang diduga
Elevation (m)
Jenuh ada pada elevasi < 20 m, sedangkan base atau floor design creek 20
Distances (m)
COMPANY LOGO
Kesimpulan www.themegallery.com
Volume (BCM)
No Design
Cut Fill
1 Re- design Seg 1 63,000 -
2 Akses Redesign Seg 1 10,000 -
3 Re- design Segmen 3 37,500 36,000
Total Volume 110,500 36,000