SEGMENT 1

Terjadi sliding di Creek segment 1 barat

Lokasi Sliding

COMPANY LOGO
Usulan Design – www.themegallery.com

SEGMENT 1

Usulan b c
Re design d

Dimensi Area Redesign :


a’ Panjang : 400 m
Design
Sebelum longsor Slope : 30 derajat
Tinggi Bench : 7 m
b’
lebar Bench : 5 m
c’ Vol. Cut : 62.9k BCM
d’

: Design sebelum longsor

: Usulan Re- design

COMPANY LOGO
Cross Section www.themegallery.com
Redesign segment 1
Eom_1911
a Topo Sesudah a’
longsor (drone)

Re Design
(cut material longsor)
Design Awal

b b’
Eom_1911

Re Design
(cut material longsor)
Design Awal

COMPANY LOGO
Cross Section www.themegallery.com
Redesign

c Eom_1911 c’

Re Design
(cut material longsor)

Design Awal

d d’
Eom_1911

Re Design
(cut material longsor)

Design Awal

COMPANY LOGO
Geolistrik Segment 1 www.themegallery.com

COMPANY LOGO
Geolistrik Segment 1 www.themegallery.com

LINE GEOLISTRIK 1A
60

40
Elevation (m)

20
dense
0

0 80 160 240 320 400 480 560


Distance (m)

LINE GEOLISTRIK 1B
40
Elevation (m)

20

0
0 50 100 150 200 250 300
Distances (m) LINE GEOLISTRIK 1D
LINE GEOLISTRIK 1C
60
60

Elevation (m)
Elevation (m)

40
40

20
20
0 20 40 60 80 100 120 140 160 0 20 40 60 80 100 120 140 160
Distances (m) Distances (m)

Segment 1:
- Terdapat 3 line tambahan di segment 1
- Di ke 3 line tambahan (1b,1c,1d) didapatkan nilai resistivity yang relatif sedang (>10 ohm.m) kecuali di line 1b,
terdapat dense material yang terdapat di permukaan.

COMPANY LOGO
Usulan Design – www.themegallery.com
SEGMENT 3

Setelah dilakukan
excavation terdapat
material lumpur padat dan
terjadi sliding di lokasi
front

COMPANY LOGO
Usulan Design – www.themegallery.com
SEGMENT 3

Fill 36.000

Dimensi Area Redesign :


: Design sebelum longsor (vol : 95.500) Panjang : 465 m
Slope : 45 derajat
: Usulan Re- design (vol : 133.000) Tinggi Bench : 7 m
lebar Bench : 5 m

COMPANY LOGO
Cross Section www.themegallery.com
Redesign – Segment 3

1 1’

Eom_1911

Re Design
Design Awal

2 2’
Eom_1911

Re Design
Design Awal

COMPANY LOGO
Cross Section www.themegallery.com
Redesign – Segment 3
3 3’
Eom_1911

Re Design
Design Awal

4 4’
Eom_1911

Design Awal
Re Design

COMPANY LOGO
Geolistrik Segment 3 www.themegallery.com

Line Geolistrik 3a
40

Elevation (m)
20

0
0 50 100 150 200 250 300 350 400 450
Distances (m)

LINE GEOLISTRIK 3B

30

Elevation (m)
20

10

0
0 20 40 60 80 100 120 140 160

Distances (m)

LINE GEOLISTRIK 3C
40

Elevation (m)
20

0 20 40 60 80 100 120 140 160


Distances (m)
LINE GEOLISTRIK 3D
40

LINE GEOLISTRIK 3F
40

Elevation (m)
30 20
Elevation (m)

20

0
10

0 20 40 60 80 100 120 140 160

0 Distances (m)
0 20 40 60 80 100 120 140 160
LINE GEOLISTRIK 3E
Distances (m)
Note : 30

Dari hasil geolistrik dapat disimpulkan bahwa zona material yang diduga
Elevation (m)

Jenuh ada pada elevasi < 20 m, sedangkan base atau floor design creek 20

Ada pada elevasi 23 – 24 m. Artinya, design tidak memotong zona saturated 10

Atau material jenuh. 0


0 20 40 60 80 100 120 140 160

Distances (m)

COMPANY LOGO
Kesimpulan www.themegallery.com

SUMMARY PENAMBAHAN VOLUME

Volume (BCM)
No Design
Cut Fill
1 Re- design Seg 1 63,000 -
2 Akses Redesign Seg 1 10,000 -
3 Re- design Segmen 3 37,500 36,000
Total Volume 110,500 36,000