Overview
• Introduction
• Formwork – definition and discussions
• Components and assembly of MIVAN formwork

7/13/20
• Construction with MIVAN
• Work cycle
• Quality enhancements
• Merits and demerits
• Remedies proposed
• Conclusion and Inference
• Bibliography
2
Introduction
• Concept of ALUMINIUM FORMWORK

7/13/20
• Developed by MIVAN GROUPS, MALAYSIA

• Driving force –speed of construction, quality of construction, seismic


resistivity, economy

• Good quality construction should not deter the project speed nor should
it be uneconomical

“Cost is long forgotten, but the quality is


3
remembered forever”
Innovation in Construction Technology
• Traditional mode of construction - inadequate for mass housing
construction.

7/13/20
• Prone to poor quality control

• Mass housing works – technologies for fast construction to deliver


quality, economic and durable structure.

• Pre-cast and cast-in-situ techniques are used for quick


construction.

• Use of Aluminum alloy for formwork 4


What is a Formwork?

• Support for plastic concrete when placed, till it gains half of its
design strength .

7/13/20
• Temporary supports and castings

Forms or moulds or shutters are the receptacles in which


concrete is placed, so that it will have desired shape or outline
when hardened. Once concrete develops the adequate strength to
support its own weight they can be taken out. - ACC

5
Formwork - Requirements
• Sufficiently strong enough

• The joints should be rigid

7/13/20
• Construction lines in the formwork should be true

• Easily removable without damage to itself

6
Load Acting On Formwork
• Self weight, Wet concrete weight, Live load, Impact of
concrete pour, vibrations.

7/13/20
• Load in bending and shear for frame and joist-370kg/m2.

• Should not deflect more than 0.25 cm.

7
MIVAN System
• 3S - SYSTEM OF CONSTRUCTION - Speed, Strength, Safety

• Column and beam construction – eliminated

7/13/20
• Walls and slabs are cast in one operation

• Specially designed, easy to handle light weight pre-engineered aluminium


forms.

• Rapid construction of multiple units of repetitive type using semi-skilled


labours.

• Fitting and erecting the portion of shuttering


8

• Carrying out concreting of the walls and slabs together.


MIVAN Formwork
• Aluminum alloy panels

• Excellent stiffness-to-weight ratio

7/13/20
• Face or contact surface - 4mm thick plate

• Ribbons 6 mm thick.

• Pin and wedge arrangement system

• Requires no bracing

• High strength wall ties


9
• Small panels – no heavy equipment
MIVAN FORMWORK
• Heavy lifting eliminated
• Semi skilled labors

7/13/20
• Fast construction suitable for large magnitudes
• Good quality with accurate dimensions
• System components are durable – repetitive

• Monolithic construction

Mivan – 4day cycle


Conventional – 14 to 20 day cycle
10
• Plastering eliminated completely
Comparison – Mivan and
Conventional
• More seismic resistance

7/13/20
• Increased durability
• Lesser number of joints – reduced leakages
• Higher carpet area
• Smooth finishing of wall and slab
• Uniform quality of construction
• Negligible maintenance
• Faster completion, conventional stage-to-stage concreting , schedule for 11

masonry , plastering and finishing.


Construction with MIVAN
• PRE – CONCRETE ACTIVITIES

• Receipt of equipment on site

7/13/20
• Level surveys
• Setting out of formwork
• Control / correction of deviation
• Erect formwork – vertical
• Erect deck formwork 12

• Setting kickers
Checks before Concreting
• Formwork should be cleaned and coated
• Wall formwork erected to the setting out lines

7/13/20
• Openings are of correct dimensions
• Horizontal formwork are in level
• Deck and beam props are vertical

• Wall ties, pins and wedges are all in position


• Surplus material are cleared
13
On Concrete Activities
• Checking pins, wedges and wall ties

• Beam / deck props adjacent to drop areas slipping due to

7/13/20
vibration
• Bracing at special areas slipping due to vibration

• Overspill of concrete at window opening

14
Post – Concrete Activities
• Strike down wall form

• Strike deck form

7/13/20
• Clean, transport and stack formwork

• Strike down kicker formwork


• Strike wall – mounted working platform

• All formwork can be struck after 12 hours

15
Software Application For Formwork
• Designed using most optimal panel size , by the use of state-
of-art design software.

7/13/20
• Incorporates optimum assembly procedure ,economical panel
selection ,hence minimizing capital and operational cost.

• Flexible in design and can take any architectural and structural


form such as bay window, staircase etc.

16
Beam components
Beam Side Panel

7/13/20
Prop Head

Beam Soffit Bulkhead 17


Beam Soffit Panel
Deck Components

Prop

7/13/20
Length Deck
Panel
Deck Mid –Beam

Soffit Length

18
Deck Prop
Other Components

7/13/20
External
Corner

Internal Soffit Corner

Internal Corner

19

External Soffit Corner


Wall Components
Wall Panel

7/13/20
Rocker

Kicker
20
Pin and Wedge System

• Pin

7/13/20
• Stub
21
Formwork Assembly

7/13/20
22
23

7/13/20
7/13/20
24
7/13/20
25
7/13/20
26
7/13/20
27
Work Cycle
• System for scheduling & controlling the work of other connected
construction trades

7/13/20
• Deshuttering of the panels – 12 to 15 hrs

• Positioning brackets & platforms on the level- 10 to 15 hrs

• Deshuttered panels lifted & fixed on floor-7 to 10 hrs

• Kicker & external shutters fixed in 7 hrs

• Shutters are erected in 6-8 hrs

• Reinforcement and – 10 to 12 hrs


28
• Electrical fittings -10 hrs

• Pouring concrete
4 Day Cycle
• Day 1: erection of vertical reinforcement bars and one side of the
vertical formwork

7/13/20
• Day 2: erection of the second side of the vertical formwork and
formwork for the slab
• Day 3: fixing reinforcement bars for slabs and casting of walls and
slabs
• Day 4: removal of vertical form work panels after 24hours, props in
place for 7 days, floor slab formwork in place for 2.5 days
29
Design Aspect Of Mivan:

• Conventional RC beam column-In case of lateral load more


reinforcement required. Column 20 % strong than beam it

7/13/20
support (requirement)

• In RC load bearing wall and slab- structure become monolithic


box type –suitable for resisting horizontal load.(shear wall).

30
Quality Enhancements
• High quality formwork panels - consistency of dimensions

• Level and verticality

7/13/20
• Plastering eliminated

• 3mm to 4mm skin coat enough for pleasant appearance

• 6mm coat for flooring.

31
Merits
• Total system forms the complete concrete structure
• Custom designed to suit project requirements

7/13/20
Unsurpassed construction speed
• High quality finish
• Cost effective
• Panels can be reused up to 250 times
• Erected using unskilled labour
• Quality and speed - given due consideration along with
economy
• Low maintenance due to monolithic structure , hence very
cost effective in long run
32
Limitations
• Because of small sizes - finishing lines are seen
• Concealed services become difficult
• Requires uniform planning and uniform elevations to be cost

7/13/20
effective
• Modifications are not possible
• Large volume of work is necessary to be cost effective
• Spacers, wall ties - seepage, leakages during monsoon
• Shrinkage cracks
• High heat of hydration – shear walls

33
Remedial Measures
• Wall ties - create holes in wall after deshuttering

• Box-type construction - shrinkage cracks, near door and

7/13/20
window openings in the walls

• Minimize these cracks by providing control strips in the


structure which could be concreted after a delay of about 3 to
7 days after major concreting

• The problem of cracking can be avoided by minimizing the


heat of hydration by using Flyash
34
Conclusion and Inference
• Civil engineers not only build but also enhance the quality of life
• Creativity and technical skill help to plan, design, construct and
operate the facilities essential to life

7/13/20
• MIVAN - cost effective and efficient tool to solve problems of the
mega housing project
• MIVAN construction is able to provide high quality construction at
unbelievable speed and at reasonable cost
• Effective technology – India
“Cost is long forgotten, but the quality is
remembered forever”
35
Bibliography

• http://en.wikipedia.org/wiki/Formwork

7/13/20
• http://www.reliancescaffolding.com/Wall-Form-works/form-work.a
sp
• www.mivan.com
• www.mivantelecomms.com/news/?id=42&q

36
7/13/20
Thank You