Mivan Formwork: Presented By, Sagar D Shah Nirma University
Mivan Formwork: Presented By, Sagar D Shah Nirma University
Presented by,
Sagar D Shah
Nirma University
7/13/20 1
Overview
• Introduction
• Formwork – definition and discussions
• Components and assembly of MIVAN formwork
7/13/20
• Construction with MIVAN
• Work cycle
• Quality enhancements
• Merits and demerits
• Remedies proposed
• Conclusion and Inference
• Bibliography
2
Introduction
• Concept of ALUMINIUM FORMWORK
7/13/20
• Developed by MIVAN GROUPS, MALAYSIA
• Good quality construction should not deter the project speed nor should
it be uneconomical
7/13/20
• Prone to poor quality control
• Support for plastic concrete when placed, till it gains half of its
design strength .
7/13/20
• Temporary supports and castings
5
Formwork - Requirements
• Sufficiently strong enough
7/13/20
• Construction lines in the formwork should be true
6
Load Acting On Formwork
• Self weight, Wet concrete weight, Live load, Impact of
concrete pour, vibrations.
7/13/20
• Load in bending and shear for frame and joist-370kg/m2.
7
MIVAN System
• 3S - SYSTEM OF CONSTRUCTION - Speed, Strength, Safety
7/13/20
• Walls and slabs are cast in one operation
7/13/20
• Face or contact surface - 4mm thick plate
• Ribbons 6 mm thick.
• Requires no bracing
7/13/20
• Fast construction suitable for large magnitudes
• Good quality with accurate dimensions
• System components are durable – repetitive
• Monolithic construction
7/13/20
• Increased durability
• Lesser number of joints – reduced leakages
• Higher carpet area
• Smooth finishing of wall and slab
• Uniform quality of construction
• Negligible maintenance
• Faster completion, conventional stage-to-stage concreting , schedule for 11
7/13/20
• Level surveys
• Setting out of formwork
• Control / correction of deviation
• Erect formwork – vertical
• Erect deck formwork 12
• Setting kickers
Checks before Concreting
• Formwork should be cleaned and coated
• Wall formwork erected to the setting out lines
7/13/20
• Openings are of correct dimensions
• Horizontal formwork are in level
• Deck and beam props are vertical
7/13/20
vibration
• Bracing at special areas slipping due to vibration
14
Post – Concrete Activities
• Strike down wall form
7/13/20
• Clean, transport and stack formwork
15
Software Application For Formwork
• Designed using most optimal panel size , by the use of state-
of-art design software.
7/13/20
• Incorporates optimum assembly procedure ,economical panel
selection ,hence minimizing capital and operational cost.
16
Beam components
Beam Side Panel
7/13/20
Prop Head
Prop
7/13/20
Length Deck
Panel
Deck Mid –Beam
Soffit Length
18
Deck Prop
Other Components
7/13/20
External
Corner
Internal Corner
19
7/13/20
Rocker
Kicker
20
Pin and Wedge System
• Pin
7/13/20
• Stub
21
Formwork Assembly
7/13/20
22
23
7/13/20
7/13/20
24
7/13/20
25
7/13/20
26
7/13/20
27
Work Cycle
• System for scheduling & controlling the work of other connected
construction trades
7/13/20
• Deshuttering of the panels – 12 to 15 hrs
• Pouring concrete
4 Day Cycle
• Day 1: erection of vertical reinforcement bars and one side of the
vertical formwork
7/13/20
• Day 2: erection of the second side of the vertical formwork and
formwork for the slab
• Day 3: fixing reinforcement bars for slabs and casting of walls and
slabs
• Day 4: removal of vertical form work panels after 24hours, props in
place for 7 days, floor slab formwork in place for 2.5 days
29
Design Aspect Of Mivan:
7/13/20
support (requirement)
30
Quality Enhancements
• High quality formwork panels - consistency of dimensions
7/13/20
• Plastering eliminated
31
Merits
• Total system forms the complete concrete structure
• Custom designed to suit project requirements
•
7/13/20
Unsurpassed construction speed
• High quality finish
• Cost effective
• Panels can be reused up to 250 times
• Erected using unskilled labour
• Quality and speed - given due consideration along with
economy
• Low maintenance due to monolithic structure , hence very
cost effective in long run
32
Limitations
• Because of small sizes - finishing lines are seen
• Concealed services become difficult
• Requires uniform planning and uniform elevations to be cost
7/13/20
effective
• Modifications are not possible
• Large volume of work is necessary to be cost effective
• Spacers, wall ties - seepage, leakages during monsoon
• Shrinkage cracks
• High heat of hydration – shear walls
33
Remedial Measures
• Wall ties - create holes in wall after deshuttering
7/13/20
window openings in the walls
7/13/20
• MIVAN - cost effective and efficient tool to solve problems of the
mega housing project
• MIVAN construction is able to provide high quality construction at
unbelievable speed and at reasonable cost
• Effective technology – India
“Cost is long forgotten, but the quality is
remembered forever”
35
Bibliography
• http://en.wikipedia.org/wiki/Formwork
7/13/20
• http://www.reliancescaffolding.com/Wall-Form-works/form-work.a
sp
• www.mivan.com
• www.mivantelecomms.com/news/?id=42&q
36
7/13/20
Thank You