Professional Documents
Culture Documents
EXE
Benjamin C. Abordo
AVP for Procurement ,
Construction Business Unit (CBU-CLG)
Raemulan Land Inc.
41st Flr Joy Nostalg Centre #17 ADB Ave
Ortigas Centre, Pasig City
Tel. 570-8888 loc 107
MB: 0998 -960 2195
0917-3221495
Indeed, “God moves in mysterious
ways His wonders to perform”.”
2. The contractor must register their company ‘s general information on our contractor’s on-line pre-qualification
platform
6. •Upon
Every adversity
review of the technical plans;billbrings with
of quantities and it the
award cost, the seed
contractor
must advise RLI ACRED- GROUP within 3 days. if all the terms and condition is acceptable .
• of an equivalent advantage.
7. If, the contractor is certain in joining Raemulan Lands Inc.(RLI) with its current and forthcoming
projects. The contractor need’s to submit a Letter of Intent (LOI) and all pre- qualification
requirements.
8. •Upon
Every failure
receipt of the contractor's brings
LOI, RLI-ACREDwith
GROUPit willthe
scheduleseed ofof
an inspection
contractor’s business office and either of the two(2) whether the on-going or completed projects
• an equivalent success.
9. After the inspection RLI-ACRED GROUP will make a recommendation report to the Head of
procurement committee to proceed or not for the face to face interview based on its evaluation .
The Contractor must submit the following :
A. LETTER OF INTENT (LOI) –The letter of intent should indicate B. Contractors to comply and submit the necessary pre
the project name ; accepted cost and number of house units
• Every adversity brings with it the seed
intended to construct.
qualification documents to complete the accreditation process
• of an equivalent advantage.
2. Once the contractor passed the interview and was officially accredited , The Bids and Awards
Group will process the MFA ( memorandum for approval ) -this is a request for budget approval
• Every failure brings with it the seed of
based on the agreed cost and no of awarded house units to the contractor.
3. •1. an
After equivalent
MFA approval , Bids and Awards success.
Group will issue the Notice to Proceed (NTP)
(note: Contractor to visit the project site for proper CMG orientation on site conditions;
barracks location ; electric and water tapping location; barangay permits and early kick off
schedule)
4. Once NTP is received the contractor can start processing the BOND’S required. ( see list below)
• 1. SURETY
• 2. CARI
• 3. GUARANTEE
BOND APPLICATION
• ( ) Duly Accomplished bond form, accompanied by the two (2) sets of co-signors statements;
• ( ) Articles of Incorporation;
• ( ) SEC Registration;
•
•
•
• Every adversity brings with it the seed
( )
( )
( )
Business Permit / Mayors Permit;
Income Tax Return (latest 2 year period / comparative statement);
Audited Financial Statements (Latest 2 year period / comparative statement);
• of an equivalent advantage.
• ( ) Secretary’s Certificate / Board Resolution authorizing Corporate Bond Signatory/ies;
• ( ) Track Records (List of Previous and On-going Projects undertaken stating therein Project Description, i.e: Nature of Project, Owner,
Amount of Contract, and % of Completion and/ or Accomplishment);
• ( ) List of Clients;
• ( ) List of Construction Equipment and Vehicles;
• ( ) Company Profile (if available);
• ( ) Copy of the Contract / Agreement / Notice of Award / Notice to Proceed / Purchase Order; Other related Contract or Agreement;
•
•
•
• an equivalent success.
( )
( )
Duly Accomplished bond form, accompanied by the two (2) sets of co-signors statements;
DTI Registration;
• ( ) Business Permit / Mayors Permit;
• ( ) Income Tax Return (latest 2 year period / comparative statement);
• ( ) Audited Financial Statements / Statement of Assets and Liabilities ( Latest 2 year period/ comparative statement);
• ( ) Track Records (List of Previous and On-going Projects undertaken stating therein Project Description, i.e: Nature of Project, Owner, Amount of
Contract, and % of Completion and/ or Accomplishment);
• ( ) List of Clients;
• ( ) List of Construction Equipment and Vehicles;
• ( ) Company Profile (if available);
• ( ) Copy of the Contract / Agreement / Notice of Award / Notice to Proceed / Purchase Order; Other related Contract or Agreement;
• ( ) Copy of the Certificate of Completion and Acceptance;
• ( ) Collateral (if necessary)
CONTRACTOR AWARD COST
1. Rebar
2. Cement
3. Load Bearing CHB
• Every adversity brings with it the seed
4. Roofing Framing
5. Roofing Sheets & Bended Accessories
• of an equivalent advantage.
6. Loft Framing
7. Ficem Board 16mm x 4’ x 8’
8. PVC Pipes and Fittings for Electrical
Works Roughing-ins and TW Wires
• Every failure brings with it the seed of
9. PVC Pipes and Fittings for Waterline &
Sewer line Works Roughing-ins
• an equivalent success.
10. Plumbing Fixtures & Fittings
11. PE Foam Insulation
12. Doors and Jambs
13. Ceramic Tiles
14. Aluminium Jalousie Windows
15. Lockset
16. Ready Mix Concrete (RMC) for Slab on
Grade ( SOG)
LIST OF OWNER SUPPLIED MATERIALS (OSM-LBB)
BREAK DOWN