You are on page 1of 7

Abstract of Cost for Monsoon Damaged Restoration for the financial year 2017-2018 under

Regional office, DoR Tingtibi and Samdrupjongkhar


Structures Slips(b)
Sl. Expenditure Grand Total
Regional office Expenditure Expenditure Sub Total Nu. Expenditure Sub Total Nu. Nu. (A+B)
No Required
Incurred (Nu.) Required (Nu.) (A) Incurred(Nu.) (B)
(Nu.)
1 Tingtibi 0 29,329,309.76 29,329,309.76 9,034,234.64 3,987,723.32 13,021,957.96 42,351,267.71
Samdrupjongkha
2 2,497,388.07 20,622,117.20 23,119,505.27 5,688,788.50 9,213,116.68 14,901,905.18 38,021,410.45
r
  Total Nu. 2,497,388.07 49,951,426.96 52,448,815.03 14,723,023.14 13,200,840.00 27,923,863.14 80,372,678.16
Details Reports on Monsoon Damages(Structure) 2017-2018
Regional Office: Tingtibi
Sl. Chainage Type of
Name of Road Size of Structures Estimated cost Photos
No (Km) Structure
1 Tingtibi-Z/gang-W/gang Retaining wall 3x3m 39,091.39
54.00km
2 PNH Toe wall 6x2m 27,415.30  
16x 5.90m
3 Gomphu-Panbang PNH 1.20km R/wall 845,699.22  
13x 2.m
4 Gomphu-Panbang PNH 2.90km R/wall 25.6x 3.80 m 538,899.22  
5 Gomphu-Panbang PNH 3.00km Formation 50m l4 124,786.49
Cutting  
6 Gomphu-Panbang PNH 17.30km R/wall 50m length 533,492.76  
8.60 m x 6m
7 Gomphu-Panbang PNH 17.50km R/wall 10m x 2m 501,718.27  
11.75m x 3.80m
11.75m x 2.00m
8 Gomphu-Panbang PNH 20.20km R/wall 533,532.35
11.75m x 1.20m
11.75m x 1.00m  
9 Gomphu-Panbang PNH 29.20km R/wall 17.30m x 4.00m 393,803.94  
10 Gomphu-Panbang PNH 33.70km R/wall 17.8m x 3.00m 263,953.88  
Regional Office: Tingtibi
Sl. Chainage Type of
Name of Road Size of Structures Estimated cost Photos
No (Km) Structure
11 Gomphu-Panbang PNH 38.10km R/wall 13.70 x 6.0m 590,852.82  
5.00m span
12 Gomphu-Panbang PNH 38.20km RCC Slab Culvert Abutment=7.5mx6. 2,395,663.95
0m  
RRM R/wall 21x4m
21x2m
RRM
13 8.02km toe wall 15x4m 2 nos. 1441481.4
Gabion
235m
Panbang-Nganglam PNH t/wall
U shape drain
 
RRM R/wall 17.8x4m
14 8.8km 17.8x2m 689710.8
RRM T/wall
2 Nos.  
15 Buli-Nimshong GC Road 0- 10.10km G- Wall 20x9m 1,807,517.20  
16 30.2km 20 km R/wall 12x8.19m 2,750,000.93  
17 Nimshong-Therang GC 16.9km R/wall 10x4m 605,555.55
road(18.4km)  
18 Therang-Khomshar GC road 6.87km R/wall 9.6x4m 584,434.51  
19 (25.6km) 17.9km R/wall 9.6x4m 584,434.51  
20 Dakpel-Buli GC 5.3km R/wall 12x8.19m 2,782,044.70  
21 Road(36.6km) 27.8km G- Wall 23x9m 2,078,644.78  
Regional Office: Tingtibi
Sl. Name of Road Chainage Type of Size of Structures Estimated cost Photos
No (Km) Structure
18x 5.8 m
22 1.70km R/wall 7 x 1.5 m 845,352.31
Goshing GC Road 7.5x 1.5 m  
23 5.80km R/wall 12x 4.30 m 304,379.99  
Total estimated cost for Structure Nu. 21,262,466,27  
Total expenditure incurred for Structure Nu.  0  
Total expenditure required for Structure Nu. 21,262,466,27  
Details Reports on Monsoon Damages(Slip clearance) 2017-2018
Regional Office: Tingtibi
Sl. Expenditure Expenditure Total expenditure
Name of Road Photos
No incurred Nu. (A) required Nu. (B) Nu. (A+B)
1 Tingtibi-Z/gang-W/gang PNH (55 km)
1,448,075.30 426,713.56 1,874,788.86  
2 G/phu-Trongsa PNH (51-114km)  
Tingtibi-Pralong PNH (36 km), Gomphu
3 Dz road (8.72 km) 3,714,641.84 1,104,298.39 4,818,940.23
 
4 Gomphu-Panbang PNH (44km) 743,260.50 570,016.67 1,313,277.17  
5 Panbang-Nganglam PNH (14 km) 769,995.00 443,965.00 1,213,960.00  
6 Buli-Nimshong GC Road (30.2km) 74,144.00 149,874.70 224,018.70  
7 Nimshong-Therang GC road(18.4km)  
8 Therang-Shingkhar GC road (11.8km) 1,353,409.00 576,662.00 1,930,071.00  
9 Therang-Khomshar GC road (25.6km)
 
10 Dakpel-Buli Road (36.6km) 304,709.00 133,865.00 438,574.00  
11 Goshing GC Road (8km) 71,800.00 125,000.00 196,800.00  
12 Bjoka GC road (25.30) 554,200.00 457,328.00 1,011,528.00  
  Total Nu. 9,034,234.64 3,987,723.32 13,021,957.96  