Current set up
Diesel fleet that are currently operating and their specific volumetric flow rate
based on engine power which is 0.06 m3/s per kW Australian standard and the
volumetric flow rate based on the average availability and utilization for the
machines/equipment;
e.g; QTRUCK= 0.06 x 600 = 36 x 3 = 108 m3/s
For the current Number Engine Total engine Amount of Average Average Quantity
situation Power power(kW) air Availability Utilization (m3/s)
(kW) consumed % %
(m3/s)
………………….(ii)
Methods-data analysis……
SENSITIVITY ANALYSIS OF THE DATA
QT100% T BO QB QTOTAL Qm Q TOTAL
Qmax QT QB100%
UTL
100%
LOM UTL UT require UTL % required T&B
UTL
L% d
564 216 10 21.6 114 11 13.1 34.7 283 317.70
564 216 20 43.2 114 23 26.2 69.4 283 352.41
564 216 30 64.8 114 34 39.3 104.1 283 387.11
564 216 40 86.4 114 46 52.4 138.8 283 421.81
564 216 50 108 114 57 65.5 173.5 283 456.52
564 216 60 129.6 114 69 78.6 208.2 283 491.22
564 216 70 151.2 114 80 91.7 242.9 283 525.92
564 216 80 172.8 114 92 104.8 277.6 283 560.63
564 216 90 194.4 114 103 117.9 312.3 283 595.33
564 216 100 216 114 115 131.0 347.0 283 630.03
• Sensitivity analysis on truck and bogger based on 612.39m3/s for the LOM
10 11 317.70 595
20 23 352.41 595
30 34 387.11 595
40 46 421.81 595
50 57 456.52 595
60 69 491.22 595
70 80 525.92 595
80 92 560.63 595
600.00
500.00
Quantity of air(m3/s)
400.00
300.00
200.00
100.00
-
1 2 3 4 5 6 7 8 9 10
10 11 317.70 525
20 23 352.41 525
30 34 387.11 525
40 46 421.81 525
50 57 456.52 525
60 69 491.22 525
70 80 525.92 525
80 92 560.63 525
600.00
500.00
Quantity of air (m3/s)
400.00
300.00
200.00
100.00
-
1 2 3 4 5 6 7 8 9 10
DEC 175 8 1 1 - - - - - 1
RAD 39 - - - - 1 1 - - -
VRA 12 - - - - - 1 1 - -
SP 22 - - - - 1 - 1 - -
X-cut 52 2 1 - - - - 1 - -
X-SP 22 - - - - - - 1 - -
OD(N&S) 122 - - - 4 - - 1 - -
SUB-TOTAL 10 2 1 4 2 2 5 - 1
CONTINGENCY 5% 0.5 0.1 0.05 0.2 0.1 0.1 0.25 -
TOTAL 11 3 2 5 3 3 6 - 1
• For the Life of Mine forecast the ventilation requirement will be as follows:
• Star and Comet CUT 2 which is expected to have a total of 11(eleven) levels and
CUT 3 which is expected to have a total of 12(twelve) levels up to its closure,
then the total number of level for the life of mine will be 23 levels.
1400mm 1220mm
FOR 1 LEVEL 11 3 2 5 3 3 6 - 1