This document provides details about the Belihuloya Small Hydro Power Plant in Sri Lanka, including its net head of 165m, design flow of 1.6 m3/s, and plant capacity of 2200kW generated by 2 Turgo Impulse turbines with a capacity of 1150kW each. The plant was commissioned in May 2002 and has an annual energy generation of 10.2GWh.
This document provides details about the Belihuloya Small Hydro Power Plant in Sri Lanka, including its net head of 165m, design flow of 1.6 m3/s, and plant capacity of 2200kW generated by 2 Turgo Impulse turbines with a capacity of 1150kW each. The plant was commissioned in May 2002 and has an annual energy generation of 10.2GWh.
This document provides details about the Belihuloya Small Hydro Power Plant in Sri Lanka, including its net head of 165m, design flow of 1.6 m3/s, and plant capacity of 2200kW generated by 2 Turgo Impulse turbines with a capacity of 1150kW each. The plant was commissioned in May 2002 and has an annual energy generation of 10.2GWh.