Promote “RIGHT THE FIRST TIME”

Electrical
“RIGHT THE FIRST TIME”
Why “RIGHT THE FIRST TIME “ concept is essential?
 A concept integral to total quality management , where there is a
commitment to customers not to make mistake.
 The approach requires employees at all levels to commit to and take
responsibility for achieving this goal

How to Implement?
 Continuously think of the places/stages where flaws may be introduced.
 Work proactively to address the flaws in your systems and processes,
which allow defects to occur.
Cable lug and Sleeve
Cable lug and Sleeve
1. Finding
1.1 Improper cable termination and cable is not inserted properly in to the
lug completely

2. Why
2.1 Poor supervision
2.2 Instruction is not provided properly to the worker
2.3. Lack of knowledge (Unskilled job)
2.4 Cables must be flexible and straight (should provide enough
clearance after connection)

3. Consequences
3.1 May cause short circuit
3.2 Electric shock
Cable lug and Sleeve
4. Corrective Action
4.1 Disconnect the cable and re-terminate

5. Impact
5.1 Cost (Material(Cable lug), Man Power)
5.2 Time [Arrangement of cable lug]
5.3 Schedule
Grounding / Earthing of cables

û
Grounding / Earthing of cables
1. Finding
1.1 Grounding of equipment and glands are missing

2. Why
2.1 Poor workmanship
2.2 Instruction is not provided properly to the worker
2.3 Poor supervision
2.4 Improper briefing of the consequences if failed to do the job properly

3. Consequences
3.1 Short circuit may lead to equipment damage ( if line is live)
3.2 Electric shock – May lead to fatal accident ( if line is live)
Grounding / Earthing of cables
4. Corrective Action
4.1 Ensure that proper grounding of cables and equipment/panel to ship
structure
shall be provided

5. Impact
5.1 Schedule
5.2 In case of electric shock, there is a possibility of fatal accident
Findings of walkthrough
 Overloaded cables
 Cable tray preservation
 Improper earthing