You are on page 1of 3

Stock WIP Konversi Tambah

Keterangan 12 NOVEMBER 2019 31 OKTOBER 2019 Variance WIP ke FG FG


M3 M3 M3 % M3
1/2 Jadi Block 22.99 41.01 - 18.02 100% (18.02)
Log Block
Block 820.44 759.14 61.30 40% 24.52
Log pendek 70.71 92.55 - 21.84 65% (14.20)
Log Cutting
Log panjang 66.02 21.88 44.14 68% 30.01
Green Core WIP 86.16 56.05 30.11 65% 19.57
Green Veneer Green Face/Back WIP 21.61 5.18 16.43 75% 12.32
Green Long Core WIP 7.62 37.16 - 29.54 75% (22.15)
Repaired Face WIP 36.03 7.96 28.07 100% 28.07
Repaired Back WIP 131.44 88.35 43.09 100% 43.09
Dried Veneer Face Back Setting Face Back WIP 91.34 18.07 73.27 100% 73.27
One Piece Back WIP 227.17 237.52 - 10.35 90% (9.31)
Poly-poly Back WIP 176.22 109.83 66.39 50% 33.19
Repaired Core WIP 467.71 410.33 57.38 100% 57.38
One Piece Core WIP 40.63 53.19 - 12.56 70% (8.79)
Dried Veneer Core
Poly-poly Core WIP 217.27 256.39 - 39.12 50% (19.56)
1x Jatuh Core WIP 10.06 4.24 5.82 50% 2.91
Repaired Long Core WIP 18.52 6.01 12.50 100% 12.50
Dried Veneer Long Core One Piece Long Core WIP 0.00 0.00 - 70% -
Poly-poly Long Core WIP 6.10 1.64 4.47 50% 2.23
RX / MK Dried Core RX WIP 11.31 17.27 - 5.95 100% (5.95)
Dried Log Core RX WIP 6.85 15.33 - 8.48 100% (8.48)
Plywood
Plywood 613.67 707.24 - 93.57 100% (93.57)
TOTAL 3,149.87 2946.34 203.53 139.04
Stock WIP Konversi Tambah
Keterangan 13 NOVEMBER 2019 31 OKTOBER 2019 Variance WIP ke FG FG
M3 M3 M3 % M3
1/2 Jadi Block 26.32 41.01 - 14.69 100% (14.69)
Log Block
Block 821.52 759.14 62.38 40% 24.95
Log pendek 88.34 92.55 - 4.22 65% (2.74)
Log Cutting
Log panjang 109.16 21.88 87.28 68% 59.35
Green Core WIP 123.36 56.05 67.30 65% 43.75
Green Veneer Green Face/Back WIP 39.94 5.18 34.75 75% 26.06
Green Long Core WIP 2.65 37.16 - 34.50 75% (25.88)
Repaired Face WIP 18.99 7.96 11.03 100% 11.03
Repaired Back WIP 122.00 88.35 33.66 100% 33.66
Dried Veneer Face Back Setting Face Back WIP 63.56 18.07 45.49 100% 45.49
One Piece Back WIP 222.50 237.52 - 15.02 90% (13.52)
Poly-poly Back WIP 176.58 109.83 66.74 50% 33.37
Repaired Core WIP 411.61 410.33 1.28 100% 1.28
One Piece Core WIP 43.52 53.19 - 9.67 70% (6.77)
Dried Veneer Core
Poly-poly Core WIP 216.28 256.39 - 40.11 50% (20.06)
1x Jatuh Core WIP 11.74 4.24 7.51 50% 3.75
Repaired Long Core WIP 9.94 6.01 3.93 100% 3.93
Dried Veneer Long Core One Piece Long Core WIP 0.00 0.00 - 70% -
Poly-poly Long Core WIP 4.47 1.64 2.83 50% 1.41
RX / MK Dried Core RX WIP 13.26 17.27 - 4.01 100% (4.01)
Dried Log Core RX WIP 8.93 15.33 - 6.40 100% (6.40)
Plywood
Plywood 681.14 707.24 - 26.10 100% (26.10)
TOTAL 3,215.80 2946.34 269.46 167.88

You might also like