Professional Documents
Culture Documents
Prepared by
Eng. Hossam Eldin Ahmed
This course shows the following:-
* Quick view about rig types and their uses.
* Personnel on rig site.
* Rig main items components.
(Hoisting, rotary and mud circulating system)
“Well control” system functions, constitution
and tests in details.
* Rig equipment and right way to use them.
( Slips, elevators, tongs and F.O.S.V …. Etc.)
safely rig move:-
• 1- Tag line importance and use.
• 2- Dealing with loads lifted.
• 3- visual inspection for wires and shackles.
• 4- Right way for dealing with crane and fork.
Rig Types
1- Hoisting System.
2- Rotating System.
3- Circulating System.
Power tong
Elevators
Slips
DC slips DP slips
Driller console & gauges
Gauges in driller console
gives info. about :-
• Pump speed (SPM)
• Pump pressure (psi)
• Rotary torque (lb. ft)
• Make up torque (lb. ft)
• Rotary speed (RPM)
• Flow line temp.
• Flow line rate
Weight indicator
“Martin Decker”
• Make up torque gauge • Rotary torque gauge
Circulating System
Components:
• Mud Pits
(Suction-Intermediate-Settling)
• Mud Pumps
(Duplex-Triplex)
• Standpipe
• Rotary Hose
• Gooseneck
• Flowline
• Mud Cleaning Equipment
- shakers - sand trap
- Degassers
- desanders & desilters
• Pump pressure gauge • Pump stroke counter
Relief Valve (using shear pin)
Circulatory System
Mud-Gas Separator
Note: MGS: used while killing
Degasser: used while drilling
Drilling Fluids
Types: Functions: Properties:
• Water-Base Mud 1- Remove drilled cuttings • Mud Weight (MWT)
Consisted basically around bit from the Measured using mud balance.
borehole and carry them Units: ppg , pcf
from water with • Funnel Viscosity (VIS)
to the surface (VIS).
other Chemicals. Measured using Marsh Funnel
2- Suspend cuttings when Units: Sec/qt
circulation is stopped (Gel). • Gel Strength (Gel)
• Oil-Base Mud 3- Control subsurface Measured using “Fan VG Meter”
Units: lbs/100ft2
Contains oil as Pressures (MWT). • Plastic Viscosity (PV)
basic component 4- Prevent caving the
borehole (MWT). • Yield Point (YP)
with other
5- Clean, cool and lubricate
chemicals.
the drill bit and Drillstring. • Water Loss
6- Seal porous and
permeable zones with an • Solid %
impermeable filter cake.
• Sand%
7- Provide maximum
information from the
formation drilled
Blowout Prevention System (BOP)
Components:
• Annular Preventor
• Pipe Rams
• Blind Rams
• Shear Rams
• Kill Line
• Choke Line
• Remote BOP Controls
Primary control MUD
MUD HYDROSTATIC
IN WELLBORE
FORMATION FLUID
PRESSURE
MUD 4800
HYDROSTATIC
5000
PSI
PSI
MUD
MUDHYDROSTATIC
HYDROSTATICPREVENTS
PREVENTSFORMATION
FORMATIONFLUIDS
FLUIDS
ENTERING
ENTERINGTHE
THEWELLBORE
WELLBORE
Secondary Control BOP
Blow Out Preventers (BOP)