The document provides details of a tunnel boring machine project that will drill 33km of tunnel. It involves a slurry tunnel boring machine that installs 7 concrete rings per day, using 19 tonnes of concrete to line each 10m section drilled. The project will employ 5000 workers over two shifts and has a total cost of 6 billion.
The document provides details of a tunnel boring machine project that will drill 33km of tunnel. It involves a slurry tunnel boring machine that installs 7 concrete rings per day, using 19 tonnes of concrete to line each 10m section drilled. The project will employ 5000 workers over two shifts and has a total cost of 6 billion.
The document provides details of a tunnel boring machine project that will drill 33km of tunnel. It involves a slurry tunnel boring machine that installs 7 concrete rings per day, using 19 tonnes of concrete to line each 10m section drilled. The project will employ 5000 workers over two shifts and has a total cost of 6 billion.
•AP20588 - Shobhit Agarwal G •AP20590- ShreyanRoy Project Introduction
Slurry Tunnel Boring Machine having metal blades.
Concrete rings are built around the drilled area. 7 rings per day are installed 19 tonnes of concrete 10 m of tunnel drilled per day 33 KM of tunnel to be laid Total cost of project: 6 Billion 5000 workers in two shifts