INTERNSHIP PRESENTATION
On
“KRIES AUDITORIUM CONSTRUCTION”
1. Project overview.
2. Plan of auditorium.
3. Materials Used.
4. Machines Used.
5. Safety measurement.
6. Safety precaution.
7. Checklist for RCC slabs and beams.
PROJECT OVERVIEW
1. Cost of project = Rs 88,25,00,000 .
G+1 to G+ 4 =3.5m.
PLAN OF ADUTORIUM
MATERIALS USED
M-SAND AGGREGATES
STEEL COVER BLOCKS
TENDONS
STAGING MATERIALS PLYWOOD SHEETS
MACHINES USED
CRANE
BAR BENDING MACHINE
AR CUTTING MACHINE TRANSIT MIXER
VIBRATOR PUMP
GAMZON
SAFETY PROCEDURES AT CONSTRUCTION SITE
v. FACE SHIELDS
BASIC SAFETY PRECAUTIONS AT CONSTRUCTION SITE