Professional Documents
Culture Documents
Contoh WB Report Study
Contoh WB Report Study
Date
Wire Bonder Study report
1. Background
2. Purpose
3. BONDING DIAGRAM
Wire Bonder Study report
4.0 Procedure
5.1
5.2
5.3
5.4
5.5
5.6
Qualification Proper
(1)Wire Bonder Model :?
(2) Machine# : ?
(3)Capillary : ?
(4)Gold Wire :?
(5)Bonding Temp :?
(6)Package :?
(7) Device :?
1/26/21 UNISEM 5
Bonding diagram.
1/26/21 UNISEM 6
SIP Parameter
Below is 1st bond parameter used :
Base Time :
Base Power :
Base Force :
FAB :
1/26/21 UNISEM 7
Output response
No Item Sample size Target/Requirement
1 Ball dimension 3 units, all balls Ball Diameter average (X,Y) : 76 -96.3 um
Ball thickness : 7-14 um
2 WPT 10 units, all wires Min per wire 8 g
Cpk computation use 4 g
3 BST 10 units, all wires Min per wire 33 g
Cpk computation use 23.1 g
4 Ball and wedge shape 1 balls and wedges SEM photo
5 Cratering test 2 units, all pads No cratering on pad
6 Intermetallics 2 units, 5 balls >60%
1/26/21 UNISEM 8
Result
Setting 1st 1st 2nd 2nd Ball Size Avg, um
Bond Bond Bond Bond (76 - 96.3 um)
Force Power Force Power MC#
MIN
MAX
Setting 1st 1st 2nd 2nd Ball Thick Avg, um
Bond Bond Bond Bond (7 – 14 um)
Force Power Force Power
MC#
MIN
MAX
Setting 1st 1st 2nd 2nd Wire Pull Avg, g
Bond Bond Bond Bond (min 8 g, cpk use 4 g)
Force Power Force Power
MC#
MIN
MAX
Setting 1st 1st 2nd 2nd Ball Shear Avg, g
Bond Bond Bond Bond (Min 33.2 g, cpk use 23.1 g)
Force Power Force Power
403
1/26/21 UNISEM 9
Result
Setting 1st 1st 2nd 2nd Cratering Test
Bond Bond Bond Bond MC#
Force Power Force Power
MIN
MAX
MIN
MAX
Data Gathering
Worksheet
1/26/21 UNISEM 10
Conclusion
.
Recommendation
1/26/21 UNISEM 11