List of
H6 Units’ drainage pond 1
H7 Side stream filters 1
J11 Oil pump house 1
J12 Oil tank 2
Buildings &
S1 Mechanical Draft cooling tower 10
S2 Circulating water pump house 1
S3 Comprehensive water pump house 1
Structures
S4 Industrial / Firefighting water basin 2
S5 Reuse water Basin 1
S6 Portable water Basin 1
S7 Flocculent Sedimentation Tank 2
(BOP)
S8 Sludge thickening basin 1
S9 Recycling Pound, sludge regulating pound 1
S10 Valveless filter pool 1
S11 Rainwater water pump house 1
S12 Sanitary wastewater treatment equipment and Ponds 1
S13 Coal yard settling pond 1
S14 Emergency oil pond 1
S15 Foam firefighting room 1
S16 Dosing room 1
S17 Boiler blowdown pit 1
T1 Office building 1
T2 Warehouse & Workshop 1
T3 Fire engine Garage & Duty room 1
T4 No. 1 Guarding room 1
T5 No. 2 Guarding room 1
T6 No. 3 Guarding room 1
T7 Security Tower 6 3
H1-Boiler make up water treatment station
Activity ID Activity Name Start Finish % Complete
N0701 VENTILATION AND AIR CONDITIONING FOR BOILER MAKE-UP WATER 2020-11-25 A 2020-12-01 A 100
TREATMENT PLANT
H0201 FLOW DIAGRAM AND EQUIPMENT LAYOUT DRAWINGS OF BOILER 2020-08-25 A 2020-09-23 A 100
MAKE-UP WATER TREATMENT SYSTEM
H0203 OUTDOOR PIPING INSTALLATION DRAWINGS OF BOILER MAKE-UP 2019-11-30 A 2019-12-26 A 100
WATER TREATMENT SYSTEM "
H0204 PIPING INSTALLATION DRAWINGS OF BOILER MAKE-UP WATER 2019-11-30 A 2019-12-29 A 100
TREATMENT SYSTEM PUMP ROOM
S0605 INDOOR POTABLE WATER AND SEWAGE WASTEWATER PIPE FOR 2019-08-30 A 2019-09-23 A 100
BOILER MAKE-UP
K0602 I&C DETAILS FOR BOILER MAKEUP WATER TREATMENT SYSTEM 2020-10-25 A 2020-10-31 A 100
T0802 STRUCTURAL DRAWINGS OF BOILER MAKE-UP WATER TREATMENT 2019-07-30 A 2019-09-13 A 100
PLANT"
T0804 ARCHITECTURAL DRAWINGS OF INDUSTRIAL WASTED WATER TREATMENT STATION 2019-12-31 A 2020-01-06 A 100
T0805 STRUCTURAL DRAWINGS OF INDUSTRIAL WASTED WATER TREATMENT STATION 2020-02-25 A 2020-03-24 A 100
H0801 FLOW DIAGRAM AND LAYOUT DRAWINGS OF INDUSTRIAL WASTEWATER TREATMENT 2019-11-30 A 2019-12-29 A 100
SYSTEM
H0802 INDOOR PIPING INSTALLATION DRAWINGSOF INDUSTRIAL WASTEWATER TREATMENT 2019-12-31 A 2020-01-08 A 100
SYSTEM
OUTDOOR PIPING INSTALLATION DRAWINGS OF INDUSTRIAL
H0804 WASTEWATERTREATMENT SYSTEM 2019-11-30 A 2019-12-28 A 100
H0601 FLOW DIAGRAM AND LAYOUT DRAWINGS OF HYDROGEN GENERATION SYSTEM 2019-12-31 A 2020-01-16 A 100
H0602 INDOOR PIPING INSTALLATION DRAWINGS OF HYDROGEN GENERATION SYSTEM 2020-11-26 A 2021-02-05 A 100
H0603 OUTDOOR PIPING INSTALLATION DRAWINGS OF HYDROGEN GENERATION SYSTEM 2020-11-25 A 2021-03-26 95
H0401 FLOW DIAGRAM,EQUIPMENT AND PIPING INSTALLATION DRAWINGS 2019-10-31 A 2019-11-26 A 100
OF C.W. DOSING SYSTEM
N0704 VENTILATION FOR CIRCULATING WATER DOSING ROOM 2020-12-25 A 2021-01-23 A 100
H0207 PIPING INSTALLATION DRAWINGS OF BOILER MAKE-UP WATER TREATMENT SYSTEM 2019-11-30 A 2019-12-25 A 100
ACID&CAUSTIC METERING ROOM AND DOSING ROOM
H0502 FLOW DIAGRAM AND INSTALLATION DRAWINGS OF CHEMICAL DOSING SYSTEM 2019-07-31 A 2019-08-16 A 100
K0609 I&C DETAILS FOR C.W. DOSING AND BLOWDOWN TREATMENT SYSTEM 2021-03-27 2021-04-26 90
K0609 I&C DETAILS FOR C.W. DOSING AND BLOWDOWN TREATMENT SYSTEM 2021-03-27 2021-04-26 0
J12-Oil tank
Activity ID Activity Name Start Finish % Complete
J2708 INSTALLATION OF PIPES IN FUEL OIL TANK AREA 2019-12-31 A 2020-01-03 A 100
J2755 INSTALLATION OF SUPPORTS AND HANGERS FOR PIPES IN FUEL OIL TANK AREA 2020-08-25 A 2020-09-05 A 100
S2402 INSTALLATION OF FOAM FIREFIGHTING PIPE IN OIL TANK AREA 2020-11-26 A 2020-12-14 A 100
9
T0755 FOUNDATION OF OIL TANK 2020-03-25 A 2021-03-26 90
S1-Mechanical Draft Cooling Tower
Activity ID Activity Name Start Finish % Complete
S0203 LAYOUT AND INSTALLATION OF MECHANICAL DRAFT COOLING TOWER 2020-05-25 A 2020-06-02 A 100
S6402 DRAWING OF UNDERGROUND STRUCTURE OF MECHANICAL COOLING TOWER 2019-06-30 A 2019-07-25 A 100
T0611 ARCHITECTURAL DRAWINGS OF COOLING TOWER AND CIRCULATING PUMP HOUSE LV 2021-03-25 2021-04-23 0
DISTRIBUTION ROOM
SB6250 Custom Clearance and Delivery on Site of Cooling Tower Equipment 2022-02-17 2022-03-04 0
S5701 DRAWING OF UNDERGROUND STRUCTURE OF C.W PUMP HOUSE 2019-07-01 A 2019-07-21 A 100
S5702 ARCHITECTURAL STRUCTURAL DRAWING OF SUPERSTRUCTURE OF C.W PUMP 2019-08-31 A 2019-09-23 A 100
HOUSE
S5703 DRAWING OF FOUNDATION TREATMENT OF C.W PUMP HOUSE 2019-07-01 A 2019-07-22 A 100
K0610 I&C DETAILS FOR CIRCULATING PUMP HOUSE SYSTEM 2020-05-27 A 2021-03-30 90
GY1020 C.W. pump house equipment and piping installation 2021-12-05 2022-05-13 0
S0307 INSTALLTION Drawing OF COMPREHENSIVE WATER PUMP HOUSE 2019-10-31 A 2019-11-28 A 100
DRAWING OF UNDERGROUND STRUCTURE OF COMPREHENSIVE Water Pump
S7040 House 2020-06-25 A 2021-03-25 99
S7041 DRAWING OF SUPERSTRUCTURE OF COMPREHENSIVE WATER PUMP HOUSE 2019-08-31 A 2019-09-23 A 100
S5703 DRAWING OF FOUNDATION TREATMENT OF C.W PUMP HOUSE 2019-12-31 A 2020-02-02 A 100
SBF1000 Comprehensive water pump house civil works completion 2021-06-28 2022-01-26 0
S0308 LAYOUT AND INSTALLATION OF PORTABLE WAYER AND REUSE , 2019-10-31 A 2019-11-29 A 100
USTRIAL/FIREFIGHTING WATER Basin
S7070 DRAWING OF INDUSTRY WATER POND 2019-12-31 A 2021-03-25 99
XFSC1000 Industrial / Fire Fighting Water Basin civil works completion 2021-05-23 2021-10-21 12 0
S5-Reuse Water Basin
S7351 DRAWING OF FOUNDATION FOR SANITARY SEWAGE TREATING EQUIPMENT 2020-04-25 A 2020-05-14 A 100
XFSC1000 Industrial / Fire Fighting Water Basin civil works completion 2021-05-23 2021-10-21 0
15
J11-Oil pump house
Activity ID Activity Name Start Finish % Complete
T0756 ARCHITECTURAL DRAWINGS OF OIL PUMP HOUSE 2019-12-31 A 2020-01-16 A 100
T0757 STRUCTURAL DRAWINGS OF OIL PUMP HOUSE AND OIL-WATER 2021-03-25 2021-04-23 0
TREATMENT
INSTALLATION OF EQUIPMENTS AND PIPES IN FUEL OIL PUMP
J2702 HOUSE" 2020-05-25 A 2020-07-03 A 100
NSTALLATION OF SUPPORTS AND HANGERS FOR PIPES IN FUEL OIL
J2752 PUMP HOUSE 2020-06-25 A 2020-07-24 A 100
S2403 INSTALLATION OF FOAM F.F. SYSTEM IN OIL PUMP HOUSE" 2020-11-26 A 2020-12-11 A 100
D0814 SECONDARY WIRING DIAGRAM FOR OIL PUMP HOUSE MOTOR" 2021-01-23 A 2021-02-22 A 100
YB1000 fuel oil pump house 2021-07-26 2021-12-23 0
T1-Office Building
Activity ID Activity Name Start Finish % Complete
S0603 POTABLE WATER AND SEWAGE WASTEWATER PIPE FOR OFFICE 2019-11-30 A 2019-12-29 A 100
BUILDING
S2105 INSTALLATION OF HYDRANT PIPE FOR OFFICE BUILDING" 2020-05-25 A 2020-06-03 A 100
T0901 STRUCTURAL DRAWINGS OF OFFICE BUILDING 2021-03-25 2021-06-12 0
T0902 STRUCTURAL DRAWINGS OF OFFICE BUILDING 2021-06-12 2021-07-22 16
0
N0901 VENTILATION AND AIR CONDITIONING FOR OFFICE BUILDING 2021-03-25 2021-04-23 0
T2-Ware house & Workshop
Activity ID Activity Name Start Finish % Complete
T0907 ARCHITECTURAL DRAWINGS OF WORKSHOP 2019-10-31 A 2019-11-29 A 100
N0904 VENTILATION AND AIR CONDITIONING FOR WORKSHOP" 2021-01-23 A 2021-02-22 A 100
LIGHTNING PROTECTION & GROUNDING FOR THE OTHER AUXILIARY
D1105 2020-12-25 A 2020-12-26 A 100
WORKSHOPS(2)
D1202 INSTALLATION OF CRANE SLIDING WIRE IN AUXILIARY WORKSHOPS" 2020-10-25 A 2020-12-07 A 100
D1104 LIGHTNING PROTECTION & GROUNDING FOR THE OTHER AUXILIARY 2020-11-25 A 2021-03-25 99
WORKSHOPS(1)
CLK1000 Warehouse 2021-02-26 A 2022-03-25 42
JXJ1000 Workshop 2021-02-26 A 2022-03-25 42
N0905 VENTILATION AND AIR CONDITIONING FOR WAREHOUSE 2021-04-23 2021-05-23 0
CONNECTION AND ARRANGEMENT OF 400/230V SWITCHGEAR FOR
D0513 WORKSHOP, WARE 2021-05-24 2021-06-22 0
D1003 FIRE ALARM SYSTEM FOR THE OTHER AUX.WORKSHOPS 2021-03-25 2021-04-23 0
D1414 LIGHTING ARRANGEMENT FOR OTHER WORKSHOPS" 2021-03-25 2021-04-23 0
N0902 VENTILATION AND AIR CONDITIONING FOR GUARDING ROOM No.1" 2020-04-29 A 2021-04-26 90
T5-No.2Guarding room
Activity ID Activity Name Start Finish % Complete
T0905 ARCHITECTURAL DRAWINGS OF GUARDING ROOM No.2 2019-07-30 A 2019-09-18 A 100
T0906 STRUCTURAL DRAWINGS OF GUARDING ROOM No.2" 2019-07-31 A 2019-09-18 A 100
N0903 VENTILATION AND AIR CONDITIONING FOR GUARDING ROOM No.2" 2020-04-28 A 2021-04-26 90
T6-No.3Guarding room
Activity ID Activity Name Start Finish % Complete
STRUCTURAL DRAWINGS OF GUARDING ROOM
T0908 2019-11-30 A 2019-12-28 A 18 100
No.3
T7-Security Tower
Activity ID Activity Name Start Finish % Complete
T0811 STRUCTURAL DRAWINGS OF OUTDOOR FACILITIES FOR CIRCULATING COOLING 2021-03-25 2021-04-23 0
WATER TREATMENT AND CW DRAINAGE WATER TREATMENT PLANT
FS1000 Industrial water treatment station 2021-04-23 2021-09-20 0
19
BOP AREAS COMPLETION AS PER MASTER SCHEDULE (MARCH 2021)
Sr No Activity ID Description Start Finish % Completed
1 TS4090 Chemical dosing and sampling system Commissioning 2022-06-10 2022-06-20 0
2 N0202 Air Conditioning For Central Control Room and Electronics Room 2021-03-25 2021-04-23 0
3 TS1210 Chemical water purification and Sewage System 2022-03-23 2022-04-30 0
Commissioning
Manager BOP
M. Irfan
Project Engineers
Dilawer Hussain/
Hussnain Nadeem
Supervisors
21
ROLE OF SITE CONSTRUCTION MANAGEMENT TEAM
Area Construction Project Engineers
Area Supervisors
Managers Project Engineers
Assist Project Engineers to
Assist Sr. Construction collaborated with area
verify HSE, quality and
Manager to deliver supervisors are
surveillance checks to
committed construction responsible to verify HSE,
ensure compliance of
targets, lead team of quality and surveillance
approved technical
Engineers and Supervisors checks to ensure
document, drawing,
to ensure compliance of compliance of approved
procedure by EPC
HSE, Quality & technical document,
Contractor at activity
Construction Procedures drawing, procedure by
level. Keep strong
in assigned area. EPC Contractor at activity
surveillance in the area to
Responsible to liaison EPC level. Project Engineer
check work quality and
Contractor Site Team to ensures the tracking and
inform Project Engineer
timely resolve site issues follow up for proper
for any HSE and Quality
in consultation support closure of NCRs, QAs and
related issue.
with 3rd party Inspectors. Field Observations
Dedicated team led by Area Manager(Area Champion) to manage the respective area for
Construction Progress, HSE & Quality
22
KEY INTERNAL CHALLENGES
There are few key internal challenges highlighted below which needs to be resolved for achieving COD
SLOW PROGRESS ON CIVIL WORKS Civil works must be expediate on critical structures like cooling tower & Sludge tank
As local manpower is reluctant to work inside plant premises for long period and
MANPOWER UNAVAILABILITY issue of quarantine protocols make difficult to meet the requirements of excess
manpower
COVID-19 RELATED RESTRICTIONS Travelling restriction due to COVID-19 to be eased up by September 2020
23
WORK CMEC SHALL START ON BOP AREAS
Based on the analysis presented following works on BOP structures shall start immediately:
Colling tower civils structures shall start on war footing basis as it contains complicated civil works, and it takes lengthy time
for construction
Civil works on sludge regulating reservoir and flocculation & sedimentation tank shall also start
As civil works only needs the material which is locally available, CMEC shall take advantage of buying local material and expediate
the civil works as soon as possible
EXISTING SITE PROGRESS ON THE GROUND OF BOP AREAS
Following are the areas of BOP on which certain progress has been done at TNPTL Site:
-Piling work of BOP areas has been completed
-Foundations of Boiler Make-up Water treatment Area has been constructed along with the foundation of outside structure of Recycling pool is also been constructed
-Foundation lean of Mechanical draft cooling towers has been completed
-Foundation and Basin of Sludge Thickening has been constructed.
-Lean foundation of Flocculation Sedimentation Tank
-Foundation Lean of Dosing room has been completed
-Foundation's columns along with anchor bolts installation of Workshop and Warehouse has been completed
-First layer of Sludge storage pond has been completed
-Rainwater Pump House foundation lean completed and erection of foundation of rebar under progress
-Six (6) Security Towers and Three (3) Guard Towers has been Erected