Date: DD/MM/YEAR
Submitted By
1|Page
Contents
3.0 Instrumentations 23
Figure 4: Scatter plot of chiller plant efficiency over cooling load (Example)......................................25
2|Page
1.0 Building Information
Enter a brief description of the building here.
Building Name :
Building Address :
Postal Code :
Building Type :
Building Age :
week
* Trend logged parameters are not limited to the above and may vary depending on the
piping and electrical circuit design.
4|Page
2.2 Chilled Water Plant Normal Operating Hours
Saturday : No operations
Sunday : No operations
Note: The operating hours should follow the table in clause 6.1.4
3.0 Instrumentations
Accurate measuring instruments complying with the Code on Environmental Sustainability
Measures for Existing Buildings or the Code for Environmental Sustainability of Buildings (2 nd
edition and onwards) that is prevailing at the time of installation were used during the audit
to gather information on the power consumption, temperatures and flow rate.
5|Page
4.0 Chiller Plant Performance Analysis
42.85 %
32.19%
%
14.35 %
8.54 %
0.79% 1.28 %
6|Page
Figure 3:Super-imposed plot of daily chiller plant efficiency (Example)
Figure 4: Scatter plot of chiller plant efficiency over cooling load (Example)
7|Page
4.1 Summary of Chilled Water Plant Performance
Efficiency
Unit
Daytime^ Night-time~
~For hotels and other developments with 24-hour operations only; Night-time shall refer to the period from
11pm – 7am;
^ For hotels and other developments with 24-hour operations, day-time shall refer to the period from 7am –
11pm; for all other developments, daytime shall refer to the normal operating hours stipulated in clause 6.1.4
± 5%
8|Page
Quantity Unit Formula
9|Page