Mason Hammer

We need this hammer for cobble-


and kerb stone production

We need this hammer to prepare the


face and the surface of the stones

We need this hammer for placing the


earth nails
Small Sledge Hammer
(lump hammer)
We need this hammer for cobble- and kerb stone
production (also splitting of rocks)

We need this hammer to prepare the face and the


surface of the stones

We need this hammer for placing the earth nails


Chisel
We need this chisel for cobble- and kerb stone
production

We need this chisel to prepare the face and the


surface of the stones

We need this chisel to split cobble stones


(treangle production for fittings)
Spitit Level
We need this spirit level for horizontal- and vertikal
orientation of paving stones, kerbs, strings

We need this spirit level to control the levelness


of our paved vobblestones (short distance)
Straightedge
We need this straightedge for horizontal- and
vertikal orientation of cobble stones on al longer
distance (2-3m)

We need this straightedge to control the


levelness of our paved vobblestones
(longer distance)
Earth nails
We need the earth nails to fix the strings for the
margins of the area we want pave

We need the earth nails to fix the hights on the


placed nails

We need the earth nails to set surveying points,


we can make marks on them with wax chalks.
Stretch strings
We need stretch strings to fix it on the earth nails.
The stretch strings show us the direction and
the high level
Measure tape, measure
rule (measure stick)
We need the measure tools for taking the
measures of lengthness, wideness and
highness
Angle 90°
We need the angle to create 90° angles for
correct squares of a paving area
Hand compactor
We need the hand compactor to jiggle the
cobble stones and the bed of our paved
cobble stones. After this, our
paved cobble stones become a strong fitting
in the sandbed.
Shovel, rake, besom,
pick, trowel
All this tools we need for di fferent works, like:
Excavation, cleaning of the area,
distribute materials,
Complete body protection
- working suit
- safety shoes
- safety gloves
Handout M1 body protection:
Separate body protection

safety shoes and gloves

safety glasses and kneerubber


Sa
nd
We need sand for placing cobble
stones and mixing mortar and concrete
and we can use sand for filling the
seams of our pavement
Crushed stones 2/5
mm or chippings 2/5
mm
We need crushed stones 2/5 mm for placing
cobble stones and for filling the seams of our
pavement

Concrete and mortar

We need concrete and mortar for placing


grooves, gullies, kerbs and rows
Natural cobble stones
Different stones and different materials

Granite, grey, 15/17, placed in rows

Granite, india manga and chinese


yellow, 9/11, placed in segmental archs
Granite, grey, 9/11, placed in segmental archs

Granite, grey, 4/6, and quarzit ledges different coulors placed in a wild
bond

Granite, grey, 9/11, placed in a circle


CONT…
Cobble stone production
Raw material granite, trachyte, basalt
cobble stone production with hammer and chisel
size of stones = 9/11
CON
Kerb stone production

Raw material granite,


 

trachyte, basalt
Kerb stone production with hammer and chise
size of stones = 50/25/10