Marching 4%
8%
Erection
2%
Material Shifting
86%
2. Erection
5
1.Material Shifting
6000 25
5118 22
5000 4900 4944
20
18 18
4000
3500 Avg-15 TPH 15
12
3000
10 10
2000 8
1347 1492
5
1000
0 0
02140195 02140209 02140250 02140268 02140357 02140500
6
2.Erection
100
TONNES ERECTED ERECTION-TPH 14.0
94
90 12.3
12.0
80
10.0
70
60
8.0
50 6.7 48
6.0
40 38
20
1.7 2.0
10
0 0.0
02140195 02140209 02140357 7
Productivity in terms of No. of Lifts
12.0 3.0
2.5 10.3
10.0 9.7 2.5
2.0
8.0 1.9 Avg ~ 2 LPH 2.0
4.1
1.1
4.0 1.0
2.0 0.5
0.0 0.0
02140195 02140209 02140250 02140268 02140357 02140500
Ton/Lift Lifts/Hour 8
Productivity Vs Utility
9
Cost / Ton of Material Handled
6000
Tons Handled Cost/Ton Handled 400
344 5212
350
4944
5000 4900 320
300
4000
3548 250
Cost/Ton
3000 200
Tons
1000
50
0 0
02140195 02140209 02140250 02140268 02140357 02140500
10
Inference & Action Proposed
• Max. deployment of cranes in this 80t category is- for Material Shifting
to erection spot.
• Movement of Material to erection spot-. i.e Logistics planning to be
looked in to for improvement ,thereby reducing the required crane hours
• All averages TPH,LPH,TPL to be reviewed every month .These can be
benchmarked for this site.
• To break down the activities further for study, .viz- erection – can be
studied under diff. heads > Erection - structural- equipment – Piping
> Material Handling– Loading-Unloading –Shifting
• Once we benchmark productivity levels for the above activities, we can
identify the area of improvement & work on the same.
11
How to improve Crane Productivity ????
12
Step #1 – measure /record production
USER
PRODUCTION DETAILS INFORMATI
WORKING DETAILS¤ BREAKDOWN IDLE ON
COMMENCED COMPLETED
HMR HOLDING QTY PRODUCED NO OF USER SIGNATUR
HMR / HMR / WORK DONE‡ AREA∆
DIFFERENCE TIME† (Ton) LIFTS NAME E
TIME KMR TIME KMR Clock Hrs Clock hrs
READING READING
TOTAL
B/DOWN HRS. * IDLE HRS. * HMR RUN ** HOLDING HRS. * PRODUCTION TOTAL NO. OF LIFTS FUEL (IN LTRS) @
(ton)
0 0
Signature of the
User:
14
Step #3 – Measure Gaps & Improve
Microsoft Office
PowerPoint Slide Show
15
How Many Cranes we can have for this job???
16
Microsoft Office
Excel Worksheet
17