Professional Documents
Culture Documents
Civil Department
Present by: Mr.Khamveunh Phothisalath
Position: Civil Supervisor
I. Purpose
II. Design Data
III. Layout of Tailrace Channel
Xe Kong
KOWEPO – Lao International Co.,Ltd River
3
II. Design Data
4
III. Layout of Tailrace Channel
Water Transfer
6
2. Tailrace Bridge #2
Level Elevation
Deepest
Station
Bed Detailed
Left Right Item Remark
Elevation Design
(Sta.) (EL.m) (EL.m)
(EL.m)
Motorway Waterway
7
3. Tailrace Bridge #3
Level Elevation
Deepest
Station
Bed Detailed
Left Right Item Remark
Elevation Design
(Sta.) (EL.m) (EL.m)
(EL.m)
8
4. Tailrace Bridge #5
Level Elevation
Deepest
Station
Bed Detailed
Left Right Item Remark
Elevation Design
(Sta.) (EL.m) (EL.m)
(EL.m)
Xekong River
ay
mx
na
Sa
to
A
18
NH
9
5.Check Dam #1
10
6.Check Dam #2
11
7.Check Dam #3
12
8.Check Dam #4
13
9.Check Dam #5
14
10.Box Culvert #5
3m*1.8m*4cells
15
11.Houay Kanong Diversion
16
12.Labyrinth Weir
Top 91.35 m
Bottom88.5 m
L:27.18m,H:2.85m
91.35 m
17
13.Fence and Gate
Gate
91.35 m
18
14.Slope Protection Work
BERM
Berm
91.35 m
19
15.Xe Kong Outlet
Sta:6+120
Xe kong River
20
16.Pipe Culvert for release water to TRC
Sta:6+120
21
Thank you
22