You are on page 1of 28

Understanding wave projects & SAP

Katerra Saudi Arabia

24-AUG-2020
01 02 03

• Awarded Projects • Material Types • Project Reservations


• No of units in each sites • Material Groups • Goods Issue
• Stakeholders • Material Codes • Direct WBS Goods
• Villa Typologies • BOM – Brief Idea Issue
• T-Codes
Section 01
01

AWARDED
PROJECTS
Project Name: Developmental Housing Projects – Wave 2 &
Wave 3

Note: Unit No's are not


yet fixed, Presented
data asper initial
revision
01

UNDERSTANDING
STAKEHOLDERS
01

VILLA
TYPOLOGIES
There are all together 24 types of villas we are going to construct as per the design

Main Categories:- Subcategories Single:-

• 1BHK –Single • 1BHK –Single Left


• 1BHK – Twin • 1BHK –Single Right
• 2BHK –Single • 2BHK –Single Left
• 2BHK – Twin • 2BHK –Single Right
• 3BHK –Single • 3BHK –Single Left
• 3BHK – Twin • 3BHK –Single Right
• 4BHK –Single • 4BHK –Single Left
• 4BHK – Twin • 4BHK –Single Right
• 1+3 BHK – Combination
• 2+4 BHK – Combination Note: All the above
categories can be again
divided to Edge villas
01
01
01
1BHK DESIGN 2BHK DESIGN 3BHK DESIGN 4BHK DESIGN

Notes:
• All the above drawings are designed in such a way that it can be upgraded with future expansions
• (1BHK & 3BHK) , (2BHK & 4BHK) – Having same length in right side so that they can be paired for combination villas
• All the villa types are developed with 1BHK typical panel layout
01

2BHK vs 4BHK

2BHK SINGLE VILLA (2+4)BHK COMBINATION


VILLA
01

2BHK vs 4BHK

4BHK SINGLE VILLA (4+2)BHK COMBINATION


VILLA
01

1BHK vs 3BHK

1BHK SINGLE VILLA (1+3)BHK COMBINATION


VILLA
01

1BHK vs 3BHK

3BHK SINGLE VILLA (3+1)BHK COMBINATION


VILLA
Section 02
01

MATERIA
Material Type:- YMFG
LS
Material Type:- YROH Material Type:- YSPR

• YMFG – Manufacturing • YROH – Raw materials • YSPR – Spares and


goods • All the materials used to Consumables
• Finished goods which we create a finished goods • All indirect materials that
are producing inhouse • Materials that are are consumed
• Production of YMFG- directly consumed to the • Example:-
Require a list of raw project • Screws
materials • Materials that included in • Nut and Bolts
• Example:- a BOM • Discs
• All concretes (C32, C28, • Example:- • Wheels
C15) • Cement
• All panels and Slabs • Sand
• Insert plates • Steel
01
ILLUSTRATIO RAW
N-1 MATERIALS

CEMENT

MANUFACTURING MATERIALS
(YMFG)
SAND

CONCRETE

AGGREGATE

ADMIXTURE
01
ILLUSTRATIO RAW
N-2 MATERIALS

CONCRETE

MANUFACTURING
MATERIALS
REBAR

PRECAST PANELS

INSERT PLATES

LATTICE GIRDER
MATERIAL GROUPS 01
KSA003 Aggregate KSA005 Insulation
KSA019 Appliances & Gadgets KSA022 IT
KSA802 Boundary Wall KSA025 Mesh
KSA001 Cement KSA009 Paint & Coating
KSA901 CIP General KSA023 Pantry & Housekeeping
KSA902 CIP General Projects KSA017 Plant, Machinery, To
KSA903 CIP-Building KSA013 Plumbing & Sanitary
KSA904 CIP-Building - Projects KSA030 PODS
KSA916 CIP-Computer and other IT Assets KSA028 Polystyrene
KSA912 CIP-Furniture & Fixtures – Projects KSA024 Pre-cast
KSA911 CIP-Furniture & Fixtures KSA010 Precast accessories
KSA910 CIP-Office Equipment - Projects KSA-0003 Asset Buildings
KSA909 CIP-Office Equipment KSA-0006 Asset Furniture & Fixtures
KSA905 CIP-Plant and Machinery KSA-0001 Indirect Purchase for KSA
KSA906 CIP-Plant & Machinery - Projects KSA-0002 Asset Land
KSA915 CIP-Software KSA-0007 Asset Office Equipment
KSA913 CIP-Tools & Molds KSA-0004 Asset Plant & Machinery
KSA907 CIP-Vehicles KSA-0009 Asset Software
KSA908 CIP-Vehicles – Projects KSA-0008 Asset Tools & Moulds
KSA914 CIP-Tools & Molds - Project KSA-0005 Asset Vehicles
KSA032 Civil KSA031 Purchase-Indirect
KSA007 Concrete KSA002 Rebar & Metals
KSA004 Construction Chemicals KSA018 Safety
KSA015 Consumables KSA034 Shuttering
KSA014 Doors, Windows, Join KSA020 Stationery, Office e
KSA011 Electrical KSA801 Third Party Services
KSA027 Fabrication KSA008 Tiles, Marble & Gran
KSA033 Fasteners KSA035 Tools & Shackles
KSA016 Fuel, Oil & Lubrican KSA800 Villa
KSA029 Hard scape KSA021 Water & Sewage
KSA012 HVAC KSA006 Water Proofing
MATERIAL 01

Material code Structure:-


CODES
XX-XX-XX-XX Main Categories:-
• All the material codes are created by dividing in to four 1. Cement
parts 2. Rebar & Metals
• First Part “XX” – Main category 3. Aggregates, Sands
• Second Part “XX” – Subcategory 4. Construction Chemicals
• Third Part “XX” – Number 5. Insulation
• Fourth Part “XX” – Brand 6. Water Proofing
• Description of material code cannot exceed 40 7. Asset items
Character length 8. Tiles, Marble & Granite
9. Paint & Coating
• Example:- 10. Stationary Materials
• 03-02-07-00 -(Coarse Aggregate-10 mm) 11. Precast accessories
• “03” – Main category – Aggregate and Sand 12. Electrical
• “02” – Subcategory – Aggregate 13. HVAC
• “07” – Number – Its 7th Code in this Series 14. Plumbing & Sanitary
• “00” – Brand is not specified 15. Doors, Windows, Joinery, Cabinets
16. Consumables
17. Fuel, Oil & Lubricants
18. P&M Machines
19. Safety
01

PROJECT BOM (BILL OF


Villa Types:- MATERIALS)
BOM Name:- Notes:-

• 1BHK –Single • 1BHK-S-RF • Irrespective of Left /


• 1BHK – Twin • 1BHK-SD-RF Right, Single villas are
• 2BHK –Single • 2BHK-S-RF named with “S” - Single
• 2BHK – Twin • 2BHK-SD-RF • All the twin villas are
• 3BHK –Single • 3BHK-S-RF named with “SD” –Semi
• 3BHK – Twin • 3BHK-SD-RF detached
• 4BHK –Single • 4BHK-S-RF • All the combination
• 4BHK – Twin • 4BHK-SD-RF villas are named with
• 1+3 BHK – Combination • 1BHK-C-RF “C” – Combination
• 3+1 BHK – Combination • 3BHK-C-RF • The Qty in a BOM will
• 2+4 BHK – Combination • 2BHK-C-RF be per Villa Type
• 4+2 BHK – Combination • 4BHK-C-RF • Example:- for 2BHK T,
the qty in the BOM will
be for 2 individual
2BHK villas
01

PRECAST BOM (BILL OF


Types:- MATERIALS)
Material Code:- Notes:-

• 250 mm Insulated panel • V1-IP250-1B-01 • Left / Right Elements are


• 120 mm LB Wall • V1-WL120-1B-01 named with “S” – Single
• 150 mm LB Wall • V1-WL150-1B-01 • Example:-
• 100 mm NLB Wall • V1-WN100-1B-01 (V1-IP250-1BL-01) &
• 90 mm Ribbed Slab • RS90-1B-01 (V1-IP250-1BR-01)
• Boundary wall panel • V1-BW-XX-01 are considered as
• Boundary wall column • V1-FC1-XX-01 (V1-IP250-1BS-01)
• Cap Slab • V1-CAP-1B-01 • For all the combination
• Precast Step for Villas • V1-ST200-01 villas element with “C”
Use the same number
without “C”
• Example:-
(V1-IP250-1BC-01)
Is considered as
(V1-IP250-1B-01)
01

TRANSACTION
T-Codes:- CODES
Usage:-

• MM03 • Display material details by material code


• MM60 • Entire material list created till date
• CS03 • BOM display
• ZPP017 • Production dashboard
• ZPP016 • Goods issue for project reservation
• ZMM078 • STR – STO dashboard
• CO24 • Missing material and quantity in BOM for production order
• MB52 • For checking the stock of a material
• MB51 • Material movement and document list
Section 03
01
RESERVATIO
NS
• Reservations are created only for “Direct Material” i.e. materials that are in project BOM

• The materials that are required to complete a villa are planned as reservations on projects

• If maintained correctly with activity Schedule, this will help in automatic MRP from SAP

• Each BOM will be uploaded on project based on villa typology and number of villas of that type
EXAMPLE:
Project Villa Typology No of Villas BOM Name No. of BOM materials Total Reservations
Wadi Project 2 BHK T 66 / 2 = 33 Twin 2BHK-SD-RF 351 351 X 33 = 11583

Identifying Reservations: Why Missing Reservations ?

• Project Code • Not uploaded to projects


• Villa Type • Not available in BOM
• Villa Number • Alternate material maintained in BOM
• Material Code

Note: No Reservation for Indirect Materials e.g. Consumables / Spares etc. & not maintained in BOM’s
01

GOODS ISSUE
• Materials that are physically issued to Villas should be posted in SAP. This process is called
“Goods Issue”

• “Direct Materials” i.e. BOM material, will be issued against “Reservations” for the project

• Identifying the reservation for “Goods Issue” is explained in above slide

• “Indirect Materials”, will be issued against WBS directly.

• Goods Issue should be posted “Regularly” based on the day to day physical issues.

Over Consumption Under Consumption

• Actual Issue Qty. > BoM Qty • Actual Issue Qty. < BoM Qty.
• Allowed in SAP • Allowed in SAP

Notes: Goods Issue to be done correctly as per physical issue otherwise major issue in “Reconciliation”
01

TRANSACTION
T-Codes:- CODES
Usage:-

• ZPS018 • Upload Reservations to Projects


• ZPS016 • Goods Issues to Project Reservations
• MIGO • Material Goods Receipt / Goods Issue
• MB52 • For checking the stock of a material
• MB51 • Material movement and document list
THANK