01 02 03
AWARDED
PROJECTS
Project Name: Developmental Housing Projects – Wave 2 &
Wave 3
UNDERSTANDING
STAKEHOLDERS
01
VILLA
TYPOLOGIES
There are all together 24 types of villas we are going to construct as per the design
Notes:
• All the above drawings are designed in such a way that it can be upgraded with future expansions
• (1BHK & 3BHK) , (2BHK & 4BHK) – Having same length in right side so that they can be paired for combination villas
• All the villa types are developed with 1BHK typical panel layout
01
2BHK vs 4BHK
2BHK vs 4BHK
1BHK vs 3BHK
1BHK vs 3BHK
MATERIA
Material Type:- YMFG
LS
Material Type:- YROH Material Type:- YSPR
CEMENT
MANUFACTURING MATERIALS
(YMFG)
SAND
CONCRETE
AGGREGATE
ADMIXTURE
01
ILLUSTRATIO RAW
N-2 MATERIALS
CONCRETE
MANUFACTURING
MATERIALS
REBAR
PRECAST PANELS
INSERT PLATES
LATTICE GIRDER
MATERIAL GROUPS 01
KSA003 Aggregate KSA005 Insulation
KSA019 Appliances & Gadgets KSA022 IT
KSA802 Boundary Wall KSA025 Mesh
KSA001 Cement KSA009 Paint & Coating
KSA901 CIP General KSA023 Pantry & Housekeeping
KSA902 CIP General Projects KSA017 Plant, Machinery, To
KSA903 CIP-Building KSA013 Plumbing & Sanitary
KSA904 CIP-Building - Projects KSA030 PODS
KSA916 CIP-Computer and other IT Assets KSA028 Polystyrene
KSA912 CIP-Furniture & Fixtures – Projects KSA024 Pre-cast
KSA911 CIP-Furniture & Fixtures KSA010 Precast accessories
KSA910 CIP-Office Equipment - Projects KSA-0003 Asset Buildings
KSA909 CIP-Office Equipment KSA-0006 Asset Furniture & Fixtures
KSA905 CIP-Plant and Machinery KSA-0001 Indirect Purchase for KSA
KSA906 CIP-Plant & Machinery - Projects KSA-0002 Asset Land
KSA915 CIP-Software KSA-0007 Asset Office Equipment
KSA913 CIP-Tools & Molds KSA-0004 Asset Plant & Machinery
KSA907 CIP-Vehicles KSA-0009 Asset Software
KSA908 CIP-Vehicles – Projects KSA-0008 Asset Tools & Moulds
KSA914 CIP-Tools & Molds - Project KSA-0005 Asset Vehicles
KSA032 Civil KSA031 Purchase-Indirect
KSA007 Concrete KSA002 Rebar & Metals
KSA004 Construction Chemicals KSA018 Safety
KSA015 Consumables KSA034 Shuttering
KSA014 Doors, Windows, Join KSA020 Stationery, Office e
KSA011 Electrical KSA801 Third Party Services
KSA027 Fabrication KSA008 Tiles, Marble & Gran
KSA033 Fasteners KSA035 Tools & Shackles
KSA016 Fuel, Oil & Lubrican KSA800 Villa
KSA029 Hard scape KSA021 Water & Sewage
KSA012 HVAC KSA006 Water Proofing
MATERIAL 01
TRANSACTION
T-Codes:- CODES
Usage:-
• The materials that are required to complete a villa are planned as reservations on projects
• If maintained correctly with activity Schedule, this will help in automatic MRP from SAP
• Each BOM will be uploaded on project based on villa typology and number of villas of that type
EXAMPLE:
Project Villa Typology No of Villas BOM Name No. of BOM materials Total Reservations
Wadi Project 2 BHK T 66 / 2 = 33 Twin 2BHK-SD-RF 351 351 X 33 = 11583
Note: No Reservation for Indirect Materials e.g. Consumables / Spares etc. & not maintained in BOM’s
01
GOODS ISSUE
• Materials that are physically issued to Villas should be posted in SAP. This process is called
“Goods Issue”
• “Direct Materials” i.e. BOM material, will be issued against “Reservations” for the project
• Goods Issue should be posted “Regularly” based on the day to day physical issues.
• Actual Issue Qty. > BoM Qty • Actual Issue Qty. < BoM Qty.
• Allowed in SAP • Allowed in SAP
Notes: Goods Issue to be done correctly as per physical issue otherwise major issue in “Reconciliation”
01
TRANSACTION
T-Codes:- CODES
Usage:-