Problem 7.9
A municipal wastewater treatment plant treats 45.4 million liters per day (MLD). The screenings
amount to 11.2m3 per million cubic meters treated, and the grit amounts to 30m3 per million cubic
meters treated.
Determine:
a. The volume of screenings removed per day, m3.
b. The volume of grit removed per day, m3.
c. The time in days required to fill a 1.2 m × 1.8 m × 1.8 m solid waste storage container
used for temporary storage.
Jawab :
Jawab :
= 0,508 m³/day
Jawab :
b. Diketahui: Qintake = 45,4 million liter per day (MLD)
Jawab :
= 1,362 m³/day
Jawab :
C. Diketahui : Total screening = 0,508 m³/day
Total grit removing = 1,362 m³/day
Jawab :
Lama storage penuh = volume penyimpanan / (total screening + total grit removal)
= 3,888 / (0,508 + 1,362)
= 3,888/ 1,87