The first work to be undertaken before the actual construction of a building is to check the dimensions of its boundaries as soon as the site is made available for construction. The vital boundary stones should be in their position and they should be checked with reference to the survey plan. Any difference that may be found regarding front, rear or side dimensions should be reconciled before the work started. Site layout The site layout for construction consists of access roads, sheds, etc. and should be made as follows: Access roads An examination of the site drawing will determine the best layout for access roads Wherever possible, access to the site for lorries and carts should be the shortest and capable of carrying materials either to a central place of work or various places of work. Sheds An examination of the site drawing will indicate where weatherproof sheds must be erected for storage of materials such as cement, lime and other perishable materials. If the cement has to be large, they should be provided with two separate doors, one at each end – one for accepting delivery and the other for issue of materials. Site clearing Site clearing means any one or all of the following works: Surface cleaning of grass, trees, anthills, etc. Cleaning of obstructions which maybe above or below the ground level Cleaning of obstructions belonging to other organizations Enclosing the site The building site is enclosed for safety of the public. By enclosing the site, it becomes more secure from any theft. It will ensure that the methods of storing materials are safe. Water supply for construction Water is an important building material. Cost of water comes to about 1 – 2% of the cost of civil works. If groundwater is available, it should be tested suitably for various uses. Electrical supply Electricity supply is necessary or modern building works. The points to be observed are: • Cables should be of good quality and suitably supported • The switch board, etc. must be properly enclosed and capable of being locked • The switch board should be about 1.5m above the ground level Protection of existing service lines Provision should be made to protect water, electricity, telephone and other public distribution lines which may be running through the property and be affected by foundation works. All existing service lines should be marked so that workers can identify them and can be careful not to disturb them during the construction. Initial checks on drawings Before commencing actual setting out of the building on the ground, check on the drawing from which the layout is to be carried out. • The sum of the intermediate dimensions should match with those of the overall dimensions. • The levels of various constructions are shown in the drawing. • Check whether the proposed building will actually fit into the plot with the mandatory distances specified by the municipal authority. Setting out of buildings Two operations to set out of buildings: • Setting out of center lines – It means establishing the centers of the walls in case of a building with load bearing walls, or the center of columns in case of a framed building. • Setting out of trenches – establishing the excavation lines for proceeding with the excavation.