Geometric design Presentation For

Woldia Town Stadium Access Road


Design And Construction Project

Feb, 2020
Presentation layouts
Introduction
Detail Geometric Design


Page 2
Introduction


Page 3
Contract Data
Project Name: Woldia Town Section Road project (5.36Km)
Woldia Town Stadium Access Road Project (2.17)

Funding: Government of Ethiopia

Employer Ethiopian Roads Authority (ERA)

Contractor : Zeluel Yohannes General Contractor Joint Venture


Bokra Construction and Trading P.L.C

Employer’s Representative: Pure Consulting Engineers Plc.


Page 4
Project Location

 Located in Amhara National Regional State in the Northern part of the


country
 In North Wollo Zone 
Page 5
Project Description

Starting Point Description Segment One(1) at Mechare Roundabout


Segment two(2) at Station 0+700 on Segment one
Segment three(3) at end of Segment One(1)

Ending Point Description Segment One(1), Near to Stadium main gate


Segment two(2) on the main road from Woldia to Dessie
Segment three(3) at Stadium main gate

Length (km) Segment One(1), 1.32Km

Segment two(2) 0.72Km

Segment three(3) 0.13Km



Page 6
Total Length 2.17Km
Detail Geometric Design


Page 7
Important notes from Employer requirements
and Engineering report
 Since the road give access and mobility between Woldia town and
Stadium, the road could be classified as Link (Class IV) which can be
designed to design classes ranging from DC3 to DC7 according to ERA
Geometric Design Manual 2013.

 Design Standard
 Main Road DC7
 Access Roads DC6
 Departure is not allowed
 The roadway design shall be done with a view of delivering
acceptable and fit for purposes design for road users and avoids
any disruption to people living alongside of the road. The design
shall provide sufficient solutions to problems that may arise in
relation to terrain condition, in particular in town/village
sections the geometric design must consider accessibility
 Topography Flat and rolling

Page 8
DC6 Design Parameters
Urban
Design Element Unit
 

Design Speed km/h 50

Width of Running Surface m 7.0+

Min. Stopping Sight g=0% m 65


Distance g=5% m 70

g=10% m 75

Min. Passing Sight Distance m 180

% Passing Opportunity % 20

Min. Horizontal SE=4% m 95


Curve Radius

Transition Curves Required   No

Max. Gradient(Desirable) % 7

Max. Gradient (Absolute) % 9

Minimum Gradient % 0.5

Maximum Super-elevation % 4

Min. Crest Vertical Curve K 10

Min. Sag Vertical Curve K 7

Normal Cross fall % 2.5


Page 9
Typical Section


Page 10
Typical Section


Page 11
Typical Section (Unsuitable section)


Page 12
Horizontal Alignment
• Horizontal alignment design has been made to meet
the requirement of DC6, driving comfort and
consider the right of ways.
• Follow the Existing Roads to avoid access problem ,
to minimize the right of way obstructios and Excess
Excavation and Fill Volume
• All the Horizontal Curve Data meet the requirements

Name of Segment Length No of Curve Departed Curve


  Concept Design Concept Design Concept Design
Segment -1 1319.364 1277.767 4 2 0 0
Segment -2 718.216 705.987 4 4 1 0
Segment -3 128.366 135.078 0 0 0 0
Total 2165.946 2118.832 8 6 1 0


Page 13
Vertical Alignment
• Vertical alignment design has been made to meet the requirement of
DC6, driving comfort, easy access to residence along the road, and to tie
with existing features(Start and end) .
• All the vertical curves consider
• the minimum cover of the structure
• proper channelization and
• Fill Height and Cut depth to minimize the earth work volume
• All Vertical Grade and Curve Data meet the requirements except 2 in
segment 2 roads


Page 14
Departures from standards
Road safety design
Road furniture and markings
The following road furniture and markings are designed for the
project road
 Traffic sign,
 Road Marking
 Guide posts (Marker Posts) and
 Guard Rail
Construction Quantities
• Based on the design of Horizontal and Vertical alignment and Typical
section of the road, the construction quantities has been computed.
• the major construction item is.
Segment 1 Segment 2 Segment 3 Total
Item Unit Concept Design Concept Design Concept Design Concept Design Difference
Normal Cut:  M3 9603.33
6630.94 9109.6 6427.94 328.12 535.99 19,041.05 13,594.87 (5,446.18)
Normal Fill:  M3 17424.57
17046.85 4064.05 1570.2 187.23 196.98 21,675.85 18,814.03 (2,861.82)
Curbstone:  M3
592.39 573.71 165.83 163.01 29.64 31.19 787.86 767.91 (19.95)
median:  M3 1762.32
1707.34         1,762.32 1,707.34 (54.98)
masonry Ditch:  M3 1828.64
1770.98 995.45 978.5 177.91 187.22 3,002.00 2,936.70 (65.30)
WLK Subbase:  M3 1434.88
1389.64 198.01 194.64 35.39 37.24 1,668.28 1,621.52 (46.76)
SB:  M3 5607.3
5430.51 1339.68 1332.4 224.64 236.39 7,171.62 6,999.30 (172.32)
BC:  M3 3925.11
3801.36 937.78 932.68 157.25 165.47 5,020.14 4,899.51 (120.63)
AC:  M3 1121.46
1086.1 267.94 266.48 44.93 47.28 1,434.33 1,399.86 (34.47)
C 20 Concrete:  M3 475.76 460.76 258.99 254.58 46.29 48.71 781.04 764.05 (16.99)


Page 17
Thank you