Why Test?
New York State DEC 10 year MOSF pipeline testing
requirement
 Section 6NYCRR, Part 613.6 “Handling and Storage of Petroleum”
 Standard Test Procedures for Evaluating Leak Detection Methods:
Pipeline Leak Detection Systems, EPSA/530/UST-90/010
Leak Detection System Technology Requirements
 3rd Party Evaluated
 Listing on NWGLDE
 MDLR of .0038% line volume @ normal operating pressure with a
PD of 95% and PFA of 5%
JFK Airport Fuel System-Overview

North Transmission Lines


10 Lines to Terminals 6, 7, 8
Bulk Fuel Farm
62 Tanks w/ associated pipeline

Terminal Hydrant Lines


8 Systems with unique isolation, surge
suppression, fueling schedules

Transfer Lines Satellite Fuel Farm


6 Lines transfer all fuel from 40 Tanks w/ associated pipeline
Bulk to Satellite Fuel Farms

South Transmission Lines


16 Lines to Terminals 1, 2, 3, 4, 5
Project
Project conducted in phases
1. Six Fuel Farm Transfer Lines
2. Eight Terminal Hydrant Systems
• All individually contracted
3. 27 Transmission Lines
4. Bulk and Satellite Fuel Farm Tank Lines
Common to all projects
 Testing scheduled with fuel operator
• Operations would need to continue
 Isolation required for every line tested
HCNA Leak Detection System-Concept

Dual Pressure Step Method


Test section must be fully
isolated for duration of test
 No fuel movement during test
Connect Trailer to Test Section
45 minute test duration
Capable of detecting a leak of 0.068 gal/hr or 0.002% of line
volume at a PD>95% and PFA<5% at reference pressure of
145psi
Leak Simulation confirms Test Result
Project Phase 1:
Bulk to Satellite Transfer Lines - “Lifeline of JFK”

Proving the concept: Will testing at JFK work???


September 28-29, 2009: All parties involved

Testing Successful! Concept Proven!!


Project Phase 2:
Terminal Hydrant Pipeline

Contracted individually for each


terminal
Unique testing conditions,
scheduling, and configurations for
each terminal
To accommodate fueling
operations, testing was
performed during the day and
night
 Strict 4 hour hydrant shutdown
windows
 Escort required at all times
JFK Hydrant Line
Testing Example: Terminal 4

Terminal 4
 9 hydrant lines
 5 separate test sections
 2 concourses + hardstand
Isolation of fuel lines
 Four isolation pits
 16 surge suppressor pits
Test connections
 HPVs and/or LPDs
 Jumper hoses
Day/night scheduling
Vault access
Project Phase 3:
Transmission Lines
26 lines transmit fuel from Satellite Fuel
Farm to each terminal’s hydrant lines
3 or 4 transmission lines dedicated to
each of the 8 terminals
HCNA test connections made at Satellite
Fuel Farm
Coordinated with each terminal which
lines would be shutdown for testing
PA assisted HCNA in isolation procedures
 Performed at each isolation vault adjacent
to terminals
When possible, multiple sections tested
simultaneously
JFK Transmission Lines
Example: Terminal 1

3 Transmission Lines
At least one line
allocated for fueling
operations during testing
Isolation vault accessed
in busy fueling apron
 PA assistance
No contractor needed for
isolation requirements
Project Phase 4:
Fuel Farms

Bulk Fuel Farm Satellite Fuel Farm

127 pipeline test sections  72 pipeline test sections


 Consolidated into 73 after testing was  No impact to fueling operations
complete
 Using chemical marker
Using HCNA LDS, operations
continued despite testing technology, operations
 timing and fuel rerouting continued despite testing
Testing completed in 12 weeks (51  Testing completed in 7 weeks
days of testing)
Bulk Fuel Farm Test Section
“Fill F/S 7,8”
 Constant operational use  Valves
 Immediately downstream of Buckeye  Check valves
Partners, L.P. operations  Poor isolating butterfly valves (BFV)
 Inactive headers at filter station
 Excessive air  Poor isolating double block and bleed
 Above and below ground pipe segments valves on Buckeye manifold
 Trapped air  Non-functioning plug valves
 No test connection points
Bulk Fuel Farm Test Section
“Fill F/S 7,8”

Problem HCNA Solution


 Constant operational use Non-utilized bypass line
 Check valves Jumper hose
 Poor isolation of butterfly Back-up with additional in-
valves line valves
 Poor isolation on Buckeye Buckeye repaired overdue
manifold valve bodies
 Non-functioning plug valves Added in separate section
 Trapped air in high point areas Flushed line into vactruck
 High traffic area by testing rig Restricted fuel truck access
 Lack of connection points Utilized thermal wells
Results
Volume Test Volume Test
Area Description Result Area Description Result
(gal) Method (gal) Method
Terminal 1 Loop A 25,000 PASS Other Transmission Line T-404-4 58,053 PASS HCNA LDS
Terminal 1 Loop B 25,000 PASS Other Transmission Line T-405-1 36,020 PASS HCNA LDS
Terminal 2 Terminal 2 407-2 11,917 PASS HCNA LDS Transmission Line T-405-2 44,000 PASS HCNA LDS
Terminal 3 Terminal 3 405-3 11,271 PASS HCNA LDS Transmission Line T-405-3 21,123 PASS HCNA LDS
Terminal 3 Terminal 3 405-1 33,022 PASS HCNA LDS Transmission Line T-406-1 15,101 PASS HCNA LDS
Terminal 3 Terminal 3 405-2 13,289 PASS HCNA LDS Transmission Line T-406-2 15,053 PASS HCNA LDS
Terminal 4 Concourse B East 9,994 PASS HCNA LDS Transmission Line T-406-3 10,650 PASS HCNA LDS
Terminal 4 Concourse A East 23,645 PASS HCNA LDS Transmission Line T-407-1 24,090 PASS HCNA LDS
Terminal 4 Concourse A West 13,852 PASS HCNA LDS Transmission Line T-407-2 37,553 PASS HCNA LDS
Terminal 4 Concourse B West 16,411 PASS HCNA LDS Transmission Line T-407-3 18,420 HCNA LDS
Terminal 4 Hardstand System 1 15,331 PASS HCNA LDS Transmission Line T-408-1 17,600 PASS HCNA LDS
Terminal 5 Terminal Five Hydrant 66,151 PASS HCNA LDS Transmission Line T-408-2 20,577 PASS HCNA LDS
Terminal 6 System 3 6,237 PASS HCNA LDS Transmission Line Co-Gen 520 PASS HCNA LDS
Terminal 6 System 1 West 7,147 PASS HCNA LDS Transmission Line T-409-1 57,309 PASS HCNA LDS
Terminal 6 System 1 East 11,589 PASS HCNA LDS Transmission Line T-409-2 37,282 PASS HCNA LDS
Terminal 6 System 2 11,589 PASS HCNA LDS Transmission Line T-409-3 25,469 PASS HCNA LDS
Terminal 7 System 1 22,588 PASS HCNA LDS Satellite Fuel Farm
Satellite Fuel Farm 117,350 PASS Tracer
Terminal 7 System 2 14,894 PASS HCNA LDS Piping
Terminal 7 System 3 8,461 PASS HCNA LDS Transfer Line T-201 14,981 PASS HCNA LDS
Main Terminal & Transfer Line T-202A 25,941 PASS HCNA LDS
Terminal 8 21,651 PASS HCNA LDS Transfer Line T-202B 25,941 PASS HCNA LDS
Concourse B
Concourse C Hydrant Transfer Line T-203A 25,941 PASS HCNA LDS
Terminal 8 15,285 PASS HCNA LDS Transfer Line T-203B 25,941 PASS HCNA LDS
Loop
Terminal 8 Transfer Lines 15,733 PASS HCNA LDS Transfer Line T-204 14,981 PASS HCNA LDS
Transmission Line T-401-1 51,887 PASS HCNA LDS Bulk Fuel Farm F-101, F-103 8,566 PASS HCNA LDS
Transmission Line T-401-2 43,078 PASS HCNA LDS Bulk Fuel Farm F-102 4,847 PASS HCNA LDS
Transmission Line T-401-3 30,485 PASS HCNA LDS Bulk Fuel Farm F-104, F-105 4,935 PASS HCNA LDS
Transmission Line T-402-1 77,333 PASS HCNA LDS Bulk Fuel Farm F-26, F-23, F-24, F-25 8,466 PASS HCNA LDS
Transmission Line T-402-2 77,037 PASS HCNA LDS
Transmission Line T-402-3 75,211 PASS HCNA LDS Bulk Fuel Farm F-28, F-27 4,083 PASS HCNA LDS
Transmission Line T-403-1 39,700 PASS HCNA LDS Bulk Fuel Farm F-124 2,599 PASS HCNA LDS
Transmission Line T-403-2 31,779 PASS HCNA LDS Bulk Fuel Farm F-21, F-22 520 PASS HCNA LDS
Transmission Line T-404-1 58,688 PASS HCNA LDS Bulk Fuel Farm F-120, F-123 15,828 PASS HCNA LDS
Transmission Line T-404-2 58,477 PASS HCNA LDS Bulk Fuel Farm F-122 8,154 PASS HCNA LDS
Transmission Line T-404-3 58,266 PASS HCNA LDS Bulk Fuel Farm F-121 8,101 PASS HCNA LDS
Results (continued)
Volume Test Volume Test
Area Description Result Area Description Result
(gal) Method (gal) Method
Bulk Fuel Farm F-115, F-117, F-119 23,939 PASS HCNA LDS Bulk Fuel Farm D-20 395 PASS HCNA LDS
Bulk Fuel Farm F-118 9,582 PASS HCNA LDS Bulk Fuel Farm D-33 1,097 PASS HCNA LDS
Bulk Fuel Farm F-116A 10,118 PASS HCNA LDS Bulk Fuel Farm D-34 1,059 PASS HCNA LDS
Bulk Fuel Farm F-116B 2,702 PASS HCNA LDS Bulk Fuel Farm D-35, D-36 2,023 PASS HCNA LDS
Bulk Fuel Farm F-133, F/S Header 8,108 PASS HCNA LDS Bulk Fuel Farm D-37, D-38 1,882 PASS HCNA LDS
Bulk Fuel Farm F-132 4,388 PASS HCNA LDS D-39, D-40, D-41, D-
Bulk Fuel Farm 928 PASS HCNA LDS
Bulk Fuel Farm F-134 7,393 PASS HCNA LDS 42
Bulk Fuel Farm S-102 7,849 PASS HCNA LDS Bulk Fuel Farm S-203 1,634 PASS HCNA LDS
Bulk Fuel Farm S-101 9,700 PASS HCNA LDS Bulk Fuel Farm S-201 1,065 PASS HCNA LDS
Bulk Fuel Farm S-103 9,162 PASS HCNA LDS Bulk Fuel Farm S-202 1,827 PASS HCNA LDS
Bulk Fuel Farm S-104 8,734 PASS HCNA LDS Bulk Fuel Farm T-208 470 PASS HCNA LDS
Bulk Fuel Farm S-105, S-204 10,917 PASS HCNA LDS Bulk Fuel Farm S-117 8,443 PASS HCNA LDS
Bulk Fuel Farm D-21 501 PASS HCNA LDS Bulk Fuel Farm P-35 260 PASS HCNA LDS
Bulk Fuel Farm D-22 504 PASS HCNA LDS Bulk Fuel Farm S-115 & T-211 10,138 PASS HCNA LDS
Bulk Fuel Farm D-23, D-24 1,700 PASS HCNA LDS Bulk Fuel Farm S-116 9,994 PASS HCNA LDS
Bulk Fuel Farm D-26, D-25 1,117 PASS HCNA LDS Bulk Fuel Farm S-118 7,557 PASS HCNA LDS
Bulk Fuel Farm D-27, D-28 1,723 PASS HCNA LDS Bulk Fuel Farm S-119 4,243 PASS HCNA LDS
Bulk Fuel Farm D-29, D-30 1,607 PASS HCNA LDS Bulk Fuel Farm S-120, S-121 9,872 PASS HCNA LDS
Bulk Fuel Farm D-31, D-32 1,490 PASS HCNA LDS Bulk Fuel Farm S-122, S-123 13,350 PASS HCNA LDS
Bulk Fuel Farm S-106 3,363 PASS HCNA LDS Bulk Fuel Farm D-43, D-44 1,779 PASS HCNA LDS
Bulk Fuel Farm S-108 3,383 PASS HCNA LDS Bulk Fuel Farm D-45, D-46 1,630 PASS HCNA LDS
Bulk Fuel Farm S-107 6,795 PASS HCNA LDS Bulk Fuel Farm D-47, D-48 1,674 PASS HCNA LDS
Bulk Fuel Farm S-109 5,497 PASS HCNA LDS Bulk Fuel Farm D-49, D-50 1,718 PASS HCNA LDS
D-13, D-14, D-15, D- Bulk Fuel Farm S-103 11,346 PASS HCNA LDS
Bulk Fuel Farm 671 PASS HCNA LDS
16 Bulk Fuel Farm S-102 11,416 PASS HCNA LDS
Bulk Fuel Farm S-27A, S-28A 3,348 PASS HCNA LDS Bulk Fuel Farm S-101 11,502 PASS HCNA LDS
Bulk Fuel Farm S-28 799 PASS HCNA LDS Bulk Fuel Farm F/S Header 1,292 PASS HCNA LDS
Bulk Fuel Farm S-27 1,470 PASS HCNA LDS Bulk Fuel Farm F-120 3,337 PASS HCNA LDS
Bulk Fuel Farm S-31 2,003 PASS HCNA LDS Bulk Fuel Farm F-119 3,877 PASS HCNA LDS
Bulk Fuel Farm S-114 352 PASS HCNA LDS Bulk Fuel Farm F-127 3,478 PASS HCNA LDS
Bulk Fuel Farm D-17, D-19 538 PASS HCNA LDS Bulk Fuel Farm Fill F/S 7&8 20,348 PASS HCNA LDS
Bulk Fuel Farm S-30 1,065 PASS HCNA LDS
Bulk Fuel Farm S-29 194 PASS HCNA LDS
Bulk Fuel Farm S-21, S-22 1,289 PASS HCNA LDS
Conclusion
Tightness Testing the most complex, largest Airport fuel
system in U.S.
 20,500,000 gallons of total fuel storage at any time
• 2,078,000 gallons of line fill
 ~3,500,000 gallons of daily throughput
• Replenishing pipeline about 2x per day
 Successfully performed all leak detection activities without any
impact on Airport Operations
 Right plan, right partners
• Successfully tested and complied with State Requirements

We did it So can you!


Questions?

Charlie Fenton
Hansa Consult of North
America, LLC
200 International Drive
Bldg. 120
Portsmouth, NH 03801
T: 603.422.8833
M: 603.828.1670
F: 603.422.8865
cfenton@hcna-llc.com
www.hcna-llc.com
Fill F/S 7,8
Fuel Farm Overviews

You might also like