1. Pipeline Details
Length OD Wall Thk Approx. Hydro test
Pipeline From To Grade Service
(km) (mm) (mm) Volume (M3) Pressure
2. Scope of Work
Pipeline flooding, Cleaning & Gauging.
Pipeline Hydrotesting
System Leak Testing
Dewatering Operation.
3.1 Limits
Pipeline Flooding, Cleaning and Gauging
Pipeline Hydrotesting
Description From To
Hydro testing of Combine 48"
Offshore pipelines 1 & 2 including Test Blind on PL-1 end at LFP Test Blind on PL-1 end at LFP
PLEM & Tie-in Spools
Remarks:
24” 300# (RTJ) HV (hand operated) valves shall be blinded.
FV1,FV2.FV3.FV4.FV5.AND FV6 Valves shall be kept in half open position prior hydrotesting
commencement.
Refer to the Drawing TAPS-W305-BL-002 Battery Limit for the HT of 48” Offshore Pipelines and valve
position status during hydrotest in annexure 4
Refer to the Markup P& ID in annexure 9
Leak Testing
Description From To
Leak testing of Submarine Hoses Test Blind on the floating hose
Test Blind on the floating hose 2
+ SPM + Floating hoses -1
Remarks
24” 300# (RTJ) HV (hand operated) valves (2 Nos F5,F6) shall be in closed position.
FV1, FV2.FV3.FV4. valves shall be in half open position position
Refer to the Drawing TAPS-W305-BL-004 Battery Limit for the Leak test of and for valve position status of
PLEM during leak test in annexure 4
Refer to the Markup P& ID in annexure 9 for valve status of SPM during the leak test.
**Leak Test shall be performed against the closed vales of the PLEM.
Dewatering Operation
Description From To
Temporary Scraper launcher Temporary scraper receiver at LFP
Dewatering of complete Section
at LFP of PL-1 of PL-2
Remarks
FV1,FV2 in full open position prior dewatering activity.
F5, F6 remains in closed position prior dewatering activity.
FV3,FV4, Valves shall be kept in half open position prior to Dewatering activity
Refer to Drawing TAPS-W305-DW-ES-001 in annexure 4 for battery limits of the dewatering activity and
for the valve status of the PLEM during dewatering activity.
LFP
PLEM
80% of 90% of 95% of 100% of Strength Tightness
Pressurization 35
the test the test the test the test test Test
Cycle Bar
pressure pressure Pressure pressure Period Pressure
Pressurization
rate should
1 1 1 0.5 0.5 - -
not exceed
(Bar/Min)
Pressure at
Lowest Point
(Subsea PLEM 35.0
61.6 / 69.3 / 73.1 / 77.0 / 77.0 / 73.1 /
end) due to /
893.2 1004.85 1060.75 1116.0 1116.0 1060.75
elevation 507.5
difference
(Bar / PSIG)
Pressure to be
maintained at
onshore end 32.4
59.0 / 66.7 / 70.5 / 74.4 / 74.4 / 70.5 /
due to /
855.5 967.1 1022.2 1078.8 1078.8 1022.2
elevation 469.8
difference
(Bar / PSIG)
Holding time 1
2 Hours 2 Hours 2 Hours 2 Hours 2 Hours 24 Hours
hour
Turn
50% of 80% of 100% of Leak 50% of 100% of
Pressurization table
the test the test the test test the test the test
Cycle test
pressure pressure pressure Period pressure pressure
preiod
Pressurization
1 1 0.5 - - 1 -
rate (Bar/Min)
Pressure at
Lowest Point
(Subsea PLEM
9.5 / 15.2 / 19.0 / 19.0 / 9.5 / 19.0 / 19.0 /
end) due to
137.75 220.4 275.5 275.5 137.75 275.5 275.59
elevation
difference
(Bar / PSIG)
Pressure to be
maintained at
onboard
floating hoses 6.9 / 12.6 / 16.4 / 16.4 / 12.6 / 16.4 / 16.4 /
end due to 469.8 182.7 237.8 237.8 182.7 237.8 237.8
elevation
difference
(Bar / PSIG)
Holding time 2
1 hour 2 Hours 2 Hours 1 Hours - -
Hours
10. Dewatering Scraper Train
1. Bi-Di Batch scraper (Scraper-1)
2. Propel the scraper up to 200 linear meters which is equivalent to a volume of 199.5 Cu.M using fresh
water.
3. Bi-Di Batch Scraper (Scraper-2)
4. Propel the scraper up to 200 linear meters which is equivalent to water volume of 199.5 Cu.M using oil
free compressed air.
5. Bi-Di Batch Scraper – magnetic brush(Scraper-3)
6. Propel the scraper up to 200 linear meters which is equivalent to a water volume of 199.5 Cu.M using
oil free compressed air.
7. Bi-Di Batch Scraper with Pinger (Scraper-4)
8. Propel all 4 scrapers using the oil free compressed air till all the 4 scrapers reaches to the temporary
receiver at the LFP of PL-2.