ANALYSIS OF RATE FOR EARTH WORK

1) Earthwork in excavation in trenches for foundation & for pipes, cables etc. not exceeding 1.5
m in width including dressing of sides & ramming of bottoms, lift up to & lead up to 30 m.
a) In ordinary soil (i.e. loose or soft) --------------------------- consider 10 cu . m.

Particulars Quantity Rate Amount

A) Labour

Mazdoor 3¼

Beldar

B) Water charges @1% of total

Total

C) Profit & Overhead @10% of total

Grand Total
ANALYSIS OF RATE FOR EARTH WORK

1) Earthwork in excavation in trenches for foundation & for pipes, cables etc. not exceeding 1.5
m in width including dressing of sides & ramming of bottoms, lift up to & lead up to 30 m.
a) In Dense soil (i.e. Hard) --------------------------- consider 10 cu . m.

Particulars Quantity Rate Amount

A) Labour

Mazdoor 7¾

Beldar

B) Water charges @1% of total

Total

C) Profit & Overhead @10% of total

Grand Total
ANALYSIS OF RATE FOR EARTH WORK

1) Earthwork in excavation in trenches for foundation & for pipes, cables etc. not exceeding 1.5
m in width including dressing of sides & ramming of bottoms, lift up to & lead up to 30 m.
a) In Mud soil --------------------------- consider 10 cu . m.

Particulars Quantity Rate Amount

A) Labour

Mazdoor 9¼

Beldar

B) Water charges @1% of total

Total

C) Profit & Overhead @10% of total

Grand Total
ANALYSIS OF RATE FOR EARTH WORK

1) Earthwork in excavation in trenches for foundation & for pipes, cables etc. not exceeding 1.5
m in width including dressing of sides & ramming of bottoms, lift up to & lead up to 30 m.
a) In Mud soil --------------------------- consider 10 cu . m.

Particulars Quantity Rate Amount

A) Labour

Mazdoor 9¼

Beldar

B) Water charges @1% of total

Total

C) Profit & Overhead @10% of total

Grand Total
ANALYSIS OF RATE FOR EARTH WORK
1) Earthwork in excavation in trenches for foundation & for pipes, cables etc. not exceeding 1.5
m in width including dressing of sides & ramming of bottoms, lift up to & lead up to 30 m.
a) In Disintegrated rock or soft rock --------------------------- consider 10 cu . m.
Particulars Quantity Rate Amount
A) Labour
Excavator (Skilled) 1¾
Breaker (Skilled) 3½
Hole Driller ( Skilled) 1
Mazdoor ( Male) 7½
B) Material – Fuse 3 Nos.
Powder 2 ¼ Kg
Contingencies ,T.&P. etc ½ % (A+B)
Total
ANALYSIS OF RATE FOR EARTH WORK ( continued-----)

Particulars Quantity Rate Amount

Total ---------

C) Water charges @ 1% of total ----------


Total ------------

D) Profit & Overhead @ 10% of Total ---------

Grand Total --------------


ANALYSIS OF RATE FOR EARTH WORK
1) Earthwork in excavation in trenches for foundation & for pipes, cables etc. not exceeding 1.5
m in width including dressing of sides & ramming of bottoms, lift up to & lead up to 30 m.
a) In Hard Rock ( Blasting Required ) --------------------------- consider 10 cu . m.
Particulars Quantity Rate Amount
A) Labour
Excavator (Skilled) 3½
Breaker (Skilled) 07
Hole Driller ( Skilled) 02
Mazdoor ( Male) 7½
B) Material – Fuse 7 Nos.
Powder 6.5Kg
Contingencies ,T.&P. etc ½ % (A+B)
Total
ANALYSIS OF RATE FOR EARTH WORK ( continued-----)

Particulars Quantity Rate Amount

Total ---------

C) Water charges @ 1% of total ----------


Total ------------

D) Profit & Overhead @ 10% of Total ---------

Grand Total --------------


ANALYSIS OF RATE FOR PLINTH FILLING

1) Filling available excavated earth in trenches, plinth sides of foundation in layers not
exceeding 20 cm in depth consolidating layer by layer ramming & watering , lead up to 50 m
and lift up to 1.5 m. --------------------------- consider 10 cu . m.
Particulars Quantity Rate Amount

A) Labour

Mazdoor (including Bhisti) 2 1/3 ------------

B) Water charges @ 1% of total ------------

Total -----------

C) Profit including overhead @10% of Total

Grand Total -------------


REINFORCEMENT FOR R.C.C.
• Expressed as % age of vol. of concrete.
• 1% of steel means there will be 78 kg of steel per cu.m. of volume of
concrete.

SR.NO. ITEM % OF STEEL (BY VOL. OF CONC .)


1 SLAB 0.9 % TO 1.5%
2 FOUNDATIONS 0.5 % TO 1.0%
3 WALLS 1% TO 2%
4 COLUMN 1% TO 3%
• Binding wire = 1 kg to 1.3 kg per quintal of steel reinforcement.
5 LINTELS, BEAMS 1.5% TO 3%
REINFORCEMENT FOR R.C.C.
• Labour required as below

SR.NO. ITEM PER LABOUR TYPE AND TASK WORK


1 Centering & shuttering for flat 10 SQ.M Carpenter -3
surfaces Mazdoor - 4
2 Reinforcement work for R.C.C. QUINTAL Mason cum Black smith – 1
Mazdoor - 1
3 Reinforced Brickwork 10 CU.M. Head Mason – 1
Mason- 10
Mazdoor – 16
Bhisti -4
Black smith – 5
Mazdoor for M . S. Work - 6
ANALYSIS OF RATE FOR REINFORCEMENT
Providing mild steel reinforcement for R.C.C. work including bending, binding & placing in
position complete up to two floor level
Particulars Quantity Rate Amount
A) Materials
1 Qunital
M.S. reinforcement
0.05 Quintal
Wastage @5%
1 Kg.
Black Iron wire
B)Labour-
1 No. ---------------
Black smith
1No. ------------------
Mazdoor
@0.5% (A+B)
Contingencies, T.& P.
Total ------------
C) Water charges @ 1% of total ------------

Total -----------

C) Profit including overhead @10% of Total


ANALYSIS OF RATE FOR REINFORCEMENT ( continued ----)
Providing mild steel reinforcement for R.C.C. work including bending, binding & placing in
position complete up to two floor level
Particulars Quantity Rate Amount
C) Water charges @ 1% of total ------------

Total -----------

D) Profit including overhead @10% of Total

Grand Total -------------