DETAILED ESTIMATES ASAP

Measurement & Calculation of Quantities of


materials requires:

i)Working Drawings with


- Detailed Dimensions
- Specifications

ii)Measurement Form
S.No Item Unit No. Length Breadth Height Total
Description Quantity

Dr. Bandana Jha, Professor, bjha@amity.edu 2


DETAILED ESTIMATES ASAP

Abstract of Estimate Calculation Requires:

i)Local Schedule of Item Rates based on


Specifications

ii)Abstract of Estimate Form Format:

Item Item Unit Quantity Rate Amount


No Description

Dr. Bandana Jha, Professor, bjha@amity.edu 3


TYPES OF ESTIMATES ASAP

Methods of Detailed Estimating

- Work Break Down / Bottom Up Method

- Final Abstract of Estimate

- Annual Repair Estimate

Dr. Bandana Jha, Professor, bjha@amity.edu 4


METHODS OF DETAILED ESTIMATES
ASAP

Work Break Down / Bottom Up Method

Work Breakdown Structure (WBS) is developed


during the planning stage of the project
Estimates are created for all tasks at the lowest level
of the WBS
These are accumulated to determine the estimates
for the whole project.
Bottom-up method is considered to be the most
accurate method for generating project estimates.
Determines budget or definitive estimates during the
planning phase and at the project start stage
Dr. Bandana Jha, Professor, bjha@amity.edu 5
SCHEDULE OF RATES ASAP

Dr. Bandana Jha, Professor, bjha@amity.edu 6


SCHEDULE OF RATES ASAP

Delhi Schedule of Rates 2018

Published by Central Public Works Department


The cost of each item of work is worked out from
the quantities that already computed in the details
measurement form at workable rate.
The total cost is worked out in the prescribed form
is known as abstract of estimated form.
10-15%of estimated Cost is allowed for Petty
Supervision, contingencies and Unforeseen items

Dr. Bandana Jha, Professor, bjha@amity.edu 7


METHODS OF DETAILED ESTIMATES
ASAP

Abstract Estimate

An Abstract summary of all estimates based on


WBS is prepared for generating final project
estimates.
Cost of each item of work is calculated from the
quantities that already computed in the detailed
measurement form at workable/published rate.
Total cost is worked out in a prescribed form known
as abstract of estimated form.
10-15%of estimated Cost is allowed for Petty
Supervision, contingencies and Unforeseen items
Dr. Bandana Jha, Professor, bjha@amity.edu 8
SCHEDULE OF RATES ASAP

Dr. Bandana Jha, Professor, bjha@amity.edu 9


SCHEDULE OF RATES ASAP

Dr. Bandana Jha, Professor, bjha@amity.edu 10


SCHEDULE OF RATES ASAP

Dr. Bandana Jha, Professor, bjha@amity.edu 11


SCHEDULE OF RATES ASAP

Dr. Bandana Jha, Professor, bjha@amity.edu 12


SCHEDULE OF RATES ASAP

Dr. Bandana Jha, Professor, bjha@amity.edu 13


ASAP

REFERENCES
1. CPWD Schedule of Rates 2018
2. Estimating & Costing in Civil Engineering by
B.N. Dutta , 2016 Edition

Dr. Bandana Jha, Professor, bjha@amity.edu 14

You might also like