You are on page 1of 42

AIRCRAFT ELECTRICAL

PRACTICAL

DECEMBER 2021
INTRODUCTION
• PERSYARATAN KURIKULUM AE SEMESTER IV.
• TARUNA/I WAJIB MENGIKUTI PRACTICAL A/C
ELECTRICAL 2 SKS.
• MENGIKUTI DAN MEMATUHI PERATURAN YG
BERLAKU SELAMA MENGIKUTI PRACTICAL.
• TARUNA/I WAJIB MEMBUAT LAPORAN
PRACTICAL SEBAGAI PENILAIN AKHIR STUDY.
TATIB PRACTICAL
1) TARUNA/I WAJIB ABSEN HADIR SELAMA MENGIKUTI
PRACTICAL DI HANGAR STTKD.
2) KETUA KELOMPOK BERTANGGUNG JAWAB ATAS
KERUSAKAN DAN KEHILANGAN PARTS/ TOOLS YG
DILAKUKAN SELAMA PRACTICAL.
3) MASING2 KELOMPOK MELAKUKAN BRIEFING THD
ANGGOTANYA DAN MENULISKAN LAPORAN HAND OVER
BOOK UTK KELOMPOK BERIKUTNYA.
4) TERLAMBAT > 15 MENIT MEMPENGARUHI NILAI
5) TERLAMBAT > 3 HARI LAPORAN PRACTICAL DINYATAKAN
FAIL.
BAHAN PRACTICAL
1) AMM B 737-200
2) IPC B 737-200
3) WDM B 737-200
4) PERKELOMPOK MEMBAWA KAIN LAP 3 BUAH,
1 NAMPAN PALSTIK UKURAN DIAMETER 30 CM,
LAKBAND KERTAS 1 ROLL DAN SPIDOL KECIL.
5) PERKELOMPOK MEMBUAT CATATAN H/O BOOK.
LAPORAN H/O BOOK
• NAMA KELOMPOK DAN ANGGOTANYA.
• DATE N TIME, NUMBER, SUBJECT, DESCRIPTION
REMOVAL/ INSTALL PARTS, CONTINOU BY :……..
• SETIAP AKHIR KEGIATAN
REMOVAL/INSTALLATION PARTS HARUS DITTD
OLEH MASING-MASING KETUA KELOMPOK
DAN DISAKSIKAN OLEH INSTRUKTUR/
PENGAWAS YG DITTD.
LAPORAN AKHIR PRACTICAL
1) TARUNA/I WAJIB MEMBUAT AKHIR LAPORAN
PRACTICAL.
2) ISI LAPORAN : INTRODUCTION, DESCRIPTION,
OPERATION, REMOVAL, INSTALLATION OF
PARTS, P/N & S/N PARTS/ COMPONENT &
EFFECT IF FAILURE, FOTO BUKTI DATA
COMPONENT. KESIMPULAN LAPORAN.
3) PERKELOMPOK PERSENTASI LAPORAN PKL.
B 737 - 200
CSD/GENERATOR
GEN CIRCUIT BREAKER
STBY POWER SYSTEM
CB STBY POWER SYSTEM
DC POWER DISTRIBUTION
ELECTRIC MOTORS
EMDP AC VOLTS
ENGINE START SYSTEM
PNEUMATIC STARTER
IGNITION START ENG SYSTEM
PENUGASAN PRACTICAL
• R/I PARTS/ COMPONENT NAME, P/N AND S/N
AND FOTO ( CONFIRMATION WITH IPC DATA )
• AREA CONTROL CAB/ COCKPIT.
• AREA E/E AND NOSE COMPARTMENT.
• AREA ENGINE SIDE.
• AREA M/W WELL HYDARULIC PANEL.
1. CONTROL CAB/ COCKPIT AREA
1) BUS PROTECTION PANEL.
2) GCU ENG 1/2 AND APU.
3) CB 115 VAC STBY BUS.
4) RELAY R 328 STBY POWER RELAY AUTO.
5) BTB 1 AND 2.
6) M 400 POWER TEST PANEL.
7) RELAY R1 BATT BUS.
8) TRANSFORMER T 34 AND T 32.
9) INDICATORS : LOAD AMP, FREQ/ AC & DC VOLTS GEN DRIVE 1/2
OIL TEMP. APU TEMP IND AND AC GEN.
10) GCB APU
2. E/E & NOSE COMPARTMENT AREA

1) TRU 1/2/3.
2) BATT CHARGER.
3) STATIC INVERTER.
4) A/C BATTRY.
5) 28 VAC TRANSFORMER.
6) GCB 1 & 2.
7) CT T7 & T9.
3. ENGINE SIDE & MAIN W/W AREA

1) CSD/ GENERATOR.
2) CURRENT TRANSFORMER CT 1 OR 2.
3) IGNITION EXCITER
4) IGNITION CABLE EXCITER
5) IGNITER PLUG
6) ENG START VALVE
7) EMDP SYSTEM 1 OR 2

You might also like