Professional Documents
Culture Documents
Gyaan Center
AREA
PROGRAMMING
AREAS AREA (IN SQ. M.)
CLASSROOM 1 30.25
CLASSROOM 2 34.47
CLASSROOM 3 35.66
CLASSROOM 4 34.03
CLASSROOM 5 33.90
CLASSROOM 6 33.15
CLASSROOM 7 33.57
CLASSROOM 8 38.62
CLASSROOM 9 40.39
CLASSROOM 10 33.72
COURTYARD 695.4
OFFICE 10.40
Circulation
(in axo view)
Color Areas
Courtyard
Classrooms(1-10)
Staff Room
Bathrooms
Office
Inferences
• The school is made of regionally available stone- Dabri
veneer and Jodhpur
Cons:
• No security rooms available at the entrance
• No parking for 2 wheelers, cycles
• No fire exit
• No facilities available for physically challenged
WISNER PILGER HIGH
SCHOOL
AREA
PROGRAMMING
SPACES AREA(IN SQ M.)
PK 39.26
K 75.66
MEDIA 52.71
OFFICE 46.81
COMMON 41.2
TOILETS 45.13
Inferences
• Natural daylighting
strategies
• optimal mix of
diffuse skylights,
clear windows, and
windows veiled with
a perforated metal
screen.
Admin area
Reception/waiting area: 25-30 sq. metre
Principal’s office: 10-15 sq. metre
Conference room: 30-35 sq. metre
Vice principal’s room: 10-15 sq. metre
Work/copy room: 10-15 sq. metre
Common rooms
• Common rooms: 0.1 sq. m per student (min-
25sq. m, max- 100sq. m)
• Regular features
include couches, televisions, coffee tables,
and other generic lounge furniture for
socializing.
• Each section of the school has a Common
Room for students where they can relax at
break and lunchtimes, with their Divisional
Heads at hand.
• Common rooms can also include sports room
, library, cafeteria, locker room, auditorium,
ground.
CASE STUDY 1 CASE STUDY 2 CASE STUDY 3
Name of building The Rajkumari Ratnavati Girl's School Maiden Hill Primary School Wisner-Pilger Public Schools Addition
Architect diana kelogg architects Building Design Partnership Ltd (BDP) BVH architecture
Girls School Built as a part of Gyaan
function of building Center primary school elementary school
location Salkha, Rajasthan 345001, India Newton Mearns, Glasgow G77, United Kingdom 801 18th St N, Wisner, NE 68791, United States
no. of storeys 2 2 2
surrounding land use in the middle of desert surrounds around 800 homes 6-12 school
construction completed 2021 August 19th 2019 2017
orientation N-W/ E-S south west E-W
climate Hot and dry summers are cool,winters are very cold & windy. It is mostly the summers are long and warm; the winters are
cloudy round the year freezing, snowy, and windy;
client CITTA Foundation East Renfrewshire Council Wisner-Pilger Schools
photography Vinay Panjwani David Barbour AJ Brown
no. of washrooms 2(combined) 50 6
no. of classroom 10 14 15
no. of users 180 students+15-20 teachers 550 405
“Wood for Good” special award for the best use of wood ,
awards won 2021 RIAS National Award Winner AD100
no. of parking slots none 140 Not part of primary school
Pv cells on roofs and automatic water optimal use of sunlight through orientation and
climate responsive features Use of solar panels
storage various other methods
student capacity per classroom 18 14/15 21
availability of open space yes(courtyard) yes yes
average size of class room 27-28 sq m 25 sq m (approx) 35 sq m for preperatory section
and 27-28 sq m. for primary
playing area % 65 19 34% for playing area
orientation of windows in classroom back Side Side