You are on page 1of 8

Republic of the Philippines

Department of Education
Caraga Region XIII
Division of Butuan City
Southeast Butuan District II
MAHAY INTEGRATED SCHOOL
Mahay, Butuan City

ACTION PLAN ON BRIGADA ESKWELA


SY 2020-2021

PERSONNEL
CONCERNS STRATEGIES/ACTIVITIES TARGET TIME FRAME EXPECTED OUTPUT
INVOLVED
Tapping potential partners
School Head
and stakeholders for the Invited potential partners and
Inviting potential partners Adopt-a-School
essential needs of the school stakeholders of school
and stakeholders of school Program Coordinator Whole Year Whole Year
through sending emails and
Teachers
letters

School Head Plants, plant boxes and flower pots


Landscaping and planting
Brigada Eskwela were put up to their designated
outside the front gate.
School Beautification Coord. One week January 18-22, places.
Grass cutting of school
Parents, Teachers, 2021
ground
stakeholders Visible area of the school like the
ground and pathways were
landscaped and beautified.

Supervise male teachers, and School Head


Repainting and repairing of other volunteer stakeholders Brigada Eskwela Walls, doors, chairs and desks and
chairs, desks, doors, walls for repainting and repairs of Coord. One week Jan 25-29, 2021 windows were repainted and
and windows. the identified furniture and Parents, Teachers, repaired.
part of the school. stakeholders
Conduct electrical rewiring , School Head,
Electrical Rewiring inspect parts of wiring that Brigada Eskwela New wiring was put up and out-
are exposed and replacing Coord. 2 days Feb 1-2, 2021 dated sockets were replaced.
old and out-dated sockets to Licensed Electrician,
new one for security and Teachers
safety measures.

Hire carpenters or designate School Head School roofing and ceiling were
Repairs of School roofing male teachers or potential Brigada Eskwela One week Feb. 8-12, 2021 repaired.
and ceiling volunteers for the repair of Coord.
ceiling and roofing Stakeholders

Cleaning-up of School Assign volunteers to clean the School Head


drainage drainage to avoid threat of Brigada Eskwela One day Feb. 19, 2021 Drainage was cleaned-up
dengue and other illness. Coord. Safety from any threatening
Stakeholders illness

Repainting of school roofing Hire painters for the -School Head


repainting or designate -Brigada Eskwela 2 weeks March 1-5, 2021 School roofing was repainted
potential volunteers to do the Coord. March 8-12, 2021
task -Stakeholders

Replacing of broken faucets Hire plumber or designate -School Head


and repairing of clogged potential volunteers to -Brigada Eskwela 2 days March 18-19, 2021 Broken faucets were replaced
toilet bowls replace the broken faucets Coord. clogged toilet bowls were repaired
and repair the clogged toilet -Stakeholders
bowls
-School Head
Repairing of Material Designate male teachers and -Brigada Eskwela
Recovery Facility other stakeholders to repair the Coord. 2 days March 25-26, 2021 Material Recovery Facility was
MRF -Stakeholders repaired
-Teachers

Prepared by:
TERRY JOY R. LUMINARIAS Noted:
Brigada Eskwela Coordinator ROSABELLE S. CUBILLAS
School Head

You might also like