Schematic Design Design Development Construction Documents PROCESS
Contractor Cost Estimation Contractor Cost Estimation Contractor Detailed Map Operations
Architect 3D Macro
Coordination Architect 3D Macro
Coordination Architect 3D Macro
Coordination
Planning Schematic Design Schematic Design Design Development Design Development Construction Documents Construction Documents
Author Schematic Design Develop Virtual Prototype Author Design Development Develop Virtual Prototype Author Construction Develop Virtual Prototype
Validate Program
Documents
Engineer Engineering
Analysis Engineer Engineering
Analysis Engineer Engineering
Analysis
Construction
Schematic Design Design Development Documents (WP)
Program Model Architectural Model Schematic Design Cost Schematic Design 4D Model Schematic Design Architectural Model Design Development Cost Design Development 4D Design Development Architectural Model CD (MP) 3D Macro CD (MP) CD (MP) Cost Record Model
Estimation Engineering Analysis Model Estimation Model Engineering Analysis Model Coordination Model 4D Model Estimation
Schematic Design 3D Macro Schematic Design 3D Design Development 3D Design Development 3D CD (MP) Engineering CD (MP) 3D Virtual CD (MP) 3D Micro
Coordination Model Virtual Prototypes Macro Coordination Model Virtual Prototypes Analysis Model Prototypes Coordination Model
Survey Existing
Facilities
Responsible Party
Survey Existing
Site Conditions
Responsible Party
Laser Scan
Existing
Conditions
Responsible Party
Incorporate
Contingencies/
Overhead
Contractor
NO NO NO
Set Construction
Sequencing and Prepare/Adjust
Flow Schedule
NO NO
START
PROCESS
Establish Information Create New of
Exchange Link 3D Elements Validate Accuracy Review 4D
Modify Previous YES Schedule YES
Requirements 3D Model to Activities of 4D Models Model Model/Schedule optimized END
correct? ?
PROCESS
Analyze Project
Site Data
NO NO
Responsible Party
Determine
Select a Building Is site
YES
Is
YES
Analyze Area Data acceptabl Building Location building
START Site Location e and and Orientation location END
PROCESS PROCESS
available acceptabl
? e?
Responsible Party Responsible Party Responsible Party
Generate Site
Analysis Model
Responsible Party
Site Information
Identify Building
Use/Type
Owner
NOT ACCEPTABLE
Generate
Identify Area Identify Final List Is site
Create Program Start Conceptual acceptabl ACCEPTABLE
START Requirements Design
Building Layout of Requirements e and END
PROCESS Program PROCESS
ming
available
?
Owner Owner Architect Owner
Identify Cost
Targets
Owner
Parametric Modeling
Content
Create Construction
Documentation Architecture
Create Schematic Design Create Design Development Model
Architecture Model Architecture Model
Architect
Architect Architect
Create Construction
Documentation Model
Create Schematic Design Create Development
Structural Model Architecture Structural Model NO
NO
NO Engineer
Engineer Engineer
Does the model
Does the model meet the
Does the model meet the requirements? END
Identify Content for Model Develop Initial Architecture
Identify Models Required meet the requirements? PROCESS
START
PROCESS
Creation Model
requirements? YES
YES
YES
All Disciplines All Disciplines Architect
Create Construction
Documentation MEP Model
Create Schematic Design MEP Create Development
Model Architecture MEP Model
Engineer
Engineer Engineer
Program Model Preliminary Architecture Architectural Model Structural Model Architectural Model Structural Model Architectural Model Structural Model
Model
NO
Compile Model
Perform
for
Constructability
Constructability
Review
Review
All Disciplines Contractor
Construction Type Library Space Type Library Mechanical System Library Energy Takeoff Analysis Method Weather Data
Assign Construction
Types to Building
Elements
Contractor
NO NO
Assign Outside Analyze Energy Prepare Report
Adjust BIM for Is model Export BIM for Review Energy
Design Criteria and YES Demand and for Results YES
START Energy Analysis Energy Targets
ready for Analysis Analysis Results acceptabl END
PROCESS simulatio Consumption Documentation PROCESS
n? e?
Responsible Party Mechanical Engineer Mechanical Engineer Mechanical Engineer Mechanical Engineer Mechanical Engineer
NO
Architecture Model Structural Design Model Structural Analysis Model Structural Design Model
(Draft)
LIGHTING ANALYSIS
Lighting Engineer
NO
Lighting Engineer
Architecture Model Other Applicable Models Structural Model Lighting Design Model Lighting Analysis Model Lighting Design Model
(Draft)
DESIGN COORDINATION
Create Model
Sharing System
BIM Coordinator
Define
Coordination
Meeting Location
BIM Coordinator
Define
Start Create Discipline Compile Perform Collision Identify Solutions
Information for Design Any YES
START Models Composite Model Detection collisions to Collisions
PROCESS Discipline Models Coordina
tion ?
Process
All Disciplines All Disciplines BIM Coordinator BIM Coordinator All Disciplines
NO
Establish a
Protocol to
Address Collisions
All Disciplines
Construction Equipment
Schedule Libraries
Add Construction
Equipment
Contractor
Analyze Site
Layout for Phase
Transition
NO NO
Contractor
Identify Determine Are all
phases Distribute Plan to
Construction Temporary YES Is plan YES
START analyzed acceptabl Various Parties END
PROCESS Phases Facilities (occurs PROCESS
for each e?
Contractor Contractor phase)? Contractor
Analyze Site
Layout for Space
and Time Conflict
Contractor
Insert Phased
Staging Areas
Contractor
Design Specifications and Schedule, Cost, and Labor Construction Families and
Intent Info Libraries 3D Controls Report
NO NO
Determine Scope Identify Alternative Coordinate Is Generate
Model Alternative Analyze Various Compare and constructi
of Work to be Construction Is model YES Construction Construction
START Methods Methods Select Options on YES END
PROCESS Analyzed Methods acceptabl Sequences sequence Plans PROCESS
e? acceptabl
Contractor Contractor Contractor Contractor Contractor Contractor e? Contractor
Project Submittal
Equipment Information Information COBIE Requirements
NO
NO
Facility Manager Facility Manager Facility Manager Responsible Party Responsible Party Facility Manager
Sensor Data Other Performance Data Performance Targets Performance Costs Weather Data
Facility Manager NO NO
Adjust BIM for Validate
Is model Prepare/Adjust Prepare/Adjust Perform
Performance Equipment Results
START ready for YES Schedule Schedule Maintenance acceptabl YES END
PROCESS Analysis simulatio Performance PROCESS
n? e?
Responsible Party Responsible Party Responsible Party Facility Manager Facility Manager
Facility Manager