You are on page 1of 11

Final Project Presentation

岱琪雅 , 何政堯 , 蘇芮帝


Increasing population and increasing economic activity
encourage an increase in the need for housing. The goals and
objectives of the construction of this apartment are arranged in a
plan that is in accordance with the conditions of spatial planning
and land use. Accompanied by environmental facilities and
infrastructure which functions for the social life.
Housing is one of the basic human needs. They need a home
to live. For this reason, this apartment was built in a location that is
quite crowded with residents and is in demand by the community.
With complete infrastructure and can cover all aspects of the
economy.
Aming is a worker, he live in Taipei for 5 years with a wife
and one daughters, he want to buy a house in Taipei, but he think it
will spend a lot of money, and he cant afford it for once. So he
1. Project
Background
think for the second option to build a house on his parents ground.
Aming plans to provide shelter for three generations. starting from
the generations of Aming and his siblings, to Aming's children and
grandchildren. but as long as Aming don't have grandchildren, then
the empty room house is planned to be rented out first

TREY 2
research
2. Project Description
• Project Name : 4-storey Apartment Development Project
• Bulding Function : Place to Live and Rent
• Project Location : Xi’an Road, Niaosong District, Kaohsiung
City, Taiwan
(22.6543661 , 120.3489680)
• Land Surface Area : 428,66m2
• Building Surfec Area : 83,5 m2 + 86,25m2

TREY 3
research
1st Floor

TREY
research
2nd Floor

TREY
research
3rd Floor

TREY
research
4th Floor

TREY
research
Rooftop

TREY
research
3D Design Plan

TREY
research
3. Flow Chart

TREY 10
research
ThankYou
岱琪雅
何政堯
蘇芮帝
4-storey Apartment Development Project

TREY 11
research

You might also like