2. Batch No. :5
3. Batch Members :
6. Target Audience (Who will be benefitted) : Every poor people dream is to construct a house
but due to their rate of living they cant build a house but our aim is to cinstruct a house in very
reasonable price so by thus every body can afford it.
7. User Perceptition: Due to this idea and implementing this ideas we can construct it in less
space it consumes only less money nd time also.
8. Problem Statement (Point of View):constructing a house in pipeline that which helps to live in
their own homes.
9. Design Goal/ Objective(How might we: The design for this we would make a pipe line
house that which was constructed by a lady in telgana. By her ideas and by our lans we
can make many houses in less land space .
And the goal is of living of
more and more peple in a less space is our main aim.
11. Duration in months : the time duration of one house in pipe line it takes 15 to 20 days
to complete .
12. Estimated cost of the Project: per each house it costs nearly 1 lakhs.
so for this many of the problem hence we are constructing this pipe line house for very
reasonable .
in now days we are seeing such problems day by day so decrease this hence we are constructing
this pipe line house for budget friendly
due to this we can make any poor peoples dream to as of many of peoples dreams is of
constructing this houses
14. Novelty Importance of the proposed project in the context of current status : The novality of
project is “I have seen how people live under thatched roofs in urban slums. And when it rains,
they lose everything. The best part of OPod is that it is as good as a regular house and can be
translocated.”
Though container homes are available in similar segments at present, Manasa says her OPods are
cooler inside and have a longer life. Apart from low-cost housing for the poor, she has designs
that could be used by resorts, restaurants, mobile homes, mobile clinics, guest houses,
guardrooms, etc.
15.1. Methodology: The project main methodology is to create some more livingh
15.2. Organization of work elements: like pipeline ,bathromm essentilas and electric
city essentoals like pipes wires and all needed accessories for constructing a
house we required here.
15.3. Time schedule of activities giving milestones.: It take nearly just 15 to 20 days
S. No Software / Hardware
Item Specifications Budget (in Rupees)
Components