SIP GROUP 1
PROPOSAL
SIP GROUP 1
PROPOSAL
Name of Proponents:
Project Time-frame:
2nd week – Actual proposal of the chosen prototype, approving or rejecting of the PIP, if
rejected think of another prototype and make another proposal, and if approved think of ways
how to improve and beautify the prototype for the next week.
3rd week – The making of the prototype if approved, and the representation of the
prototype, which is already a physically made one to be shown and presented in front of the
class, a continuation of the editing of the digital prototype will also be held this week, we will
also be preparing the tarpaulin when it is needed for the presentation.
I. Project Contacts
Name Title/Role Numbers Email Address
1. To be able to make a proposal about making a prototype that measures quantity in physics
2. To be able to understand the concept of the prototype, and how it works, while acknowledging
the laws of physics around it.
3. If approved, being able to make an actual physical prototype that is functional in consideration
of aesthetic designing.
V. Project Methodology
Objectives Activity Duration
We had a Doing We must complete the task by
brainstorming Research the deadline.
meeting. The
research team should Making a
already have done project Date started: November 29
their research; after proposal (Tuesday)
doing the research,
we will proceed with Deadline: December 1
making our project (Thursday)
proposal.
B. Project Deliverables
The first set of deliverables consists of the pre-assembled parts of the hydraulic JCB that
must be put together to create the JCB. The Foundation of a hydraulic JCB is laid by the Base.
The hydraulic JCB’s forearm will cause it to rise and lower, followed by the digging bucket,
which is the component that scoops up objects. The hydraulic JCB’s stem allows it to bend. The
glue will hold the little sticks to the parts so that they won’t fall off as the small sticks will
secure and join the parts together. The silicone hoses are premeasured and are used to transport
liquid from the controller to the hydraulic JCB. After that, the bottles that contain colored liquid
is also provided. The controller is given and is used to regulate and control the hydraulic JCB’s
parts. The syringes in each part and the controller, as well as all of the part’s precut holes, are
already made, just like the popsicle sticks in the bucket. And last but not least the cable ties that
are already applied to each part with the syringe. The parts are then already created in
accordance with the client’s requests (colors and drawings).