1. Optimization of expenses
2. To control wastage of potable water
3. Treatment of leakage and seepage to minimize the use of
dewatering pump to save electricity.
4. Minimising Boiler losses, heat loss and maintaining operation
parameters to enhance GHR
5. Reduction in maintenance cost.
6. Set up Solar Power generation within plant boundaries to lower
auxiliary power consumption
7. Utilisation of mill reject to gain some financial benefits
8. Reduce Specific oil consumption and raw water consumption
below 2 l/kwh
Effectiveness
10.Unit#2 & 3 ESP hopper RTD’s (40 no’s)to be shift from micro PLC to
main PLC so RTD’s values reliability will be increase, easy for trouble
shooting and electronic cards spare cost will be reduce.
11.Unit#2 & 3 mill MDV SOV’s to be shift from classifier floor to HAG floor
so SOV damages and malfunctioning will be reduce and spare
consumption will be reduced.
12.Chp-wagon tippler clamp and release,sov cables jb mounted on tippler
wall,jbs tbs getting shortened due to rainy season, which leads to
interruption in delay of wagons tippling, affects demurrage charges
modification planned to put jbs independent of wall. which avoids
shortening of cables tbs.
13.Belt cutting to be avoided.
14.Improvement on equipment efficiency and reliability (sudden
equipment failure).
15.To improve the workmanship to increase the durability of work
16.HP Bypass and LP Bypass valve passing in U#3 & U#4 - It is
frequently observed in HP bypass and LP bypass valves passing after
OH of both valves. Need to be weld seat area by high hardened 9
electrodes.
Safety
1. Road & drain repairing & new roads across entire plant
2. Ash/ Coal vehicles Parking area at main gate to be concrete/hard
base
3. Safety Protocols, Defects Identification & Redressed.
4. Road safety
?
1. One more HRSCC (High Rate Solid Contact Clarifiers) for PT Plant for
any emergency maintenance in HRSCC and all 03 units are smooth
operation, Present only 02 No’s HRSCC are available.
2. One more ETP Clarifier for WTP Plant for any emergency maintenance
in ETP and all 03 units are smooth operation, Present only 02 No’s ETP
are available.
3. Shed for incoming & out going vehicles near ash silo.
4. Testing of coal sample
5. Increase number of leaves
6. Employee Engagement activities must start.
7. Review & modification of existing HR policies.
8. Plant runs due to coordination of all departments, all departments are
equally important just like our body parts. Each department equally
contributes in successful running of the plant. No department and its
people are burden but all are qualified professionals and assets to the
organization. We should treat them accordingly.
9. Proper planning
Availability
12