EMBEDDED BASED SUBSTATION LEAKAGE

CURRENT MANAGEMENT ON ELECTRICAL


EQUIPMENT THROUGH IOT
TEAM MEMBERS:
1.A.KAVITHA@SANTHIYA
2.T.KAVIYA
3.A.KOWSALYA
4.K.MEENA

PROJECT GUIDE:
Dr. P.ANITHA (AP, EEE)
EXISTING SYSTEM

• THE EXISTING SYSTEM IS BASED ON MANUAL ONSITE


VERIFICATION.

• THE PROTECTIVE DEVICES SUCH AS CB, RELAY AND FUSES ARE


RESPONSIBLE FOR PROTECTING TRANSMISSION LINES.

• THE MAN EFFORT IS NEEDED FOR VERIFYING LINE


PARAMETERS.

• THE TIME TAKEN FOR THIS SYSTEM IS COMPARATIVELY LARGE.


LITERATURE SURVEY

According to base paper, the project design for


monitoring leakage current in high voltage electrical
substation is proposed based on wireless technology. This
paper has demonstrated the feasibility of a novel wireless
condition monitoring system for application in high voltage
electrical substations. The system can be used as a standalone
device or part of a multi sensor network to measure leakage
current and voltage in a variety of equipment. But one
drawback, this project is based on manual onsite verification.
So we can’t trip the fault automatically.
PROPOSED SYSTEM

• THE PROPOSED SYSTEM IS INDIVIDUALLY MONITOR THE


VOLTAGE, CURRENT AND TEMPERATURE.

• THE PROPOSED SYSTEM IS FULLY UTILIZING THE


EMBEDDED SYSTEM AS WELL AS WIRELESS
COMMUNICATION PROTOCAL TO SAFEGUARD THE WHOLE
POWER SYSTEM FROM THE SERIOUS ACCIDENTS.

• THE SYSTEM IS TRIPPING THE FAULT AUTOMATICALLY BY


MEANS OF IOT INTERFACE.
BLOCK DIAGRAM
Power supply
LCD
+5v GND

PT
V-I attenuator Driver Relay
CT

Relay FAN
Temperature Atmega
sensor 328
IOT

load load
ALGORITHM

• Step 1: Start
• Step 2: Initialize the LCD, V, C, T, CB and BUZ
• STEP 3: Set the pin mode. V=A0 (input), C=A1 (input), T=A2 (input), CB=10
(output), BUZ=11 (output).
• Step 4: Clear LCD.
• Step 5: Monitoring Voltage, Current, Temperature.
• Step 6: Read analog.
• Step 7: Check the condition V<180. if this condition is satisfied go to step
8. otherwise go to step 9.
• Step 8: Print “Voltage Low” digital write CB Low and digital write BUZ
High.
• Step 9: Check the condition V>250. if this condition is satisfied go to step
10. otherwise go to step 11.
• Step 10: Print “Voltage High” digital write CB Low and digital write BUZ
High.
• Step 12: Print “Current High” digital write CB Low and digital write
BUZ High.
• Step 13: Check the condition T>40. if this condition is satisfied go to
step 14.
• Step 14: Print “Temp High” digital write CB Low and digital write
BUZ High.
• Step 15: If any condition is not satisfied go to step 16.
• Step 16: Print “OK” digital write CB High and digital write BUZ Low.
• Step 17: Print the results are Voltage, Current, Temperature and
Status.
• Step 18: Stop
SIMULATION
SIMULATION RESULT

RV1-variable resistor in Voltage sensor equivalent circuit.


RV2-variable resistor in Current sensor equivalent circuit.
U1-value in Temperature sensor.
Results are display on LCD.

Condition 1: RV1=50% and RV2= 53% and U1=35


RESULT:
Condition 2: RV1=35% and RV2=65% and U1=24
RESULT:

Condition 3: RV1=50% and RV2=35% and U1=44


RESULT:
WORK PLAN

DECEMBER 3RD WEEK LITERATURE SURVEY


DECEMBER LAST WEEK SIMULATION
JANUARY 1ST WEEK SOFTWARE
JANUARY 2ND WEEK SIMULATION AND SOFTWARE
TESTING
JANUARY 3RD WEEK COMPONENTS PURCHASING
JANUARY LAST WEEK HARDWARE DESIGN
FEBRUARY 1ST WEEK HARDWARE FABRICATION AND
ASSEMBLY
FEBRUARY 2ND WEEK HARDWARE TESTING
FEBRUARY 3RD WEEK IMPLEMENTATION AND RESULT
FEBRUARY 4TH WEEK GOING TO TTPS
FEBRUARY LAST WEEK PROJECT VERIFICATION
THANK YOU